-
Engineer name and tech number
-
Date conducted
-
Conducted by
-
TM risk assessment
- Traffic
- Third party
- Ground
- Weather
- garden
Customer
-
Scoring matrix
5 - Above and beyond (promoter)
4 - Role model (promoter)
3 - Meets minimum expectations (passive)
2 - Below minimum expectations (detractor)
1 - Unacceptable (super detractor) -
Customer
-
Eta
-
Introduction and Walkthrough
-
Dealing with challenges
-
Showcase
-
End of visit walk through
-
Close and survey awareness
-
Over all score
-
Observation
-
Supporting evidence
Technical
-
Scoring matrix
5 - Above and beyond (promoter)
4 - Role model (promoter)
3 - Meets minimum expectations (passive)
2 - Below minimum expectations (detractor)
1 - Unacceptable (super detractor) -
Technical
Install Sky+HD
-
Dish location
-
Cable route
-
Sm3 use
-
Broadband optimisation
-
Product/technical/competitor knowledge
Install SkyQ
-
Follows iknow2
-
Broadband optimisation
-
Sm3 and chrome app usage
-
Showcase
-
Product/technical/competitor knowledge
Service
-
Sm3 use
-
Fault finding
-
Broadband optimisation
-
Full system check
-
Product/technical/competitor knowledge
-
Overall score
-
Observation
-
Supporting evidence
Quality
-
Scoring matrix
5 - Above and beyond (promoter)
4 - Role model (promoter)
3 - Meets minimum expectations (passive)
2 - Below minimum expectations (detractor)
1 - Unacceptable (super detractor) -
Quality
-
Presentation
-
Organised approach to working
-
Quality of install
-
Finishing touches
-
Cleanliness
-
Overall score
-
Observation
-
Supporting evidence
Compliance
-
Scoring matrix
5 - Above and beyond (promoter)
4 - Role model (promoter)
3 - Meets minimum expectations (passive)
2 - Below minimum expectations (detractor)
1 - Unacceptable (super detractor) -
Mft/timing compliance
-
Process compliance (iknow2 usage etc)
-
Stocksmart compliance
-
Van compliance (telematics, condition etc)
-
Overall score
-
Observation
-
Supporting evidence
Health and safety
-
Scoring matrix
5 - Above and beyond (promoter)
4 - Role model (promoter)
3 - Meets minimum expectations (passive)
2 - Below minimum expectations (detractor)
1 - Unacceptable (super detractor) -
Risk assessment
-
Manual handling
-
PPE usage
-
Damage awareness
-
Working at height
-
Overall score
-
Observation
-
Supporting evidence
Summary
-
Agreed actions
-
Further action required
-
Engineer comments/feedback
-
TM signature
-
Engineer signature