Title Page

  • To be completed by the Senior Environmental Adviser or Nominated person prior to the start of construction work on site. Completed audit reports shall be stored on the QMS SharePoint Site.

  • Sensible Monitoring Audit Completed By:

  • Site Manager:

  • Contract Number:

  • Project Title:

  • Conducted on

Current Status

  • Any H&S actions identified shall be entered onto Audit / Inspection Action Log and brought to the urgent attention of the appropriate personnel as soon as possible. Contractor / Project Manager to be notified of actions required / taken.

  • 1) Is the project subject to the approval of the IPC / DECC / Scottish Executive?<br>a) If yes, are copies of signed project approval letters available?

  • Comments:

  • Attach any images relevant to question 1 here.

  • 2) What is the status of the project with respect to Local Authority Planning permissions?<br>a) Are copies of signed project approval letters available including new / permitted development?

  • Comments:

  • Attach any images relevant to question 2 here.

  • 3) What is the current status of the project?<br>a) Have any agreed Advanced works been undertaken?<br>e.g. pollarding of hedgerows, right of way fencing, site compound and pip dump establishment.

  • Comments:

  • Attach any images relevant to question 3 here.

  • 4) Has a site compound been established as per the agreed plan?

  • Comments:

  • Attach any images relevant to question 4 here.

  • 5) Have pipe dumps been established and have all environmental considerations been addressed?

  • Comments:

  • Attach any images relevant to question 5 here.

  • 6) Is the approved Environmental Statement / Environmental Review and relevant Appropriate Assessments available on site?<br>a) what sensitive areas of the project route been identified in the above and what mitigation measures are proposed for sensitive areas?<br>b) Does the implementation program allow for sufficient time and resources to address the mitigation measure?

  • Comments:

  • Attach any images relevant to question 6 here.

  • 7) Has a line walk / pre-entry survey been undertaken and recorded?

  • Comments:

  • Attach any images relevant to question 7 here.

Documents

  • The Following Documents Should Be Readily Available For Reference.

  • 8) Is there an Environmental Notice Board for the project?

  • Comments:

  • Attach any images relevant to question 8 here.

  • 9) As a minimum is the following environmental information displayed:-<br>- Environmental Policy Statement<br>- Environmental Guide<br>- Management of Fixed Sites<br>- Sustainable Construction of Large-Scale Projects<br>- Other applicable project documentation

  • Comments:

  • Attach any images relevant to question 9 here.

  • 10) Have all applicable appendices from the Environmental Requirements of the works information been developed by the Main Works Contractor?

  • Comments:

  • Attach any images relevant to question 10 here.

  • 11) Has the Project Environmental Plan (PEMP) been accepted for use by the client and Senior Environmental Adviser?<br>(check acceptance letter)

  • Comments:

  • Attach any images relevant to question 11 here.

  • 12) Has the MWC appointed a project Environmental Representative?<br>a) Are records available to demonstrate competence (do they address the min requirements of the MWC Safety Subgroup competence matrix)?

  • Comments:

  • Attach any images relevant to question 12 here.

  • 13) Does the MWC have suitable & sufficient resources to undertake inspections and audits?<br>a) Are records available to demonstrate competence (do they address the min requirements of the MWC Safety Subgroup competence matrix)?

  • Comments:

  • Attach any images relevant to question 13 here.

  • 14) Has an Environmental Aspects Register been established?

  • Comments:

  • Attach any images relevant to question 14 here.

  • 15) Do project RAMS consider significant environmental aspects / impacts which have been identified in the PEMP / Aspects Register?

  • Comments:

  • Attach any images relevant to question 15 here.

  • 16) Has the MWC Contractor and the Client set environmental objectives and targets for the project as per the SHEQ business plan?

  • Comments:

  • Attach any images relevant to question 16 here.

  • 17) Have the recommendations from the Sustainability Options Assessment Tool (SOAT) been adopted within the project?

  • Comments:

  • Attach any images relevant to question 17 here.

  • 18) Have interfaces, communications, roles and responsibilities been defined in the PEMP's?

  • Comments:

  • Attach any images relevant to question 18 here.

  • 19) Has the MWC issued an environmental audit programme?

  • Comments:

  • Attach any images relevant to question 19 here.

  • 20) Have the client issued a SHE Inspection & Audit Plan?

  • Comments:

  • Attach any images relevant to question 20 here.

  • 21) Has a log of communications with the regulatory authorities been established?

  • Comments:

  • Attach any images relevant to question 21 here.

  • 22) Has a register of all consents and approvals been established?

  • Comments:

  • Attach any images relevant to question 22 here.

  • 23) Is there a procedure available for addressing and monitoring the environmental performance of subcontractors?

  • Comments:

  • Attach any images relevant to question 23 here.

  • 24) Are current drainage plans for the site compound available?<br>a) Has a method for isolating site compound land drainage been provided ?

  • Comments:

  • Attach any images relevant to question 24 here.

  • 25) Does site have knowledge off existing drainage system? <br>a) Where is the discharge point, are consents in place?<br>b) Are drains colour coded for identification?

  • Comments:

  • Attach any images relevant to question 25 here.

  • 26) What is the foul water system at the site?<br>a) Are consents in place?

  • Comments:

  • Attach any images relevant to question 26 here.

  • 27) Are current interceptor drawings available where applicable?

  • Comments:

  • Attach any images relevant to question 27 here.

  • 28) What environmental issues / considerations have been included in the MWC Supervisors SHE Folder?

  • Comments:

  • Attach any images relevant to question 28 here.

  • 29) Has the Project Environmental Triangle been displayed and the SMS notice board?

  • Comments:

  • Attach any images relevant to question 29 here.

  • 30) Are there any incentives, information on energy efficiency and how are they communicated to staff?

  • Comments:

  • Attach any images relevant to question 30 here.

Procurement

  • 31) Have Permanent Materials been procured from the agreed project Sustainable Procurement Plan?

  • Comments:

  • Attach any images relevant to question 31 here.

  • 32) Have Temporary Materials (timber, aggregate, cement etc) been procured from the agreed project Sustainable Procurement Plan?<br>(excludes timer used for packaging)

  • Comments:

  • Attach any images relevant to question 32 here.

  • 33) Has any timber been procured from outside the EU or harvested from inside the EU for use on the project?<br>a) If Yes, has due diligence checks been undertaken in accordance with European Union Timber Regulations (EUTR)?

  • Comments:

  • Attach any images relevant to question 33 here.

  • 34) Has all timber been obtained through 'certified' sustainable sources and are certificates available?<br>e.g. FSC (Forest Stewardship Council), PEFC (Programme for the Endorsement of Forest Certification)

  • Comments:

  • Attach any images relevant to question 34 here.

  • 35) Has any Timber been procured from inside the EU for use on the project? <br>a) If Yes, are records (delivery notes / certificates) available from where the timber was purchased and delivered to, to meet obligations of traceability?

  • Comments:

  • Attach any images relevant to question 35 here.

Environmental Incidents

  • 36) Have Emergency Procedures been issued to the client and / or the MWC to deal with environmental incidents?

  • Comments:

  • Attach any images relevant to question 36 here.

  • 37) Are MWC emergency procedures relevant, available, and how have staff been made aware of them?

  • Comments:

  • Attach any images relevant to question 37 here.

  • 38) What incident reporting mechanisms are currently in place and how does it interface with the clients reporting process?

  • Comments:

  • Attach any images relevant to question 38 here.

  • 39) What training will be given int he use of Pollution Control Equipment? <br>e.g. Spill kits, booms, leak block

  • Comments:

  • Attach any images relevant to question 39 here.

  • 40) What training has been identified in the PEMP and what is the plan to deliver this training?<br>a) Has suitable and sufficient resources been allocated to support the training?

  • Comments:

  • Attach any images relevant to question 40 here.

  • 41) Does the induction include adequate site specific environmental information?

  • Comments:

  • Attach any images relevant to question 41 here.

Pollution Control

  • 42) Have requirements for emergency crew been defined and are suitable resources available?<br>(record names and contact details)

  • Comments:

  • Attach any images relevant to question 42 here.

  • 43) What communication equipment is available for site teams including emergency crews and restfullers etc?

  • Comments:

  • Attach any images relevant to question 43 here.

  • 44) Are documented and approved procedures available for refueling?

  • Comments:

  • Attach any images relevant to question 44 here.

  • 45) What training will be given for refueling?

  • Comments:

  • Attach any images relevant to question 45 here.

  • 46) Is diesel / oil storage fully compliant with the Control of Pollution Oil Storage Regulations 2001? <br>(Check bunding requirements, site glass, volumes, signage,security)

  • Comments:

  • Attach any images relevant to question 46 here.

  • 47) Are static / mobile storage tanks double skinned, is the outer skin intact, what measures prevent pollution from faulty connections?<br>e.g. drip trays under trigger handle.

  • Comments:

  • Attach any images relevant to question 47 here.

  • 48) Are all diesel / oil tanks located outside of sensitive areas or next to a sensitive receptor such as water course?

  • Comments:

  • Attach any images relevant to question 48 here.

  • 49) Has documented assessment of the fuel bowsers at the site, in relation to vulnerability to impact or hose detachment which would result in the uncontrolled release of the content been carried out?

  • Comments:

  • Attach any images relevant to question 49 here.

  • 50) Is there a traffic light sticker system in place to indicate the required use of drips trays under plant and equipment?

  • Comments:

  • Attach any images relevant to question 50 here.

  • 51) What will be the procedure for emptying drip trays?<br>(is this in accordance with the guidance from the Environment Agency.)

  • Comments:

  • Attach any images relevant to question 51 here.

  • 52) Is pollution control equipment held on site adequate to deal with the potential risks posed by construction activities?

  • Comments:

  • Attach any images relevant to question 52 here.

  • 53) Is pollution control equipment and materials easily accessible by relevant personnel (check spill kit contents)?

  • Comments:

  • Attach any images relevant to question 53 here.

  • 54) Is long term plant (>6 weeks) located in interceptors, drip trays or bunded areas?

  • Comments:

  • Attach any images relevant to question 54 here.

Waste Management

  • 55) Has a site waste management plan been produced in accordance with the clients SHE Bulletin?<br>(what is the version and when was is last updated)

  • Comment:

  • Attach any images relevant to question 55 here.

  • 56) Have key personnel completed the 'Watch your waste' training DVD in line with the H&S sub group training matrix?

  • Comment:

  • Attach any images relevant to question 56 here.

  • 57) Are the current waste management provisions at the site compliant with the Waste Management Plan?<br>(list waste streams)

  • Comment:

  • Attach any images relevant to question 57 here.

  • 58) Is waste segregated and stored in a manner preventing leakage or escape?<br>NB. General waste skips shall be covered to prevent interference from weather / vermin

  • Comment:

  • Attach any images relevant to question 58 here.

  • 59) Are skip locations prepared on an impermeable base?<br>a) Are impermeable membranes used where skips and waste containers are positioned on soft ground or near to surface water drains?

  • Comment:

  • Attach any images relevant to question 59 here.

  • 60) Is there a facility for the storage and disposal of Hazardous Waste?

  • Comment:

  • Attach any images relevant to question 60 here.

  • 61) Is the site likely to be registered as a Hazardous Waste Producer?<br>(greater than 500kg per annum)

  • Comment:

  • Attach any images relevant to question 61 here.

  • 62) Are Hazardous Wastes stored to prevent interference from 3rd parties, protected from the elements and kept away from drains or water courses?<br>NB. Secure area as a minimum, preference for lockable containers

  • Comment:

  • Attach any images relevant to question 62 here.

  • 63) Are skips labelled with type of waste and EWC classification?

  • Comment:

  • Attach any images relevant to question 63 here.

  • 64) Are suitable copies of the following held on site:<br>- Main Works Contractors - Waste Carrier 'Registration' Certificates?<br>- Waste Disposal Contractors - Waste Carrier 'Registration' Certificates?<br>- Landfill Licenses? <br>- Transfer Licenses? <br>- Waste Management Licenses?

  • Comment:

  • Attach any images relevant to question 64 here.

  • 65) Have all of the above been verified with the EA / SEPA?<br>a) Check verification evidence obtained from EA / SEPA website?

  • Comment:

  • Attach any images relevant to question 65 here.

  • 66) Has a log of Hazardous Waste types been established and maintained or are separate Hazardous Waste streams proposed?

  • Comment:

  • Attach any images relevant to question 66 here.

  • 67) Have Waste Management Exemptions been sought for activities such as reuse of excavated materials and any processing of waster material such as chipping of cleared vegetation?

  • Comment:

  • Attach any images relevant to question 67 here.

  • 68) If fly tipping likely to be a problem, what remedial / mitigation measures have been proposed?

  • Comment:

  • Attach any images relevant to question 68 here.

  • 69) Has the project any data on potentially contaminated land area's?<br>a) If Yes, then has it been dealt with in accordance with the clients SHE Procedure and defined in the PEMP?

  • Comment:

  • Attach any images relevant to question 69 here.

  • 70) Have the forecast waste quantities been included on the monthly rolling waste quantities issued for the Project Board pack?

  • Comment:

  • Attach any images relevant to question 70 here.

Noise, Mud, Dust, Traffic, Light

  • 71) Has an impact assessment of the proposed works been undertaken with respect to local residents?

  • Comments:

  • Attach any images relevant to question 71 here.

  • 72) What measures are proposed to mitigate the impact of the project on residents with respect to:<br>- Noise<br>- Light<br>- Dust <br>- Mud<br>- Traffic

  • Comments:

  • Attach any images relevant to question 72 here.

  • 73) Where a nuisance may be caused, have those likely to be affected by activities been informed in advance?<br>a) Has this been recorded on the communications log?

  • Comments:

  • Attach any images relevant to question 73 here.

  • 74) Have construction noise limits been specified in the contract and / or required by / agreed with the Local Planning Authority? <br>(e.g. in a planning consent or EA?)

  • Comments:

  • Attach any images relevant to question 74 here.

  • 75) Are hours of work as required by / agreed with the local authority (e.g. in a planning consent of Environmental Statement)?<br>a) If not, have changes been notified to and agreed with the Local Planning Authority?

  • Comments:

  • Attach any images relevant to question 75 here.

  • 76) What measures are proposed for dealing with mud on roads?

  • Comments:

  • Attach any images relevant to question 76 here.

  • 77) Has the need for wheel washing facilities been identified?<br>a) If so, where doe the wash water go?

  • Comments:

  • Attach any images relevant to question 77 here.

  • 78) Has a Traffic Management Plan been produced and accepted for the project?<br>a) Has there been a record of any traffic complaints?<br>b) Is there evidence that hauliers have been briefed on the plan by the project?

  • Comments:

  • Attach any images relevant to question 78 here.

Footpaths

  • 79) What footpaths will be crossed by the pipeline?<br>a) Have they been delineated / protected / signed as required by the Local Authority Footpath Officer?

  • Comments:

  • Attach any images relevant to question 79 here.

  • 80) Have any necessary closure / diversion notices been applied for and received?

  • Comments:

  • Attach any images relevant to question 80 here.

Trees and Hedges

  • 81) Are there any trees protected by a Tree Preservation Order (TPO)?

  • Comments:

  • Attach any images relevant to question 81 here.

  • 82) Has a hedgerow survey been carried out and documented?<br>a) Have any consent recommendations been identified?

  • Comments:

  • Attach any images relevant to question 82 here.

  • 83) Will / Have hedgerows been pollarded prior to bird nesting season?

  • Comments:

  • Attach any images relevant to question 83 here.

Water Management

  • 84) Has a Water Management Plan been produced?

  • Comments:

  • Attach any images relevant to question 84 here.

  • 85) What consents are required from the EA / SEPA / Client / or Internal Drainage Boards for watercourse crossings / work within 8 meters of Main Rivers or withing a floodplain?

  • Comments:

  • Attach any images relevant to question 85 here.

  • 86) What pre-construction drainage will be carried out to minimize the effects of construction activities?<br>a) Has the drainage been designed to mitigate the potential for pick up of silty water run-off?

  • Comments:

  • Attach any images relevant to question 86 here.

  • 87) What measure are proposed for controlling silt run off though the pre con drainage?

  • Comments:

  • Attach any images relevant to question 87 here.

  • 88) What measures are proposed to control sediment run-off from the spread / construction site to watercourses?<br>(for information CIRIA document 'Control of Water Pollution from Linear Projects' now available)

  • Comments:

  • Attach any images relevant to question 88 here.

  • 89) What EA / SEPA / Client consent and / or approval will be require for discharge to water courses:<br>- Disposing of water from trenches and excavations<br>- Well pointing / De-watering deep excavations<br>- High water tables ?

  • Comments:

  • Attach any images relevant to question 89 here.

  • 90) Has a plan been developed for watercourse bed and bank excavation methods and reinstatement details?

  • Comments:

  • Attach any images relevant to question 90 here.

  • 91) What type of permit to pump system is being proposed?

  • Comments:

  • Attach any images relevant to question 91 here.

  • 92) Have permissions for ground discharges been identified and logged in accordance with landowner and EA / SEPA / Client requirements?

  • Comments:

  • Attach any images relevant to question 92 here.

Protected Species and Ecologically Sensitive Areas

  • 93) Are there any licenses required (or consent conditions) to handle or disturb protected species or the habitat?<br>(e.g. Badgers, Bats, Great Crested Newts, Dormice, Reptiles, Water Voles, White Clawed Crayfish, Birds including special species)

  • Comments:

  • Attach any images relevant to question 93 here.

  • 94) Are there any restrictions or requirements associated with working in or close to ecologically sensitive areas ?<br>(e.g. SSSI, RAMSAR, SPA, SAC, SINC)

  • Comments:

  • Attach any images relevant to question 94 here.

Archaeology

  • 95) Has the County Archaeologist approved the proposed archaeological works and mitigation measures?

  • Comments:

  • Attach any images relevant to question 95 here.

  • 96) Is the project compliant with any agreed written scheme of investigation and any additional requirements of the County Archaeologist ? <br>(e.g. supervision of topsoil strip)

  • Comments:

  • Attach any images relevant to question 96 here.

  • 97) How is the project adequately communicating progress to the County Archaeologist?

  • Comments:

  • Attach any images relevant to question 97 here.

Storage

  • 98) Has a nominated person(s) been appointed to manage the COSHH stores?<br>a) is there a register of all COSHH material on site?<br><br>a) Has he / she been briefed with regard to their roles and responsibilities?

  • Comments:

  • Attach any images relevant to question 98 here.

  • 99) Have COSHH assessments been carried out and are data sheets available for all materials on the register?

  • Comments:

  • Attach any images relevant to question 99 here.

  • 100) Are all drums and other containers labelled with their contents, suitable for use and in food condition?

  • Comments:

  • Attach any images relevant to question 100 here.

  • 101) Are materials stored in such a way to prevent damage, leakage or uncontrolled emissions?

  • Comments:

  • Attach any images relevant to question 101 here.

  • 102) Has secondary containment for drummed oil been provided?

  • Comments:

  • Attach any images relevant to question 102 here.

  • 103) Are dispensing drums supported on drums cradles, do procedures define method to be followed?

  • Comments:

  • Attach any images relevant to question 103 here.

Venting

  • 104) Will work be scheduled and managed to avoid unnecessary venting or uncontrolled gas releases?

  • Comments:

  • Attach any images relevant to question 104 here.

Project Clean Up / Reinstatement

  • 105) Does the ES / PEMP define requirements and legal obligations for clean-up and reinstatement?

  • Comments:

  • Attach any images relevant to question 105 here.

  • 106) Have timescales been defined for reinstatement and has the EA / SEPA / Client been informed?

  • Comments:

  • Attach any images relevant to question 106 here.

Sign Off Audit

  • Print Name:

  • Signature:

  • Project Manager Name:

  • Signature:

  • Designation:

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.