Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Element, checks and records
-
-
Site set up, signage, cleanliness, staff dress, attitude, SHE awards, polices EL insurance, first adders, etc
-
Copy of risk assessments on site ( specific to activity and authorised )
-
Control measures identified and in place and comply with the risk assessment
-
Risk assessment has been signed by all operatives
-
Copy of the Method statements available on site ( specific to activity and authorised )
-
Control measures identified and in place and comply with the risk assessment
-
Method statements have been signed by all operatives
-
Working at height prevention of falls from height of falling materials and are they adequate ( eg work platforms with suitable edge protection or safety harnesses )?
-
If lifting operations are in progress, asset tags are legible and intact checked and valid for cranes
-
If noisy operations are in progress is hearing protection being worn and has an assessment been made ?. Are measures in place to prevent activities creating a statutory nuisance in terms of noise
-
Manual handling, If operatives are lifting heavy items is a manual handling assessment in place -part of the activity risk assessment ?
-
Permit system. Hot works, confined space, working at height
Waste and environment
-
Check waste transfer notes are in place
Workplace
-
Access and egress
-
Site security
-
Housekeeping ( site tidy and acceptable standard -slips, trips and falls