WEEKLY SITE WALKS & SENSIBLE MONITORING

  • Prepared by

SITE DETAILS

  • Name of site

  • Type of site

  • Area visited
  • Conducted on

Use Checklist

WELFARE AREAS

  • Monitored this Week?

  • Is the Emergency Plan and fire risk assessment available within the site welfare?

  • Are toilets and washing facilities suitable and sufficient, clean and Tidy?

  • Welfare areas clean and tidy, free from tools and materials.

  • Are storage areas, lay downs and the stores segregated and tidy?

  • Are drying room and changing facilities available?

  • Is Drinking Water available?

  • Are materials and wastes properly stored and segregated?

  • Are the welfare areas / Messing facilities Suitable for current size of workforce?

  • Are the welfare areas / Messing facilities Suitable for current size of workforce?

  • Are First Aid facilities safely accessible and clearly identified?

  • Does all welfare and office accommodation have valid and current certificates for fixed wiring electrical systems?

  • Has PAT testing been completed for all portable and office equipment.

  • Are facilities regularly cleaned?

  • Is relevant EHS and company information properly posted and in date? F10, HASWA poster, Liability Insurances, H&S and Environmental Policies

  • Is suitable segregation between Pedestrians and Vehicles around the Welfare facilities?

  • Is COSHH storage appropriate for the substances available?

  • Comments

GENERAL HOUSEKEEPING / WORK AREAS

  • Monitored this Week?

  • Is safe access and Egress established to and from the work areas?

  • Is the site tidy and free from obvious Slip/Trip hazards?

  • Is housekeeping being monitored throughout the works during the day and not left until the end of shift?

  • Are materials and wastes properly stored and segregated?

  • Is site safety board available, accessible and displaying current and relevant information?

  • Is work area boundary / Fencing as per the current CDM plan?

  • Is site signage clearly displayed, in good condition and relevant to current activities?

  • Comments

FIRST AID

  • Monitored this week?

  • Are first aiders easily identified ?

  • Are the workforce aware of whom the first aiders are and where and how to obtain first aid?

  • Is the amount of First Aid equipment available appropriate, correctly located and identifiable?

  • Is First Aid equipment checked and refilled as regularly?

  • Are all personnel aware of the procedures to follow should an incident involving First Aid occur?

  • Are First Aid Training Records available for nominated personnel?

  • Comments

EMERGENCY PLANS

  • Monitored this week?

  • Is the Emergency Plan fully implemented and regularly inspected for suitability?

  • Is evacuation plan & muster point communicated and clearly displayed ?

  • Have fire risk assessments been carried out for the project and are they available?

  • Are fire/smoke detectors installed where required?

  • Is there a suitable means of raising alarms and are all personnel aware of the procedure?

  • Are emergency evacuation exercises undertaken and recorded?

  • Have emergency services been informed of the construction activities taking place on the site?

  • Is the contact details and map of local hospital and A&E posted up?

PERSONAL PROTECTIVE EQUIPMENT

  • Monitored this Week?

  • Is worn in accordance with site specific rules?

  • Is available and appropriate for the task at hand?

  • Is in good condition?

  • Are signs appropriate in areas where there may be additional PPE requirements? i.e Hearing protection zones.

  • Are different types of gloves considered and are they appropriate for the tasks at hand?

  • Are hooded tops being worn onsite? These are banned items on some clients Sites.

  • Comments

TEMPORARY WORKS

  • Monitored this Week?

  • Temporary Works co-ordinator formally appointed in writing?

  • Confirm Temporary Works procedure in place and being worked to?

  • Temporary Works schedule in place?

  • Temporary Works Register up to date?

  • Are all Temporary Works related installations / Activities identified, checked and approved?

  • Where applicable do RAMS refer to Temporary Works design documentation and information?

  • Are permits to load being issued?

  • Comments

Excavations

  • Monitored this Week?

GENERAL EXCAVATIONS, PERMIT TO DIG AND UNDERGROUND SERVICES

  • Applicable?

  • Have GPR surveys and Service location Trial Pits been undertaken?

  • Is an Underground Hazard Plan available?

  • Are Site specific RAMS and a Permit to Dig available at the point of work?

  • Are all Members of the working party briefed and signed onto the relevant documentation?

  • Are appropriate members of the Working Party HSG47 trained?

  • Are company safe digging practices being adhered to during excavation works?

  • Is the underground services detection equipment calibration in date and has a test been completed against a known service to ensure correct operation?

  • Has excavation been properly planned? Access considerations for plant and personnel, temporary storage of materials etc.

  • Are all exposed services adequately supported and protected?

  • Are all excavations inspected daily and after breaks / changes in weather?

  • Excavation adequately barrierd off? Appropriate level of signage?

  • Plant and equipment stored suitable distance from edge of excavation?

EXCAVATION (BATTERS, SUPPORT)

  • Monitored this Week?

  • Are excavations in accordance with Temporary Works design?

  • Are excavations/Cofferdams/Caissons checked and recorded as required?

  • Does the method of work take into account personnel not working in an unsupported excavation?

  • Is there a safe means of escape and a rescue plan/procedure in place?

  • Is there a safe means of Access and Egress?

  • Is there Gas monitoring in place?

EXCAVATION PROTECTION

  • Monitored this Week?

  • Is Heavy equipment away from excavation edges?

  • Surcharged loads more that 0.6m from excavation edge?

  • Is excavation correctly protected?

WORKING AT HEIGHT

  • Monitored this Week?

General Work At Height Monitoring

  • Confirm that WAH has been properly planned, cannot be avoided or completed any other way that is reasonably practicable?

  • Confirm the most suitable work equipment is being used and covered by a Risk Assessment?

  • Confirm appropriate steps have been taken to mitigate the effects of any fall?

  • Employees are competent and properly supervised?

  • Is there a safe means of escape and a rescue plan/procedure in place?

  • Are additional Hazards considered? e.g. Impressed Voltage, Near by services,

  • Danger area in force around the WAH area? Clear Signage??

SCAFFOLDS, PLATFORMS, MOBILE TOWERS and MEWP's

  • SCAFFOLDS & PLATFORMS IN USE?

  • Completed scaffolds inspected and tagged?

  • Temporary floor/roof openings protected?

  • Ladders attached, correct length and secured?

  • Main guard-rails must be installed min 950mm above working platform?

  • Mid guard-rail to Toe-board or Mid Guard Rail to Main rail no more than 470mm?

  • Toe-boards suitable to prevent falls of persons or materials. (Typically Scaff board on edge)

  • SCAFFOLD TOWERS / MOBILE TUBE & FITTING IN USE?

  • Completed scaffolds inspected and tagged?

  • Temporary floor/roof openings protected?

  • Ladders attached, correct length and secured?

  • Main guard-rails must be installed min 950mm above working platform?

  • Mid guard-rail to Toe-board or Mid Guard Rail to Main rail no more than 470mm?

  • Toe-boards suitable to prevent falls of persons or materials. (Typically Scaff board on edge)

  • MOBILE ALUMINUM TOWERS IN USE

  • Are competency & training checked of individuals erecting?

  • Operating Instructions available at Point of Work?

  • Is the Mobile platform suitable? Correct Working Height?

  • Brakes used? Platform to remain stationary at all times when occupied.

  • Inspected as per manufacturers specification and Tagged as requried?

  • MEWP's IN USE?

  • Are competency & training checked?

  • Equipment inspected and suitable?

  • Guard-rails and toe-boards fitted to MEWP basket?

  • Operating instructions available/visible?

  • If applicable stability devices/outriggers in use?

  • Familiarization period taken place away from any hazards?

  • Full body harness & chinstrap worn?

  • MEWP fitted with Alarmed pressure sensors and Earth Points?

  • Wind Speeds observed monitored as per manufacturers guidelines?

  • Danger area in force around the WAH area? Clear Signage??

VEHICLE / PLANT MOVEMENTS

  • Monitored this Week?

  • Is traffic management plan available?

  • Parking Area & rules established?

  • Are competency and training checked ?

  • Is a safe and suitable distance respected between pedestrians and vehicles?

LIFTING OPERATIONS

  • Monitored this Week?

  • Lifting plan available?

  • Are competency and training checked ?

  • Are lifting equipment inspection regimes in place and is equipment in date?

  • Safety zone established under the lifting area?

LIFTING EQUIPMENT

  • Monitored this Week?

  • Are lifting equipment inspection regimes in place and is equipment in date?

  • Suitable for task being undertaken ?

  • Procedure in place for quarantined lifting equipment and accessories?

  • Lifting equipment stored appropriately?

GENERAL PLANT

  • Monitored this Week?

  • Is plant on equipment register?

  • Plant and equipment weekly safety checks carried out?

  • Pre-use checks being completed?

  • Thorough examination certificate available for items as required?

  • Stored safely and securely to prevent unauthorised use?

CONFINED SPACES

  • Monitored this Week?

  • Has CS Induction Module been completed for CS personnel?

  • Are the RAMS and Confined Space permits available and specific for the task?

  • Emergency Arrangements in place and working party aware of procedure ?

  • Has a Confined Space assessment been completed for the task?

  • Are competency & training checked and found to be adequate for the confined space working?

  • Is the correct PPE for the task being worn as identified in the RAMS and Permti?

  • Is safe access and egress available for all members of the working party?

  • Are there any additional PPE/RPE requirements and is it all in date?

  • Is atmospheric testing carried out and continually monitored during the works.

  • Comments

HOT WORK PERMITS

  • Monitored this Week?

  • Are RAMS and the Permit available at the point of work and relevant to activity being undertaken?

  • Have the RAMS and Permit for Hot Works been briefed to all members of the working party?

  • Are all Emergency procedures in place and adequate for activity being undertaken?

  • Are adequate facilities available to provide First Aid in the even of an emergency? I.E Eye Wash stations close to the point of work.

  • If required is additional PPE being worn and used correctly?

  • Permit stipulates and adequate amount of time for a Fire Watch?

  • Is safe access and egress maintained?

  • All members of the working party trained and competent to carry out the task?

  • Are abrasive wheels changed by trained and competent persons? And are issue of blades controlled?

  • Is all equipment used for Hot Works regularly inspected and fit for purpose?

  • Are appropriate check sheets being completed for relevant equipment?

  • Are Fire extinguishers available and correct for the activity?

  • Are near by services and combustible materials removed or protected?

  • Completed Permits signed off as complete at the end of each day?

  • Completed Permits cancelled by Permit Controller?

  • Has atmospheric testing been carried out or considered if carrying out burning in confined/restricted spaces?

  • Comments

LOW VOLTAGE PERMITS

  • Monitored this Week?

  • Permit Acceptor assessed and formally authorised.

  • LVSSOW fully implemented and followed in line with current procedure?

  • Site Permit information board updated with Permit Details ?

PERMIT TO PUMP

  • Monitored this Week?

  • Was SEESA environmental team contacted in event that Oil visible on surface, Cement based material in water or PH reading Less than 6 but greater than 9?

  • Location to discharge water agreed with environmental team?

  • Appropriate filter medium used prior to discharge?

  • Team carrying out pumping activity briefed on controls ?

  • Completed permits signed off and return to site office?

FIRE PRECAUTIONS

  • Monitored this Week?

  • Is work area clear of obvious fire sources ? E.g. Discarded Cigarettes, Faulty Electrical equipment, Temporary lighting, poor storage of materials.

  • Adequate and separate smoking areas established?

  • Power Tools regularly inspected and PAT tested?

  • Gas Bottles stored appropriately ?

  • Suitable fire watch established on completion of Hot Works?

  • Is Smoking bin is clear of any general waste?

  • Emergency routes and safety boards clear of obstructions?

  • Fire Extinguishers in date and regularly checked?

  • Air Horns in good condition and checked regularly?

RAM's REVIEW

  • Monitored this Week?

  • Are RAMS appropriate for the activities taking place?

  • Are all members of the working party aware of RAMS content and signed on?

  • Are RAMS highlighted on the Site Activity Schedule found within the Weekly Co-Ordination minutes?

  • Have RAMS undergone suitable review process with approval signatures from relevant personal?

  • Are site copies of the completed RAMS returned to the office to be archived?

COSHH & Fuel Storage

  • Monitored this Week?

  • Are COSHH Assessments and associated MSDS's available for identified COSHH Materials?

  • Are operatives using hazardous substances wearing the correct PPE as identified by the assessment ?

  • Are COSHH materials stored and segregated appropriately?

  • Are gas bottles appropriately secured and segregated?

  • Are subcontractor COSHH materials monitored and controlled?

  • Does any equipment to be worked on contain SF6?

  • Do precautions need to be taken for particulate contamination e.g. arc products in SF6 circuit breakers

  • Is there a requirement for asbestos removal on site?

  • Are procedures in place to prevent contact between Skin and Wet cement based products such as concrete?

HAVS

  • Monitored this Week?

  • Is PREP being completed at the point of work?

  • Have the vibration risks been assessed for the risk to Health and Safety for site personnel?

  • Are Low/Anti vibration tools and equipment available and in use?

  • Are site personnel aware of HAVS and the risks associated?

  • Is the risk adequately controlled? e.g. Rotating use, regular breaks, anti vibration gloves, temperature regulation, correct working position etc

  • Has a HAVS card been completed for this activity?

  • Provide evidence of HAVS card checked

Noise

  • Monitored this Week?

  • If the task identified has potential to create noise, has this been considered in the RAMS?

  • Does PREP consider Noise as a Risk?

  • Has any realtime monitoring of the activities taken place?

  • Has any significant noise related activity been considered in the Weekly Meetings?

  • Is signage appropriate and clearly visible ?

  • Are all operatives in work area wearing correct PPE?

  • Are visitors / duty holders aware of the works and risks associated?

PREP - Personal Risk Evaluation Process

  • Monitored this Week?

  • Is PREP being completed at the point of work?

  • Has PREP been completed prior to commencement of new work / tasks?

  • Is there evidence of a review after breaks?

  • Have all members of the working party understood and signed onto the PREP card?

  • Are any new Hazards being created on completion of the task and is it recorded on the PREP card? Provide evidence.

  • Provide evidence of PREP cards checked

ELECTRICAL SAFETY / IMPRESSED VOLTAGE

  • Monitored this Week?

  • Are safe working distances respected?

  • Is appropriate PPE available?

  • Has Impressed Voltage been identified as a hazard?

  • Are Field equipment earths available and attached to plant in the work area.

  • Is CDM area under National Grid Rules?

  • Is it confirmed and formally recorded that "Occupiers duties have been fully transferred to the Principal Contractor" ?

  • Is A SSOW setup for the Control of Impressed Voltage on Construction SItes adhered to?

  • Is it confirmed and formally recorded that "Occupiers duties are retained by National Grid" ?

  • Demarcation remains as constructed and is an effective control from the system hazards e.g Cones all standing and correctly positioned, chain suspended, access point provided and notice up to date, hazard signs warning of adjacent equipment outside of work area.

  • Safety Document is available and held in safe custody, the work activity complies with requirements of any safety document. All RAMS are referenced on the working party register.

Observations

SAFETY OBSERVATION REPORT

  • Positive observations

  • Add media

  • Aspects to improve or Deviations

  • Add media

  • Action and person in charge

  • Date of completion

  • Satisfaction level of the visit (very poor; 10 excellent)

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.