Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Housekeeping
-
Project work area are clean and free of excess trash and debris
-
Walkways and passageways clear
-
Materials and equipment properly stored
-
Electrical cords, hoses, welding leads, etc. elevated to prevent trip hazards
-
Scrap metal free of protruding nails or other puncture hazards
-
Trash receptacles are provided for work areas and water kegs
-
Sufficient sanitary facilities located near all work areas
-
Barricades installed, tagged, and maintained
-
Other:
-
Deduct point?
Personal Protective Equipment
-
Clothing in good condition and suitable for task being performed
-
Hard hats worn and maintained as required
-
Hearing protection worn as required
-
Eye protection worn as required, in proper manner
-
Proper foot protection worn for job performed
-
Work gloves worn as required
-
Face shield and googles worn as required
-
Fire retardant clothing, if required, in good condition
-
6' height exposure rule being observed
-
Respirators, gloves, chemical, resistant garments
-
Other
-
Deduct point?
Fall Protection
-
Perimeter guarding installed properly and identified
-
Fall protection properly maintained
-
Full body harness worn in a proper manner
-
Lanyards are adequately secured
-
Tie off points are capable of supporting 5,400 lbs
-
Fall protection equipment is used only for fall protection
-
Horizontal / Static / Rat lines installed and capable of supporting 5,400 lbs
-
Proper use of self-retracting lifelines (yo-yo)?
-
Other
-
Deduct point?
Scaffolds and Ladders
-
Scaffolds: Built per specification
-
Scaffolds: Rigid, plumb, and square
-
Scaffolds: Proper access and egress provided
-
Scaffolds: Tagged correctly (Red, Yellow, Green)
-
Scaffolds: Good housekeeping practices
-
Ladders: Proper ladder for the job performed
-
Ladders: Proper angle and secured to prevent slipping
-
Ladders: Proper fall protection where required
-
Ladders: In good mechanical condition, free from mud, grease, etc
-
Other
-
Deduct point?
Hoisting and Lifting Equipment
-
Chain falls, come-a-longs, and chokers in good physical condition
-
All equipment in apparent good mechanical condition
-
Softeners used as required
-
Proper rigging techniques used
-
Rigging is protected from cutting, burning, and welding operations
-
Rigging is protected from chemical exposure
-
Other
-
Deduct point?
Vehicles and Mobile Equipment
-
Daily document equipment inspections have been performed
-
Lights, brakes, horns, and alarms working properly
-
Seat belts provided and used
-
Properly maintained; no leaks, drips, or smoke
-
Proper equipment for the job being performed
-
Operators license or certifications as required
-
Fire extinguishers on forklifts
-
Other
-
Deduct point?
Tools and Equipment
-
Electrical cords and plugs in good condition
-
Tools are maintained In a safe condition
-
Tools have guards as supplied by the manufacturer
-
Tools are properly carried and stored
-
Pneumatic / hydraulic hose connections properly stored
-
Proper tools used for the job performed
-
Bench grinder: work rest properly adjusted and wheels dressed
-
Broken / defective tools are secured to prevent use
-
Other
-
Deduct point?
Fire Protection
-
Flammables stored properly
-
Oxygen and combustibles separated
-
Containers labeled
-
Fire extinguisher properly located and inspected
-
Flash arresters installed
-
Compressed gas cylinders properly stored and maintained
-
Containment of hot work and welding screens as required
-
Regulator gauges properly attached and maintained
-
Other
-
Deduct point?
Project - Facility / Safety & Legal Documentation
-
Materials safety data sheet (MSDS) Book available and current
-
Project safety policy manual available and current
-
Federal posters are in an accessible area and current
-
State posters are in a accessible area and current
-
"Posted Panel of Physician" or other WC poster is accessible and current
-
Other
-
Deduct point?
Job & Safety Task Permits
-
Applicable permits posted
-
JSA completed and correct
-
JSA and Permit procedures being followed
-
Crew members are knowledgeable about permits and JSAs
-
Other
-
Deduct point?
IDLH ( Imminently Dangerous to Life or Health )
-
IDLH violations?
-
Deduct point?
Work progress report
-
Floor number
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
-
Current work being performed / floor number
-
Floor number
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
-
Current work being performed / floor number
-
Floor number
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
-
Current work being performed / floor number
-
Floor number
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
-
Current work being performed / floor number
-
Floor number
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
-
Current work being performed / floor number
-
Floor number
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
-
Current work being performed / floor number
-
Floor number
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
-
Current work being performed / floor number
-
Floor number
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
-
Current work being performed / floor number
-
Floor number
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
-
Current work being performed / floor number
-
Floor number
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
-
Current work being performed / floor number