Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Plot Number

Weekly Fit Out Progress

Pre Fit Out Level 14

  • Screed

  • Sole plates installed

  • Shutter and back fill

  • Flat Duct Install

  • SVP & RWP floor plate confirmation

Apartment Fit Out Level 14

  • Pre Drylining hold point

  • Drylining load out

  • Utility cupboard- Drylining and skim

  • Partition & 1st fix side

  • Noggins

  • Mechanical 1st Fix

  • Lagging

  • Electrical 1st Fix

  • Internal wall fire stop

  • Wall closure

  • 2nd Fix Drylining

  • Apartment letter box fire stopping

  • Fire tape and Fire mastic (Above Ceiling)

  • Ceiling grid install

  • Fit sprinkler head and install

  • NHBC void inspection

  • Board Ceiling

  • Tape and Joint

  • Sanding down

  • Wedi/Duka board floor build up

  • Sealer/Mist coat

  • Bath Support batten

  • Kitchen Pre-Plumb

  • Shower tray/ Bath / WC basin install

  • HIU & Raditor installation

  • Kitchen tiling

  • 2nd Fix plumbing

  • Water on / Flood test / SVP test

  • 2nd Fix Electrical

  • Permanent Power Live Test

  • Pre Dec / Make good drylining

  • Pre Dec hold point

  • Pre Dec clean

  • Final Decoration & 1st Coat FED

  • Final Fix Electrical

  • Final Fix Plumbing

  • Builders clean

  • Test smoke head & Sounders

  • Access control system commissioning

  • Commission heating and cooling system

  • Domestic water (Temps & Flow rates)

  • FCU secondary air balancing

  • Fire Alarm system commissioning

  • Flood test condense from FCU

  • Flush, Clean and dose apartment

  • Heating and cooling controls commissioning

  • HIU Commissioning

  • MVHR vent commissioning

  • TV system commissioning

  • Functionality testing

  • HIU Ceiling grid installation

  • Carpet install

  • Fit wardrobe and HIU front

  • Mastic

  • BCSL snag

  • De snag (All Trades)

Level 13

Pre Fit Out

  • Screed

  • Sole plates installed

  • Shutter and back fill

  • Flat Duct Install

  • SVP & RWP floor plate confirmation

Apartment Fit Out Level 13

  • Pre Drylining hold point

  • Drylining load out

  • Utility cupboard- Drylining and skim

  • Partition & 1st fix side

  • Noggins

  • Mechanical 1st Fix

  • Lagging

  • Electrical 1st Fix

  • Internal wall fire stop

  • Wall closure

  • 2nd Fix Drylining

  • Apartment letter box fire stopping

  • Fire tape and Fire mastic (Above Ceiling)

  • Ceiling grid install

  • Fit sprinkler head and install

  • NHBC void inspection

  • Board Ceiling

  • Tape and Joint

  • Sanding down

  • Wedi/Duka board floor build up

  • Sealer/Mist coat

  • Bath Support batten

  • Kitchen Pre-Plumb

  • Shower tray/ Bath / WC basin install

  • HIU & Raditor installation

  • Kitchen tiling

  • 2nd Fix plumbing

  • Water on / Flood test / SVP test

  • 2nd Fix Electrical

  • Permanent Power Live Test

  • Pre Dec / Make good drylining

  • Pre Dec hold point

  • Pre Dec clean

  • Final Decoration & 1st Coat FED

  • Final Fix Electrical

  • Final Fix Plumbing

  • Builders clean

  • Test smoke head & Sounders

  • Access control system commissioning

  • Commission heating and cooling system

  • Domestic water (Temps & Flow rates)

  • FCU secondary air balancing

  • Fire Alarm system commissioning

  • Flood test condense from FCU

  • Flush, Clean and dose apartment

  • Heating and cooling controls commissioning

  • HIU Commissioning

  • MVHR vent commissioning

  • TV system commissioning

  • Functionality testing

  • HIU Ceiling grid installation

  • Carpet install

  • Fit wardrobe and HIU front

  • Mastic

  • BCSL snag

  • De snag (All Trades)

Pre Fit Out Level 12

  • Screed

  • Sole plates installed

  • Shutter and back fill

  • Flat Duct Install

  • SVP & RWP floor plate confirmation

Apartment Fit Out Level 12

  • Pre Drylining hold point

  • Drylining load out

  • Utility cupboard- Drylining and skim

  • Partition & 1st fix side

  • Noggins

  • Mechanical 1st Fix

  • Lagging

  • Electrical 1st Fix

  • Internal wall fire stop

  • Wall closure

  • 2nd Fix Drylining

  • Apartment letter box fire stopping

  • Fire tape and Fire mastic (Above Ceiling)

  • Ceiling grid install

  • Fit sprinkler head and install

  • NHBC void inspection

  • Board Ceiling

  • Tape and Joint

  • Sanding down

  • Wedi/Duka board floor build up

  • Sealer/Mist coat

  • Bath Support batten

  • Kitchen Pre-Plumb

  • Shower tray/ Bath / WC basin install

  • HIU & Raditor installation

  • Kitchen tiling

  • 2nd Fix plumbing

  • Water on / Flood test / SVP test

  • 2nd Fix Electrical

  • Permanent Power Live Test

  • Pre Dec / Make good drylining

  • Pre Dec hold point

  • Pre Dec clean

  • Final Decoration & 1st Coat FED

  • Final Fix Electrical

  • Final Fix Plumbing

  • Builders clean

  • Test smoke head & Sounders

  • Access control system commissioning

  • Commission heating and cooling system

  • Domestic water (Temps & Flow rates)

  • FCU secondary air balancing

  • Fire Alarm system commissioning

  • Flood test condense from FCU

  • Flush, Clean and dose apartment

  • Heating and cooling controls commissioning

  • HIU Commissioning

  • MVHR vent commissioning

  • TV system commissioning

  • Functionality testing

  • HIU Ceiling grid installation

  • Carpet install

  • Fit wardrobe and HIU front

  • Mastic

  • BCSL snag

  • De snag (All Trades)

Pre Fit Out Level 11

  • Screed

  • Sole plates installed

  • Shutter and back fill

  • Flat Duct Install

  • SVP & RWP floor plate confirmation

Apartment Fit Out Level 11

  • Pre Drylining hold point

  • Drylining load out

  • Utility cupboard- Drylining and skim

  • Partition & 1st fix side

  • Noggins

  • Mechanical 1st Fix

  • Lagging

  • Electrical 1st Fix

  • Internal wall fire stop

  • Wall closure

  • 2nd Fix Drylining

  • Apartment letter box fire stopping

  • Fire tape and Fire mastic (Above Ceiling)

  • Ceiling grid install

  • Fit sprinkler head and install

  • NHBC void inspection

  • Board Ceiling

  • Tape and Joint

  • Sanding down

  • Wedi/Duka board floor build up

  • Sealer/Mist coat

  • Bath Support batten

  • Kitchen Pre-Plumb

  • Shower tray/ Bath / WC basin install

  • HIU & Raditor installation

  • Kitchen tiling

  • 2nd Fix plumbing

  • Water on / Flood test / SVP test

  • 2nd Fix Electrical

  • Permanent Power Live Test

  • Pre Dec / Make good drylining

  • Pre Dec hold point

  • Pre Dec clean

  • Final Decoration & 1st Coat FED

  • Final Fix Electrical

  • Final Fix Plumbing

  • Builders clean

  • Test smoke head & Sounders

  • Access control system commissioning

  • Commission heating and cooling system

  • Domestic water (Temps & Flow rates)

  • FCU secondary air balancing

  • Fire Alarm system commissioning

  • Flood test condense from FCU

  • Flush, Clean and dose apartment

  • Heating and cooling controls commissioning

  • HIU Commissioning

  • MVHR vent commissioning

  • TV system commissioning

  • Functionality testing

  • HIU Ceiling grid installation

  • Carpet install

  • Fit wardrobe and HIU front

  • Mastic

  • BCSL snag

  • De snag (All Trades)

Pre Fit Out Level 10

  • Screed

  • Sole plates installed

  • Shutter and back fill

  • Flat Duct Install

  • SVP & RWP floor plate confirmation

Apartment Fit Out Level 10

  • Pre Drylining hold point

  • Drylining load out

  • Utility cupboard- Drylining and skim

  • Partition & 1st fix side

  • Noggins

  • Mechanical 1st Fix

  • Lagging

  • Electrical 1st Fix

  • Internal wall fire stop

  • Wall closure

  • 2nd Fix Drylining

  • Apartment letter box fire stopping

  • Fire tape and Fire mastic (Above Ceiling)

  • Ceiling grid install

  • Fit sprinkler head and install

  • NHBC void inspection

  • Board Ceiling

  • Tape and Joint

  • Sanding down

  • Wedi/Duka board floor build up

  • Sealer/Mist coat

  • Bath Support batten

  • Kitchen Pre-Plumb

  • Shower tray/ Bath / WC basin install

  • HIU & Raditor installation

  • Kitchen tiling

  • 2nd Fix plumbing

  • Water on / Flood test / SVP test

  • 2nd Fix Electrical

  • Permanent Power Live Test

  • Pre Dec / Make good drylining

  • Pre Dec hold point

  • Pre Dec clean

  • Final Decoration & 1st Coat FED

  • Final Fix Electrical

  • Final Fix Plumbing

  • Builders clean

  • Test smoke head & Sounders

  • Access control system commissioning

  • Commission heating and cooling system

  • Domestic water (Temps & Flow rates)

  • FCU secondary air balancing

  • Fire Alarm system commissioning

  • Flood test condense from FCU

  • Flush, Clean and dose apartment

  • Heating and cooling controls commissioning

  • HIU Commissioning

  • MVHR vent commissioning

  • TV system commissioning

  • Functionality testing

  • HIU Ceiling grid installation

  • Carpet install

  • Fit wardrobe and HIU front

  • Mastic

  • BCSL snag

  • De snag (All trades)

Pre Fit Out Level 09

  • Screed

  • Sole plates installed

  • Shutter and back fill

  • Flat Duct Install

  • SVP & RWP floor plate confirmation

Apartment Fit Out Level 09

  • Pre Drylining hold point

  • Drylining load out

  • Utility cupboard- Drylining and skim

  • Partition & 1st fix side

  • Noggins

  • Mechanical 1st Fix

  • Lagging

  • Electrical 1st Fix

  • Internal wall fire stop

  • Wall closure

  • 2nd Fix Drylining

  • Apartment letter box fire stopping

  • Fire tape and Fire mastic (Above Ceiling)

  • Ceiling grid install

  • Fit sprinkler head and install

  • NHBC void inspection

  • Board Ceiling

  • Tape and Joint

  • Sanding down

  • Wedi/Duka board floor build up

  • Sealer/Mist coat

  • Bath Support batten

  • Kitchen Pre-Plumb

  • Shower tray/ Bath / WC basin install

  • HIU & Raditor installation

  • Kitchen tiling

  • 2nd Fix plumbing

  • Water on / Flood test / SVP test

  • 2nd Fix Electrical

  • Permanent Power Live Test

  • Pre Dec / Make good drylining

  • Pre Dec hold point

  • Pre Dec clean

  • Final Decoration & 1st Coat FED

  • Final Fix Electrical

  • Final Fix Plumbing

  • Builders clean

  • Test smoke head & Sounders

  • Access control system commissioning

  • Commission heating and cooling system

  • Domestic water (Temps & Flow rates)

  • FCU secondary air balancing

  • Fire Alarm system commissioning

  • Flood test condense from FCU

  • Flush, Clean and dose apartment

  • Heating and cooling controls commissioning

  • HIU Commissioning

  • MVHR vent commissioning

  • TV system commissioning

  • Functionality testing

  • HIU Ceiling grid installation

  • Carpet install

  • Fit wardrobe and HIU front

  • Mastic

  • BCSL snag

  • De snag (All trades)

Pre Fit Out Level 08

  • Screed

  • Sole plates installed

  • Shutter and back fill

  • Flat Duct Install

  • SVP & RWP floor plate confirmation

Apartment Fit Out Level 08

  • Pre Drylining hold point

  • Drylining load out

  • Utility cupboard- Drylining and skim

  • Partition & 1st fix side

  • Noggins

  • Mechanical 1st Fix

  • Lagging

  • Electrical 1st Fix

  • Internal wall fire stop

  • Wall closure

  • 2nd Fix Drylining

  • Apartment letter box fire stopping

  • Fire tape and Fire mastic (Above Ceiling)

  • Ceiling grid install

  • Fit sprinkler head and install

  • NHBC void inspection

  • Board Ceiling

  • Tape and Joint

  • Sanding down

  • Wedi/Duka board floor build up

  • Sealer/Mist coat

  • Bath Support batten

  • Kitchen Pre-Plumb

  • Shower tray/ Bath / WC basin install

  • HIU & Raditor installation

  • Kitchen tiling

  • 2nd Fix plumbing

  • Water on / Flood test / SVP test

  • 2nd Fix Electrical

  • Permanent Power Live Test

  • Pre Dec / Make good drylining

  • Pre Dec hold point

  • Pre Dec clean

  • Final Decoration & 1st Coat FED

  • Final Fix Electrical

  • Final Fix Plumbing

  • Builders clean

  • Test smoke head & Sounders

  • Access control system commissioning

  • Commission heating and cooling system

  • Domestic water (Temps & Flow rates)

  • FCU secondary air balancing

  • Fire Alarm system commissioning

  • Flood test condense from FCU

  • Flush, Clean and dose apartment

  • Heating and cooling controls commissioning

  • HIU Commissioning

  • MVHR vent commissioning

  • TV system commissioning

  • Functionality testing

  • HIU Ceiling grid installation

  • Carpet install

  • Fit wardrobe and HIU front

  • Mastic

  • BCSL snag

  • De snag (All trades)

Pre Fit Out Level 07

  • Screed

  • Sole plates installed

  • Shutter and back fill

  • Flat Duct Install

  • SVP & RWP floor plate confirmation

Apartment Fit Out Level 07

  • Pre Drylining hold point

  • Drylining load out

  • Utility cupboard- Drylining and skim

  • Partition & 1st fix side

  • Noggins

  • Mechanical 1st Fix

  • Lagging

  • Electrical 1st Fix

  • Internal wall fire stop

  • Wall closure

  • 2nd Fix Drylining

  • Apartment letter box fire stopping

  • Fire tape and Fire mastic (Above Ceiling)

  • Ceiling grid install

  • Fit sprinkler head and install

  • NHBC void inspection

  • Board Ceiling

  • Tape and Joint

  • Sanding down

  • Wedi/Duka board floor build up

  • Sealer/Mist coat

  • Bath Support batten

  • Kitchen Pre-Plumb

  • Shower tray/ Bath / WC basin install

  • HIU & Raditor installation

  • Kitchen tiling

  • 2nd Fix plumbing

  • Water on / Flood test / SVP test

  • 2nd Fix Electrical

  • Permanent Power Live Test

  • Pre Dec / Make good drylining

  • Pre Dec hold point

  • Pre Dec clean

  • Final Decoration & 1st Coat FED

  • Final Fix Electrical

  • Final Fix Plumbing

  • Builders clean

  • Test smoke head & Sounders

  • Access control system commissioning

  • Commission heating and cooling system

  • Domestic water (Temps & Flow rates)

  • FCU secondary air balancing

  • Fire Alarm system commissioning

  • Flood test condense from FCU

  • Flush, Clean and dose apartment

  • Heating and cooling controls commissioning

  • HIU Commissioning

  • MVHR vent commissioning

  • TV system commissioning

  • Functionality testing

  • HIU Ceiling grid installation

  • Carpet install

  • Fit wardrobe and HIU front

  • Mastic

  • BCSL snag

  • De snag (All trades)

Pre Fit Out Level 06

  • Screed

  • Sole plates installed

  • Shutter and back fill

  • Flat Duct Install

  • SVP & RWP floor plate confirmation

Apartment Fit Out Level 06

  • Pre Drylining hold point

  • Drylining load out

  • Utility cupboard- Drylining and skim

  • Partition & 1st fix side

  • Noggins

  • Mechanical 1st Fix

  • Lagging

  • Electrical 1st Fix

  • Internal wall fire stop

  • Wall closure

  • 2nd Fix Drylining

  • Apartment letter box fire stopping

  • Fire tape and Fire mastic (Above Ceiling)

  • Ceiling grid install

  • Fit sprinkler head and install

  • NHBC void inspection

  • Board Ceiling

  • Tape and Joint

  • Sanding down

  • Wedi/Duka board floor build up

  • Sealer/Mist coat

  • Bath Support batten

  • Kitchen Pre-Plumb

  • Shower tray/ Bath / WC basin install

  • HIU & Raditor installation

  • Kitchen tiling

  • 2nd Fix plumbing

  • Water on / Flood test / SVP test

  • 2nd Fix Electrical

  • Permanent Power Live Test

  • Pre Dec / Make good drylining

  • Pre Dec hold point

  • Pre Dec clean

  • Final Decoration & 1st Coat FED

  • Final Fix Electrical

  • Final Fix Plumbing

  • Builders clean

  • Test smoke head & Sounders

  • Access control system commissioning

  • Commission heating and cooling system

  • Domestic water (Temps & Flow rates)

  • FCU secondary air balancing

  • Fire Alarm system commissioning

  • Flood test condense from FCU

  • Flush, Clean and dose apartment

  • Heating and cooling controls commissioning

  • HIU Commissioning

  • MVHR vent commissioning

  • TV system commissioning

  • Functionality testing

  • HIU Ceiling grid installation

  • Carpet install

  • Fit wardrobe and HIU front

  • Mastic

  • BCSL snag

  • De snag (All trades)

Pre Fit Out Level 05

  • Screed

  • Sole plates installed

  • Shutter and back fill

  • Flat Duct Install

  • SVP & RWP floor plate confirmation

Apartment Fit Out Level 05

  • Pre Drylining hold point

  • Drylining load out

  • Utility cupboard- Drylining and skim

  • Partition & 1st fix side

  • Noggins

  • Mechanical 1st Fix

  • Lagging

  • Electrical 1st Fix

  • Internal wall fire stop

  • Wall closure

  • 2nd Fix Drylining

  • Apartment letter box fire stopping

  • Fire tape and Fire mastic (Above Ceiling)

  • Ceiling grid install

  • Fit sprinkler head and install

  • NHBC void inspection

  • Board Ceiling

  • Tape and Joint

  • Sanding down

  • Wedi/Duka board floor build up

  • Sealer/Mist coat

  • Bath Support batten

  • Kitchen Pre-Plumb

  • Shower tray/ Bath / WC basin install

  • HIU & Raditor installation

  • Kitchen tiling

  • 2nd Fix plumbing

  • Water on / Flood test / SVP test

  • 2nd Fix Electrical

  • Permanent Power Live Test

  • Pre Dec / Make good drylining

  • Pre Dec hold point

  • Pre Dec clean

  • Final Decoration & 1st Coat FED

  • Final Fix Electrical

  • Final Fix Plumbing

  • Builders clean

  • Test smoke head & Sounders

  • Access control system commissioning

  • Commission heating and cooling system

  • Domestic water (Temps & Flow rates)

  • FCU secondary air balancing

  • Fire Alarm system commissioning

  • Flood test condense from FCU

  • Flush, Clean and dose apartment

  • Heating and cooling controls commissioning

  • HIU Commissioning

  • MVHR vent commissioning

  • TV system commissioning

  • Functionality testing

  • HIU Ceiling grid installation

  • Carpet install

  • Fit wardrobe and HIU front

  • Mastic

  • BCSL snag

  • De snag (All trades)

Pre Fit Out Level 04

  • Screed

  • Sole plates installed

  • Shutter and back fill

  • Flat Duct Install

  • SVP & RWP floor plate confirmation

Apartment Fit Out Level 04

  • Pre Drylining hold point

  • Drylining load out

  • Utility cupboard- Drylining and skim

  • Partition & 1st fix side

  • Noggins

  • Mechanical 1st Fix

  • Lagging

  • Electrical 1st Fix

  • Internal wall fire stop

  • Wall closure

  • 2nd Fix Drylining

  • Apartment letter box fire stopping

  • Fire tape and Fire mastic (Above Ceiling)

  • Ceiling grid install

  • Fit sprinkler head and install

  • NHBC void inspection

  • Board Ceiling

  • Tape and Joint

  • Sanding down

  • Wedi/Duka board floor build up

  • Sealer/Mist coat

  • Bath Support batten

  • Kitchen Pre-Plumb

  • Shower tray/ Bath / WC basin install

  • HIU & Raditor installation

  • Kitchen tiling

  • 2nd Fix plumbing

  • Water on / Flood test / SVP test

  • 2nd Fix Electrical

  • Permanent Power Live Test

  • Pre Dec / Make good drylining

  • Pre Dec hold point

  • Pre Dec clean

  • Final Decoration & 1st Coat FED

  • Final Fix Electrical

  • Final Fix Plumbing

  • Builders clean

  • Test smoke head & Sounders

  • Access control system commissioning

  • Commission heating and cooling system

  • Domestic water (Temps & Flow rates)

  • FCU secondary air balancing

  • Fire Alarm system commissioning

  • Flood test condense from FCU

  • Flush, Clean and dose apartment

  • Heating and cooling controls commissioning

  • HIU Commissioning

  • MVHR vent commissioning

  • TV system commissioning

  • Functionality testing

  • HIU Ceiling grid installation

  • Carpet install

  • Fit wardrobe and HIU front

  • Mastic

  • BCSL snag

  • De snag (All trades)

Pre Fit Out Level 03

  • Screed

  • Sole plates installed

  • Shutter and back fill

  • Flat Duct Install

  • SVP & RWP floor plate confirmation

Apartment Fit Out Level 03

  • Pre Drylining hold point

  • Drylining load out

  • Utility cupboard- Drylining and skim

  • Partition & 1st fix side

  • Noggins

  • Mechanical 1st Fix

  • Lagging

  • Electrical 1st Fix

  • Internal wall fire stop

  • Wall closure

  • 2nd Fix Drylining

  • Apartment letter box fire stopping

  • Fire tape and Fire mastic (Above Ceiling)

  • Ceiling grid install

  • Fit sprinkler head and install

  • NHBC void inspection

  • Board Ceiling

  • Tape and Joint

  • Sanding down

  • Wedi/Duka board floor build up

  • Sealer/Mist coat

  • Bath Support batten

  • Kitchen Pre-Plumb

  • Shower tray/ Bath / WC basin install

  • HIU & Raditor installation

  • Kitchen tiling

  • 2nd Fix plumbing

  • Water on / Flood test / SVP test

  • 2nd Fix Electrical

  • Permanent Power Live Test

  • Pre Dec / Make good drylining

  • Pre Dec hold point

  • Pre Dec clean

  • Final Decoration & 1st Coat FED

  • Final Fix Electrical

  • Final Fix Plumbing

  • Builders clean

  • Test smoke head & Sounders

  • Access control system commissioning

  • Commission heating and cooling system

  • Domestic water (Temps & Flow rates)

  • FCU secondary air balancing

  • Fire Alarm system commissioning

  • Flood test condense from FCU

  • Flush, Clean and dose apartment

  • Heating and cooling controls commissioning

  • HIU Commissioning

  • MVHR vent commissioning

  • TV system commissioning

  • Functionality testing

  • HIU Ceiling grid installation

  • Carpet install

  • Fit wardrobe and HIU front

  • Mastic

  • BCSL snag

  • De snag (All trades)

Pre Fit Out Level 02

  • Screed

  • Sole plates installed

  • Shutter and back fill

  • Flat Duct Install

  • SVP & RWP floor plate confirmation

Apartment Fit Out Level 02

  • Pre Drylining hold point

  • Drylining load out

  • Utility cupboard- Drylining and skim

  • Partition & 1st fix side

  • Noggins

  • Mechanical 1st Fix

  • Lagging

  • Electrical 1st Fix

  • Internal wall fire stop

  • Wall closure

  • 2nd Fix Drylining

  • Apartment letter box fire stopping

  • Fire tape and Fire mastic (Above Ceiling)

  • Ceiling grid install

  • Fit sprinkler head and install

  • NHBC void inspection

  • Board Ceiling

  • Tape and Joint

  • Sanding down

  • Wedi/Duka board floor build up

  • Sealer/Mist coat

  • Bath Support batten

  • Kitchen Pre-Plumb

  • Shower tray/ Bath / WC basin install

  • HIU & Raditor installation

  • Kitchen tiling

  • 2nd Fix plumbing

  • Water on / Flood test / SVP test

  • 2nd Fix Electrical

  • Permanent Power Live Test

  • Pre Dec / Make good drylining

  • Pre Dec hold point

  • Pre Dec clean

  • Final Decoration & 1st Coat FED

  • Final Fix Electrical

  • Final Fix Plumbing

  • Builders clean

  • Test smoke head & Sounders

  • Access control system commissioning

  • Commission heating and cooling system

  • Domestic water (Temps & Flow rates)

  • FCU secondary air balancing

  • Fire Alarm system commissioning

  • Flood test condense from FCU

  • Flush, Clean and dose apartment

  • Heating and cooling controls commissioning

  • HIU Commissioning

  • MVHR vent commissioning

  • TV system commissioning

  • Functionality testing

  • HIU Ceiling grid installation

  • Carpet install

  • Fit wardrobe and HIU front

  • Mastic

  • BCSL snag

  • De snag (All trades)

Pre Fit Out Level 01

  • Screed

  • Sole plates installed

  • Shutter and back fill

  • Flat Duct Install

  • SVP & RWP floor plate confirmation

Apartment Fit Out Level 01

  • Pre Drylining hold point

  • Drylining load out

  • Utility cupboard- Drylining and skim

  • Partition & 1st fix side

  • Noggins

  • Mechanical 1st Fix

  • Lagging

  • Electrical 1st Fix

  • Internal wall fire stop

  • Wall closure

  • 2nd Fix Drylining

  • Apartment letter box fire stopping

  • Fire tape and Fire mastic (Above Ceiling)

  • Ceiling grid install

  • Fit sprinkler head and install

  • NHBC void inspection

  • Board Ceiling

  • Tape and Joint

  • Sanding down

  • Wedi/Duka board floor build up

  • Sealer/Mist coat

  • Bath Support batten

  • Kitchen Pre-Plumb

  • Shower tray/ Bath / WC basin install

  • HIU & Raditor installation

  • Kitchen tiling

  • 2nd Fix plumbing

  • Water on / Flood test / SVP test

  • 2nd Fix Electrical

  • Permanent Power Live Test

  • Pre Dec / Make good drylining

  • Pre Dec hold point

  • Pre Dec clean

  • Final Decoration & 1st Coat FED

  • Final Fix Electrical

  • Final Fix Plumbing

  • Builders clean

  • Test smoke head & Sounders

  • Access control system commissioning

  • Commission heating and cooling system

  • Domestic water (Temps & Flow rates)

  • FCU secondary air balancing

  • Fire Alarm system commissioning

  • Flood test condense from FCU

  • Flush, Clean and dose apartment

  • Heating and cooling controls commissioning

  • HIU Commissioning

  • MVHR vent commissioning

  • TV system commissioning

  • Functionality testing

  • HIU Ceiling grid installation

  • Carpet install

  • Fit wardrobe and HIU front

  • Mastic

  • BCSL snag

  • De snag (All trades)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.