Information
-
Document No.
-
Weekly HazMat Inspection
-
Conducted on
Biohazard / Chemo Waste Room
Location of Inspection
-
Bio Hazard-Chemo waste room
-
Hazmat Shed
-
Inspected By Ray Leblanc
-
Check area to ensure hazardous waste is clearly separated non-hazardous materials
-
Ensure all flammables are in flammable cabinet.
-
Check to insure proper PPE is available and is in designated location. Replace /reorder PPR as required.
-
Check overall cleanliness of area.
-
No leaks noted
-
No Deterioration to containers noted
-
Containers closed?<br>
-
Containers / items labeled properly? <br>
-
Dates < 90 days?<br>
-
Adequate aisle space?<br>
-
Fire extinguisher in working order and current inspection?<br>
-
Spill control equipment in order?<br>
-
Containers covered if outside?<br>
-
Notes or Worker Order
-
Add signature