Title Page

  • undefined

  • Conducted on

test sheet

INSTALLATION PRESSURE BEFORE TEST check the readings on all gauges and record the pressure for each system (gauges on main valve)

  • system 1

  • system 2

AUTOMATIC PUMP START (during the test record)

  • (A) jockey pump start pressure

  • (B) jockey pump stop pressure

  • (C) main fire pump start pressure

INSTALLATION PRESSURE AFTER TEST check the readings on all gauges and record the pressure for each system (gauges on main valve)

  • system 1

  • system 2

ALARM VALVE AND GONG

  • Record time taken for gong to sound after opening test valve allow to sound for minimum of 30 seconds

  • Is everything in working order

STOP VALVES

  • (A) is the MAIN STOP VALVE secured fully open by padlock and strap monitored

  • (B) are all other stop valves controlling water supply fully open with padlock and strap and monitored

ELECTRICAL ALARM

  • Have the alarms operated and did the central station receive the signal

system leakage

  • are they any signs of leakage from the system

TRACE HEATING

  • (A) is the trace electrical heat functional

  • (B) is the lagging of the pipework in good condition

STORAGE TANK

  • (WEEKLY CHECK) is the tank full of water

  • (MOTHLY CHECK) is the ball valve cover and access cover secure

  • tester signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.