Title Page

  • Aspec Weekly Inspection Checklist

  • Site

  • Conducted on

  • Prepared by

  • Personnel

1. Site Control

  • 1.1 Hazard board and signage up to date

  • 1.2 Environmental plan, Issues

  • 1.3 Toolbox talk last date

  • Select date

  • 1.4 Safety induction for all on site

  • 1.5 Safety notice board current

2. Site Facilities

  • 2.1 Office clean, adequate and good lighting

  • 2.2 Smoko shed clean and potable water

  • 2.3 Toilets clean, washing water

  • 2.4 Tool and equipment storage adequate

3. General Site Tidiness and Access Ways

  • 3.1 Clear safe access to work areas

  • 3.2 Stairways and emergency access clear

  • 3.3 Hoarding fences and gates secure

  • 3.4 Loose materials secured from wind

  • 3.5 Adequate temporary lighting

4. Personal Protective Equipment (PPE)

  • 4.1 Hi-Vis clothing being worn

  • 4.2 Hard hats being worn

  • 4.3 Correct footwear being worn

  • 4.4 Correct hearing protection being worn

  • 4.5 Correct mask being worn for the task

5. First Aid

  • 5.1 First Aid box available

  • 5.2 Is the first aid box current

  • 5.3 Accident register available

6. Fire Prevention

  • 6.1 Fire extinguishers available

  • 6.2 Fire extinguisher current (12 months or 5 years)

  • 6.3 Sufficient number on site

  • 6.4 Evacuation procedure current

  • 6.5 Evacuation drill completed in the last 6 months

7. Cranes / Hoist / Lifting Equipment

  • 7.1 Lifting plan completed

  • 7.2 Crane certification current

  • 7.3 Slings / Chains certified

  • 7.4 Emergency plan in place

8. Compressed Air Equipment

  • 8.1 Good working condition

  • 8.2 Appropriate guards fitted

9. Welding and Cutting

  • 9.1 Hot works permit issued

  • 9.2 Fire extinguisher on hand and tested

  • 9.3 Correct PPE being used

10. Excavations

  • 10.1 Correctly shored - edge protection in place

  • 10.2 De-watered

  • 10.3 Correct access into excavation

  • 10.4 Correct crossing over excavation

11. Civil Plant

  • 11.1 Roll cage in use

  • 11.2 Seatbelt in use

  • 11.3 Good working order

  • 11.4 TMP in place

12. Electrical Equipment

  • 12.1 Main board lockable and weatherproof

  • 12.2 Leads damage free and current tested and tagged

  • 12.3 Lifeguard current test and tagged

  • 12.4 Tools current test and tagged

  • 12.5 Leads safely placed

  • 12.6 Appropriate guards on tools

  • 12.7 Correct grinders used - Deadman switch / Handle / Guard / Kickback protection

13. Chemicals

  • 13.1 Hazardous substance register

  • 13.2 Safety Data Sheets available

  • 13.3 Using correct PPE

  • 13.4 Correctly stored

14. Powder Actuated Tool (PAT)

  • 14.1 WOF current

  • 14.2 Staff trained - current license

  • 14.3 Warning sings displayed

15. Mobile Scaffold

  • 15.1 Wheels locked

  • 15.2 Braces correctly fitted

  • 15.3 Outriggers fitted when scaffold is 3 X width<br>2 outriggers when mobile is against a wall<br>4 outriggers when mobile is free standing

  • 15.4 Decking / Handrails / Toe boards and ladders fitted

16. Scaffolding

  • 16.1 Scaftag current for scaffold over 5 metres

  • 16.2 Handrails - Top rail between 900 & 1100mm. Mid rail 450mm

  • 16.3 Platform clear and trip free

  • 16.4 Toe boards installed

  • 16.5 Ladders Stairs secure

  • 16.6 Base sound and level / supported

  • 16.7 Planks tied down

  • 16.8 Ties and bracing adequate

  • 16.9 Headroom clear

17. Elevated Work Platform

  • 17.1 Certification current

  • 17.2 Operator competent

  • 17.3 Work on level and firm ground

  • 17.4 Correct PPE in use

  • 17.5 Emergency procedure in place (written rescue plan)

18. Ladders

  • 18.1 Commercial or Industrial grade

  • 18.2 Locking bar or pin in place - step / folding ladders

  • 18.3 Secured top and bottom - extension / telescopic ladder

  • 18.4 Working 2 steps down from top of ladder

  • 18.5 Ladder more than 1 metre above the work area and 4/1 angle

19. Propping

  • 19.1 Is inspected and certified by a qualified engineer as safe for its intended use

  • 19.2 Designed , constructed and maintained to support safely all loads that are to be placed on it

  • 19.3 Hazard and risk assessment completed (TA)

20. Fall Hazards

  • 20.1 Floor edges

  • 20.2 Floor openings

  • 20.3 Lift shafts

  • 20.4 Stairs

  • Corrective actions need to be addressed in 7 days from last inspection Link corrective action to a person Link a date to by when action completed b

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.