Title Page

  • Conducted on

  • Prepared by

  • Site conducted

  • Level

Drawing

  • Are services installed to the latest issued electrical drawings

  • Drawing reference number

Communal - Corridor Services feeding apartments

  • Has the correct containment been installed throughout the corridor

  • Has all the submains been installed.

  • Has all the door entry cabling installed

  • Has all the TV cabling installed

  • Are the cables dressed in

  • Are all hangers secured with bolts and anchors

  • Where clipped direct are metal fixings installed where needed

Communal Services

  • Are back boxes for sockets, spurs and data installed, set to correct location and protruding adequately

  • Are all cables entering metal track/plasterboard according to requirements

  • Are all cables cut to adequate length, marked and taped

  • Do LV cables have adequate metal fixings

  • Is lighting wired correctly and set out to the correct location

  • Are the smoke/heat detectors, I/U units and AOV wired correctly and set out in the correct location

  • Are the CCTV Cameras wired correctly and set out in the correct location

  • Is the door entry wired correctly and set out in the correct location

First Fix Completion

  • Any additional comments

  • West Coast Foreman

  • Client Foreman

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.