Information

  • Company

  • Select date

  • Lease

  • Rig #

  • Operation

  • Operator

  • Company rep.

  • Rig Manager

  • Driller

  • Days since last recordable accident

  • Days since last lost time accident

Location Safety & Safety Equipment

  • Signs in place at location entrance. Std. 1910.145

  • No smoking. Std. 1910.145

  • Hard hat area. Std. 1910.145

  • Steel toe boots. Std. 1910.145

  • Eye protection required w/ side shields. Std. 1910.145

  • Authorized personnel only. Std. 1910.145

  • Cell phone use in designated area only. Std. 1910.145

  • Visitor tracking system in place. Std. 1910.38

  • Clearance from all energized power lines 10 ft. Std. RP54 10.1.1

  • Emergency escape device in place & installed properly. Std. 1910.36

  • Geronimo on-line and ready for immediate access and use. Std. RP54 6.10.1

  • All guy wires flagged & up. Std. RP4G 7.6.F

  • Fire extinguishers at each anchor min (2-30#) Std.1910.157

  • No vehicles inside of anchor pattern when possible. Std. RP545.1.15

  • First aid kit in place, full, clean, and good condition. Std. 1910.151

  • Blood borne pathogen kit. Std. 1910.151 (b)

  • Eye wash station in place. Std. 1910.151

  • Hearing protection provided. Std. 1910.95

  • Fall protection to assure 100% tie off 100% of the time. Std. 1910.66

  • Full body harness w/double climbing hook or y-lanyard. Std. 1910.66

  • Self retracting life line attachment in good condition. Std. 1910.66

  • Self retracting line used at tubing board. Std 1910.132

  • Double latch hooks on all lanyards & lifting rigging. Std 1910.66

  • Breathing packs in place @ anchors. Std. RP55 3.3

  • H2S sensors in place and calibrated, checked daily. Std. 1910.1000.E

  • Wind sock or flag in place. Std. RP55 4.5

  • Designated smoking area posted. Std. 1910.145.C.2.i

  • Safe briefing areas designated and posted. Std. 1910.38.C.4

  • Emergency phone list. Std. RP54 4.2.1

  • OSHA poster. Std. 1903.2 (A)(II)

  • Additional Comments

Guy Lines

  • Minimum 4 crown guys anchored. Std. RP4G 6. 1-8

  • Tubing board guys crossed and anchored properly. Std. RP4G7. 1-8

  • Mast guy lines proper size - 5/8" min- with factory eyes @ crown (swedged & thimbled & tagged) Std. RP9B3.7.4

  • Approved clevis's attaching guy line to Derrick. Std. BP H/L TBL 5

  • Tubing board guy lines proper size - 9/16" min. - with factory eye's at board and crossed with appropriate sag (10/12). Std. RP9B3.7.4 BP H/L TBL 5

  • All guy lines in good condition- free of kinks, wickers, & corrosion. Std. RP4G 5.1.C

  • Ground anchors with weatherproof tag permanently attached to each anchor installed & pull tested every 2 years w/ documentation. Std. RP4G 14.5

  • All anchors inspected w/ tag and visible markers. Std. RP4G14.5

  • All chains secured. Std. RP4G 7.1-8

  • All non-factory ends fitted with min. 3 clamps of proper size or 4 clamps if through sheaves. Std. RP4G13.3 & RP9B 3.7.4

  • Additional Comments

Foundation

  • Check location for solid footing under unit. Std. RP4G15.1

  • Steel mat under load bearing portion of rig and jacks where foundation is questionable. Std. RP4G15.1

  • Additional Comments

Mast / Derrick

  • Manufacturer name and specs. Plate in place and legible. Std. RP4G52.1

  • Guying data plate on Derrick. Std. RP54-9.9.2

  • Derrick/mast certification 5yr. Std. RP54/RP4G

  • Derrick/mast load path certification 2 yr. Std. RP54/RP4G

  • No visible damage to legs, braces. Std. RP54 9.16.1

  • All welds in good condition. Std. RP54 9.2.4

  • Ladders in good condition and properly positioned. Std. RP54 9.3.1-2

  • Board properly mounted and in good condition. Std. RP54 9.2.17

  • Board fingers in good condition and snubbed. Std. RP54 9.2.17

  • Board rails in good condition and snubbed. Std. RP54 9.2.17

  • Rod board properly mounted and in good condition. Std. RP54 9.2.17

  • Rob board fingers in good condition and snubbed. Std. RP54 9.2.17

  • Rob board rails in good condition and snubbed. Std. RP54 9.2.17

  • Derrick climber and counter weight installed & properly anchored. Std. 1910.132

  • Derrick climber available at floor when Derrick is raised. Std. 1910.27(d)(5)

  • Derrick free of loose objects. Std. RP54.8.2.5

  • All board hinge points free traveling and lubricated. Std. RP54 9.2.4

  • Derrick stabilizer on scoping cylinder in good condition. Std. RP54 9.2.4

  • Insure Derrick latch dogs are in place and flagged.

  • Crown sheaves guards in place and in good condition. Std. RP54 9.7.5

  • All pins in place W/ safety pins in place. Std. RP54 9.2.8

  • Tail pin screws not screwed out over 6 inches of threads. Std. BP H/L TBL 5

  • Check all hydraulic cylinders for leaks.

  • Purge air from hydraulic rising cylinders.

  • No loose objects left in Derrick; transfers, rod shucks, chains, etc. inventory tools taken into Derrick. Std. RP54 8.2.5

  • All tie back ropes secured when not in use. Std. BP H/L TBL 5

  • All light fixtures class 1-zone 2 rating. Std. 1910.307.b.1

  • All lights secured with safety cables. Std. RP54 9.3.1

  • No splices. Std. 1910.305

  • CGB's (cord grip bushing) in place on all lights and electrical connections. Std. 1926.403

  • Additional Comments

Carrier

  • Handrails and steps installed, secured with pins, and in good condition. Std. 1910.23

  • Toe boards in place on hand rails. Std 1910.23

  • All belts and fans guarded. Std. 1910.212

  • Wheels chocked. Std. RP54 11.1.2

  • Fuel tanks labeled- no smoking, flammable. Std. 1910.145(c)(2)(I)

  • No fuel leakage. Std. OSHA 14.2J

  • Tires and wheels in good condition. Std. OSHA 14.2E

  • Hydraulic leveling jacks in use. Std. OSHA 14.2G

  • Hydraulic leveling jacks secured with lock nuts. Std. OSHA 14.2H

  • Good foundation under jacks.

  • No loose or flammable material stored in cab, no starting fluid. Std. OSHA 14.1A

  • Glass and mirrors in good condition. Std. 1926.50A/R

  • Cab and carrier up to DOT specs, w/ current cert. (if required) Std. KWS

  • Emergency equipment- kill switch available & functional reflectors available or flares. Std. BP safety manual 5.1-2

  • Unit grounded w/ solid copper rod or to we'll head. Std. 1926.954

  • Seatbelt functional. Std. DWOP3.1.4

  • High noise areas posted. Std. DWOP 3.3.2

  • All vessels labeled as to their contents. Std. 1910.12

  • Additional Comments

Draw works

  • All guards in place. Std. RP54 9.4.2

  • Drum guard in place to protect employees, their clothing & equipment from fouling in drum. Std. RP54 9.4.2

  • Tubing line is in good condition. Std. 1910.184

  • Date Installed

  • Wire rope management system in place on tubing line etc. Std. API RP4G

  • Swab line in good condition. Std. 1910.184

  • Date Installed

  • Sufficient wraps on tubing drum 5 @ ground 7 @ floor. Std. OSHA insp.

  • 2 1/2-3 wraps on dead,one anchor, correctly wrapped, clamp secured, retainer and guard bolts in place. Std. BP H/L Policy

  • Hydrostatic brake-check for leaks, good condition, anti-freeze protected. Std. OSHA Policy

  • No cathead in use. Std. BP H/L Policy

  • Brakes and brake linkage in good condition, pins secured. Std. OSHA Policy

  • Proper brake linkage adjustment. Std. BP H/L Policy

  • Brake assembly parts meet or exceed OEM specs. Std. DWOP 8.14

  • Assure road gear lockout. Std. RP54 11.1.2

  • Winch line in good condition. Std. 1910.184

  • Date Installed

  • Grade 8 chain in use for all lifting operations & rigged properly & tagged correctly. Std. 1910.184

  • Proper hooks on all lifting chains. Std. 1910.184

  • Crown-o-matic inspected and tested. Std. DWOP 8.3

  • Certified lift eye on sand line. Std. BP H/L 3.1

  • Additional Comments

Operator station/work platform/floor

  • All controls labeled properly. Std. OSHA Insp

  • Kill switch available, functional, and protected. Std. OSHA Insp.

  • Authorized personnel only. Std. 1910.145

  • Work floor level and properly supported and secured w/ cert tag. Std. OSHA Insp.

  • Work floor support cables with factory eyes and approved clevis's. Std. 1910.184

  • All guard rails and hand rails in place and secure. Std. 1910.23(c)(1)

  • Support/suspension pins installed w/ keepers (no bolts) Std. OSHA Insp.

  • Minimum of two stairways to floor. Std. RP54 9.3.10

  • All stairs secured. Std. 1910.36

  • Additional Comments

Racking Board & Diving Board

  • Guard rails in good condition and pinned, when in use. Std. 1910.23(c)(1)

  • Holes in floor covered. Std. 1910.23(a)(8-9)

  • Good foundation under racking boards 3x12's. Std. RP4G 15.1

  • Additional Comments

Power Tongs

  • Safety gate in place and functional. Std. RP54 6.8.3

  • Back up-proper type in place. Std. RP54 9.9.4

  • Stiff arm & snub line, clamps in place and in good condition. Std. RP54 9.9.4

  • Tong head guard in place and in good condition. Std. RP54 6.8.3

  • Hoses and fittings in good condition, no leaks. Std. RP54 9.9.9

  • Tong support line in good condition. Std. 1910.184

  • Tong safety hanger in good condition. Std. 1910.184

  • Additional Comments

Traveling Assembly

  • Blocks in good condition. Std. RP54 9.7.1

  • Sheave guards in place. Std. RP54 9.7.4

  • Hook in good condition, lock in good condition. Std. RP54 9.7.1

  • Elevator links in good condition. Std. RP8B

  • Annual insp. date.

  • Elevators in good condition. Std. RP8B

  • Annual insp. date.

  • Rod hooks-latching and spring mechanism wear. Std. RP8B CAT. IV

  • Annual insp. date.

  • Transfer elevators in good condition-safety latches & transfer line in good condition. Std. RP54 9.7.1

  • Annual insp. date.

  • Transfer pickup eye in good condition, nut lock pin in place. Std. RP54 9.7.1

  • All bolts in place in side covers on blocks. Std. RP54 9.7.1

  • All bolts in place on all traveling equipment & tight. Std. RP54 9.7.1

  • Load rated rod transfer w/ safety latch in place. Std. BP H/L Policy

  • Rod transfer eye bolt nuts keyed. Std. Manfct. Spc.

  • No weight bars hung off rod board. Std. BP S.M. 3.4.4

  • Additional Comments

Circulating systems

  • Standpipe secured to Derrick. Std. RP54 8.a

  • Rotary hose secured both ends, top end to Derrick. Std. API 7K-7L

  • High pressure fittings on all connections. Std. 1910.169

  • Safety relief valve in place and set properly. Std. 1910.169

  • Relief line properly anchored. Std. 1910.169

  • Pump guards in place. Std. 1910.212

  • Mud pit walkways and stairs in good condition & anchored. Std. 1910.22-23

  • Mud mixing area, all ppe in place. Std. 1910.132

  • Additional Comments

Well Control Equipment

  • Assure test chart for all BOPE. Std. RP54 6.4.1

  • All bolts in place in all flanges. Std. RP54 6.4.1

  • Check all ring grooves and rings. Std. RP54 6.4.1

  • Floor valve in place w/ proper x-over. Std. RP54 6.4.2

  • Accumulator properly installed-no leaks. RP54 6.4.1

  • Cover over blind/shear ram control handle. Std. RP53 12.5.3.f

  • Hydraulic system charged. Std. RP54 6.4.1

  • Controls labeled. Std. RP54 6,4,1

  • All BOPE tested and functional. Std. RP54 6.4.1

  • BOP control lines and valves identified. Std. RP54 6.4.11

  • All unused accumulator lines capped. Std. RP54 6.4.18

  • Accumulator lines in open/closed position. Std. BP S.M. 5 1-2

  • Additional Comments

Safety Equipment

  • Fire extinguishers minimum 30 lb. min. 2, located at guy line anchors. Std. 1910.157

  • Personal protective equipment in use, std. RP54 5.2.3

  • No loose clothing. Std. 1910.132(a)

  • Gloves. Std. 1910.132(a)

  • Hard hat worn by all (plastic). Std. RP54 5.2.1

  • Safety glasses. Std. RP54 5.2.2

  • Steel toe boots. Std. RP54 5.2.3

  • Fire retardant clothing(FRC). Std. BP Policy

  • Visitor hard hat and safety glasses required. Std. 1910.132(a)

  • Additional Comments

Procedures In Place

  • Crews trained in JSA Program. Std. RP54 6.1.7

  • JSA program in use w/ written JSA's in place. Std. RP546.1.7

  • Emergency plan in place and understood by all employees. Std. 1910.38.b

  • Golden rules understood by all employees. Std. BP Policy

  • Stop program in place and in use(observation program). Std. DWOP 3.1.3

  • LOTO in place and utilized. Std. 1910.417

  • SDS/SPCC plan in place and current. Std. BP S.M. 5.1-2

  • Tool pusher and driller BOP certified. Std. DWOP 15.2

  • First aid/CPR 2 per crew w/ cert. card. Std. RP54 4.3.1

  • No jewelry policy. Std. BP S.M.

  • Full body harness available. Std. 1910.66

  • "Y" lanyards available. Std. 1910.66

  • Auxiliary lifting equipment register on-site ( wire rope, chains, hooks, chuckles). Std. BP H/L Policy

  • Additional Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.