Information

  • Document No.

  • Weekly HazMat Inspection

  • Conducted on

Biohazard / Chemo Waste Room

Location of Inspection

  • Bio Hazard-Chemo waste room

  • Hazmat Shed

  • Inspected By Ray Leblanc

  • Check area to ensure hazardous waste is clearly separated non-hazardous materials

  • Ensure all flammables are in flammable cabinet.

  • Check to insure proper PPE is available and is in designated location. Replace /reorder PPR as required.

  • Check overall cleanliness of area.

  • No leaks noted

  • No Deterioration to containers noted

  • Containers closed?<br>

  • Containers / items labeled properly? <br>

  • Dates < 90 days?<br>

  • Adequate aisle space?<br>

  • Fire extinguisher in working order and current inspection?<br>

  • Spill control equipment in order?<br>

  • Containers covered if outside?<br>

  • Notes or Worker Order

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.