  • Gas Installation Safety Inspections

1. General

  • 1.1. Has the person(s) responsible on site for the management of Gas Installations on site been identified?

2. Mains Gas Installations

  • 2.1 Has the site identified all Mains Gas installations (including metering, pressure reducing stations, distribution pipework and connected equipment ) on site with a Pemac Plant Item Number?

  • 2.2 Are they routines in place to inspect the equipment identified ?<br>

  • 2.3 Do they routines cover leak detection as minimum once every 12 months?<br><br>

  • 2.4. Has the history been updated following the inspections?

3. Bottle or Tank Gas Installations

  • 3.1. Has the site identified all Bottle & Tank Gas installations (including metering, pressure reducing stations, flexible hoses, distribution pipework and connected equipment ) on site with a Pemac Plant Item Number?

  • 3.2. Are they routines in place to inspect the equipment identified ?<br>

  • 3.2. Do they routines cover leak detection as minimum once every 12 months?<br><br>

Major Corrective Actions

Minor Corrective Actions.

Recommendations.

  • Site Representive.

  • Auditor.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.