Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Amenities
-
Alarm System
-
Adequate Lighting
-
Cranes
-
Common Plant
-
Electrical - lead stands, tools tagged, distribution boards
-
Emergency Equipment- fire extinguishers, stretchers, etc
-
Entry, exit, exit routes and paths
-
EWP's
-
Excavations
-
Scaffolding
-
Falling object protection
-
First Aid equipment
-
Formwork
-
General housekeeping
-
Handrails
-
Hazardous Substances
-
Hoarding/fencing
-
Hoists
-
PPE checked
-
Hot Works
-
Ladders
-
Lasers
-
Manual Handling
-
Materials Handling
-
Mobile Plant
-
Plant Operators Licenses
-
Nurse Call Systems
-
Oxy Gear checked
-
Penetrations covered
-
Signage
-
Site Security
-
Suspended Decks/slabs
-
Tilt Up/Precast panels
-
Traffic control
-
Traffic Management
-
Trenches shored/battered
-
Working at heights
-
Working behind retaining walls
-
Boundary Noise
-
Smoke Emissions
-
Dust Suppression
-
Soil & Erosion control
-
Odours
-
Spills, oil drips, etc
-
Waste Management
-
Stockpiles
Scaffold Checklist
-
Is the scaffold maintained and in good condition?
-
Is scaffold straight, level & clean (visual check)?
-
Is ground level stable (without excavations and mud) and Scaffold Standards supported on a firm base (soleboards & baseplates)?
-
Is scaffold secured to structure (compliant to AS 1576 - tied, every 3 bays, 2 lifts)?
-
Is scaffold situated with 6m of electrical lines/conductors, it should be insulated or the power disconnected (compliant to AS 1576)?
-
Has the scaffold been signed off/certified by a competent person?
-
Is a 'scafftag' attached to the scaffold?
Working Platforms
-
Are planks uniform and in good condition (compliant to AS 1576 - no splits, cracks, knots, bends, etc)?
-
Any platform missing planks should be barricaded and rectified so that there are no gaps in the working platform.
-
Edge protection is required on open working sides and ends of platforms over 2m (compliant AS 1576). Are kickboards and toeboards fitted to all decks?
-
Edge protection is required on open working sides and ends of platforms over 2m (compliant AS 1576). Are kickboards and toeboards fitted to all Access/Egress decks?
-
Stage brackets must be located only on the scaffold face near the face of the building. Are stage/ hop up brackets used where required?
Signs and Barricades
-
All access to and from the scaffold should be sign posted. Are adequate signs provide (i.e. No entry Saffold Incomplete, Men working overhead) during erection, dismantling and alteration.
-
Are the signs placed top and bottom of scaffold during the alteration and dismantling (usually placed at access and egress point)?
-
Are signs for duties placed on platforms (Heavy Duty 675kg per bay allowing crane crew etc., to instantly recognise how much weight can be placed on the scaffold)?
-
Are adequate barricades supplied during erection, alteration or dismantling of scaffold (barricades should encompass entire work are)?
Tickets
-
Has training been provided for workers erecting scaffolds under 4m?<br>Note: that trainees must hold a training permit (there must be a ratio of 2 scaffolders to every 1 trainee
-
Is all work over 4m being completed by a ticketed scaffolder?
Bracing
-
Has bracing been supplied on traverse ends (dogleg end brace) compliant AS 1576?
-
Is face bracing fitted on both ends as well as every third bay along the face of the scaffold?
-
Does bracing extend to full height of the scaffold?
Access and Egress
-
Is access and egress supplied to all working platforms (all independent scaffolds must have access as well as egress from all working platforms to the ground)?
-
Are all ladder and stair access internal (fitted within a ladder/stair access tower - AS 1576)?
-
Is there access to scaffold from the structure (confirming to AS 1576.1)?
Mobile Scaffolds
-
Was mobile supplied complete with erection?
-
All scaffolds should have hand/mid rails regardless of height. Is mobile fitted with handrails and mid rails?
-
Wheels must be locked when in use. Are wheels locked when in use?
-
Is scaffold situated on firm surface (concrete, wood, etc.)
-
Is working deck complete (split decks are illegal) AS 1576
-
Is ladder supplied and fitted internally (all mobile over 2m must have a ladder fitted and compliant to AS 1576)?
Inspection Findings
Positive Findings
-
What are the positive findings on site?
Negative Findings
-
What are the negative findings on site?
Action Items
-
Add media
-
Add signature