Title Page

  • Conducted on

  • Auditor

Unit 52-54 Slicing room, ham store, blast chiller

Cleanliness

  • Is the changing room clean and tidy given active production

  • Are staff wearing clean protective clothing

  • Is the standard of cleanliness satisfactory given active production

  • Are the WHBs accessible with soap and paper towels available

Equipment

  • Are the auto slicers in good working order

  • Are the multivacs in good working order

  • Are the vac packers in good working order

  • Is the hand slicer in good working order

  • Is the robo machine in good working order

  • Is the shrink/dip tank in good working order

  • Are all WHBs supplied with hot running water

Structure

  • Is the ceiling in good repair

  • Is the flooring in good repair

  • Are the walls in good repair

  • Are all other fixed items in good repair (electrical sockets, hooks etc)

Labelling, label store & goods out chillers

Cleanliness

  • Is the standard of cleanliness satisfactory given active production

  • Is the WHB accessible with soap and paper towels available

Equipment

  • Are the WHBs supplied with running hot water

  • Are the labelling machines in good working order

Structure

  • Is the ceiling in good repair

  • Are the floors in good repair

  • Are the walls in good repair

  • Are all other fixed items in good repair (electrical sockets, hooks etc)

Unit 54 Cooker area & mezzanine floor

Cleanliness

  • Is the area in front of the cooker free from excessive water on the floor

  • Is the WC clean and tidy

  • Is the mezzanine area clean and tidy

  • Is the area under the stairs clean and tidy

Equipment

  • Is the WC working

  • Is the WHB supplied with hot and cold running water

  • Is the cooker working

Structure

  • Is the ceiling in good repair

  • Is the flooring in good repair

  • Are the walls in good repair

  • Are all other fixed items in good repair (electrical sockets, hooks etc)

Units 57 & 58 Raw production & welfare areas

Cleanliness

  • Are staff wearing clean protective clothing

  • Is the cleanliness of the raw pork chiller satisfactory given active production

  • Is the cleanliness of the butchery room satisfactory given active production

  • Is the cleanliness of the tumbling room satisfactory given active production

  • Is the cleanliness of the gammon prep room satisfactory given active production

  • Is the cleanliness of the staff welfare areas satisfactory

  • Are WHBs accessible with soap and paper towels available

Equipment

  • Is the auto injector in good working order

  • Are the tumblers in good working order

  • Is the netting machine in good working order

  • Is the clipping machine in good working order

  • Are the cooking trolleys in good working order

  • Are the WHBs supplied with running hot water

Structure

  • Are the ceilings in good repair

  • Is the flooring in good repair

  • Are the walls in good repair

  • Are all other fixed items in good repair (electrical sockets, hooks etc)

Outside areas

  • Is the bin area and bins clean and tidy given active production

  • Is the bin capacity sufficient for current production levels

  • Is vegetation kept clear away from the building perimeter

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.