Information

  • PLOT NO

  • Conducted on

  • Manager Name

Progress Report

GROUND FLOOR PROGRESS

  • FLAT DUCT BEEN INSTALLED

  • SVP PIPE WORK BEEN INSTALLED

  • HAS SVP PIPE WORK BEEN BACK FILLED

  • WINDOW FRAMES BEEN INSTALLED

  • HAS GLASS BEEN INSTALLED

  • SOLE PLATES BEEN INSTALLED

  • HAS SCREED BEEN COMPLETED

  • HAS S&R LOADED OUT MATERIALS TO START

  • 1ST FIX DRYLINING STARTED

  • 1ST FIX DRYLINING (PARTYWALLS) STARTED

  • 1ST FIX ELECTRICAL

  • 1ST FIX MECHANICAL

  • LEVEL 1 PROGRESS
  • FLAT DUCT BEEN INSTALLED

  • SVP PIPE WORK BEEN INSTALLED

  • HAS SVP PIPE WORK BEEN BACK FILLED

  • WINDOW FRAMES BEEN INSTALLED

  • HAS GLASS BEEN INSTALLED

  • SOLE PLATES BEEN INSTALLED

  • HAS SCREED BEEN COMPLETED

  • HAS S&R LOADED OUT MATERIALS TO START

  • 1ST FIX DRYLINING STARTED

  • 1ST FIX DRYLINING (PARTYWALLS) STARTED

  • 1ST FIX ELECTRICAL

  • 1ST FIX MECHANICAL

LEVEL 2 PROGRESS

  • FLAT DUCT BEEN INSTALLED

  • Svp pipe work been installed

  • Has svp pipe work been back filled

  • Window frames been installed

  • Sole plates been installed

  • Has screed been completed

  • Has S&R Loaded out materials to start

  • 1st fix Drylining started

  • 1st fix Drylining (Partywalls started)

  • 1st fix Electrical started

  • 1st fix Mechanical started

Level 3 PROGRESS

  • Flat duct been installed

  • Svp pipe work been installed

  • Has svp pipe work been back filled

  • Window frames been installed

  • Has Glass been installed

  • Has sole plates been installed

  • Has screed been poured

  • Has S&R loaded out materials for next stage

  • 1st fix Drylining started

  • 1st fix electrical started

  • 1st fix Mechanical started

Level 4 PROGRESS

  • Flat duct been installed

  • Svp pipe work been installed

  • Has svp pipe work been back filled

  • Window frames been installed

  • Has Glass been installed

  • Has sole plates been installed

  • Has screed been poured

  • Has S&R loaded out materials for next stage

  • 1st fix Drylining started

  • 1st fix electrical started

  • 1st fix Mechanical started

Level 5 PROGRESS

  • Flat duct been installed

  • Svp pipe work been installed

  • Has svp pipe work been back filled

  • Window frames been installed

  • Has Glass been installed

  • Has sole plates been installed

  • Has screed been poured

  • Has S&R loaded out materials for next stage

  • 1st fix Drylining started

  • 1st fix electrical started

  • 1st fix Mechanical started

Level 6 PROGRESS

  • Flat duct been installed

  • Svp pipe work been installed

  • Has svp pipe work been back filled

  • Window frames been installed

  • Has Glass been installed

  • Has sole plates been installed

  • Has screed been poured

  • Has S&R loaded out materials for next stage

  • 1st fix Drylining started

  • 1st fix electrical started

  • 1st fix Mechanical started

Level 7 PROGRESS

  • Flat duct been installed

  • Svp pipe work been installed

  • Has svp pipe work been back filled

  • Window frames been installed

  • Has Glass been installed

  • Has sole plates been installed

  • Has screed been poured

  • Has S&R loaded out materials for next stage

  • 1st fix Drylining started

  • 1st fix electrical started

  • 1st fix Mechanical started

Level 8 PROGRESS

  • Flat duct been installed

  • Svp pipe work been installed

  • Has svp pipe work been back filled

  • Window frames been installed

  • Has Glass been installed

  • Has sole plates been installed

  • Has screed been poured

  • Has S&R loaded out materials for next stage

  • 1st fix Drylining started

  • 1st fix electrical started

  • 1st fix Mechanical started

Level 9 PROGRESS

  • Flat duct been installed

  • Svp pipe work been installed

  • Has svp pipe work been back filled

  • Window frames been installed

  • Has Glass been installed

  • Has sole plates been installed

  • Has screed been poured

  • Has S&R loaded out materials for next stage

  • 1st fix Drylining started

  • 1st fix electrical started

  • 1st fix Mechanical started

Level 10 PROGRESS

  • Flat duct been installed

  • Svp pipe work been installed

  • Has svp pipe work been back filled

  • Window frames been installed

  • Has Glass been installed

  • Has sole plates been installed

  • Has screed been poured

  • Has S&R loaded out materials for next stage

  • 1st fix Drylining started

  • 1st fix electrical started

  • 1st fix Mechanical started

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.