Title Page

  • Project

  • Principal Contractor

  • Who is the Principal Contractor on site?

  • Contractor

  • Who is the primary Sub-Contractor on site?

  • Conducted on

  • Person Reporting

  • Location

Executive Summary

  • Provide a concise overview of key findings, including areas of compliance, significant health and safety risks identified, corrective actions required, and overall site safety performance.

Site Documentation and Office Review

  • Is the H&S Information on site and up to date? Construction Site Safety Pack, RAMs, F10, Insurances, H&S Notices and Signs.

  • Are the Fire and Emergency plans displayed and current?

  • Signing in & out procedure? (followed correctly, numbers on site, visitors)

  • Records of Site Inductions, Competency, & Training

  • Arrangements and Records for Passing of Information? (TBT, Daily Site Briefings, Pre & Post Site Inspections)

  • Have there been any Accidents, Incidents or Near Misses reported or recorded?

Site Setup

  • Are Welfare Provisons adequate, in place, and of an acceptable standard?

  • Is there First Aid Equipment, First Aiders and Mental Health First Aider on site?

  • Details of First Aiders

  • Is the Site Compound and Works Area tidy and safe?

  • Is the Site Secured with the correct hoarding?

  • Site office suitable and sufficient?

  • Is there Fire detection within the site accommodation?

H&S Management

  • Management of Plant Equipment that it is a in good condition and inspected correctly?

  • Management of PPE, ensuring it is correctly worn by operatives?

  • Management of Permits in use on site?

  • What permits are in use and for what period?

  • Management of Excavations & Earthworks

  • Management of Edge Protection

  • Management of Noise, Dust, & Vibration

  • Management of Hazardous Substances COSHH on site? (Use, Storage, Disposal, & Control)

  • Management and Arrangements for Material Storage

  • Management of Waste Segregation

Traffic and Pedestrian Management

  • Traffic & pedestrian management set up as per the plan?

  • Any traffic or pedestrian issues require resolution?

  • Notable upcoming changes? (e.g. closures, signal modifications, design change)

Works Progress Report

Programme

  • Are works progressing as per programme?

  • Potential delays impacting the programme?

  • Any opportunities to accelerate progress in the programme?

Quality

  • Works completed the past week?

  • Have works been completed to an acceptable standard?

  • Are there any defects requiring remediation?

Issues and Instructions

  • Has there been any issues in which require escalation?

  • Has there been any change or site instructions?

Highway Maintenance Hand Over

  • Has a maintenance inspection taken place this week by or with the contractor?

  • When did this take place?

  • Were any defects noted?

  • Is the defect or defects a result of the works or within the works extents?

  • Has the Contractor been notified and instructed to remediate?

  • Has the Highway Inspector been notified?

Completion

  • Site supervisor/manager agrees to content of this report at the time of completion.

  • Inspector Highways Lead

  • Date and time of completion

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.