Title Page
-
Conducted on
-
Prepared by
-
Location
Reviewed Department
-
Which department are you reviewing?
- Frame
- Floor
- Wall
- Top
- Electrical
- Exterior
- Front Door
- Moulding
- Final Finish
- Shipping/Receiving
- Cabinet
Electrical
-
All equipment is shut-down and unplugged at end of day?
-
Are panel box breakers labeled clearly?
-
Are any electrical panels or disconnect switches blocked?
-
All electrical appliances are rated for industrial use (fans, cords, power strips, ...)?
-
Are flexible cords running over sprinkler piping, under doors, through walls, through ceilings, or through windows?
-
All opening in electrical panels and boxes closed (knock outs, breaker openings, ...)?
-
Do any extension cords have damage?
-
Are extension cords stored properly when not in use?
-
Is there any loose or broken electrical conduit?
-
Are lockouts used on light switches while home is energized?
Signature
-
Supervisor's Signature