Title Page
-
Conducted on
-
Prepared by
-
Site conducted
-
Level
- 1st
- 2nd
- 3rd
- 4th
- 5th
- 6th
- 7th
- 8th
- 9th
- 10th
- 11th
- 12th
- 13th
- 14th
-
Blocks
- A
- B
- C
Drawing
-
Are services installed to the latest issued mechanical drawings
-
Drawing reference number
LTHW Pipework
-
Check services pipework runs are correct sizes as per drawing
-
All hangers/brackets are the correct distance to meet the mechanical spec/ installation guides
-
Are pipework penetrations through walls sleeved and made of the same type of material
-
Have fittings been crimped correctly
-
Have expansion brackets been crimped correctly
-
Have the correct valves been installed in the correct locations
-
Is the pipework labelled correctly
-
Pressure test carried out an witnessed by customer site manager
-
Customer signature
-
Has the pipework been lagged with the correct size lagging
-
First fix complete
Boosted Cold Pipework
-
Check services pipework runs are correct sizes as per drawing
-
All hangers/brackets are the correct distance to meet the mechanical spec/ installation guides
-
Are pipework penetrations through walls sleeved and made of the same type of material
-
Have fittings been crimped correctly
-
Have the correct valves been installed in the correct locations
-
Is the pipework labelled correctly
-
Pressure test carried out an witnessed by customer site manager
-
Customer signature
-
Has the pipework been lagged with the correct size lagging
-
First fix complete
Completion
-
Any Additional Comments
-
West Coast Foreman
-
Client Foreman