Title Page

  • Site photo

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Site manager

Council and Pit

  • Pit finish level

  • Pit depth

  • Pit opening size

  • Trench Grate

  • Orifice size

  • Location of the Pit

  • Bottom of the pit constructed with required slopeĀ <br>

  • Iron steps

  • Overflow

  • Size of pipe inside the pit

  • Pit rendering

Inspection

  • Storm water tapping (Council)

  • Final inspection (Engineer if required such as Maroondah)

  • Final civil/Engineer inspection (Council)

Other

  • Stack located on designed location

  • Pit allowed under decking area

  • Sufficient Pit in backyard

  • Sewage ORG installed

  • Sewage IS installed

  • Sewage Vent installed

Water Tank

  • Charge pipe installed as per plan

  • No blockage on charge pipe

  • Charge pipe allowed on water tank designed location

  • Overflow allowed on water tank designed location

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.