Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Electrical Safety.

General

  • Has the person(s) responsible on site for the management of Electrical Safety been identified?

  • Does he/she/they, understand their responsibilities?

Fixed Installation Testing

  • Has the complete site fixed wiring installation been subject to a 100% inspection in the last 5 years?

  • Have all the corrective actions from the last inspection been addressed?

  • Has a minimum of 30% of the site fixed wiring installation been tested in last 12months

  • Select date

  • Have all the corrective actions from the last inspection been addressed?

  • Are the records for Fixed Installation Testing held on site (in a folder or on Pemac)

Portable Appliance Testing

  • Have all Portable Appliances on site been tested in the last 12 months?

  • Select date

  • Are the records for Portable Appliance Testing held on site (in a folder or on Pemac)

Thermographic Survey

  • Has the site electrical installation (DB Boards, Panel Boards, Control Panels Etc.) been subject to a Thermographic Survey in the last 12 months?

  • Select date

Emergency Lighting

  • Has 100% of the sites Emergency Lighting been subject to test in the last 12 months?

  • Select date

Major Corrective Actions.

Minor Corrective Actions

Recommendations .

  • Site Representative.

  • Auditor.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.