Title Page
-
Conducted on
-
Prepared by
-
Location
General Conditions
-
Site safety board - Policies, First Aid Attendant certificate, most recent inspection, OH&S Inspection, emergency contact list, etc, posted?
-
OH&S Regulations & WCE Site Safety Manual available in site office?
-
Site Safety Plan Readily available?
-
FLHA’s completed?
-
Completed orientation forms available for each worker on site?
-
Office swept clean, garbage removed regularly, and organized?
First Aid
-
First aid assessment completed and posted?
-
First Aid station private, clean and well organized?
-
Emergency Response Plan posted?
-
Site Map showing location of muster point, first aid, emergency stations and spill kits posted?
-
SDS’s readily available to workers?
Personal Protective Equipment
-
All workers wearing CSA approved hardhats?
-
All workers wearing CSA approved footwear?
-
All workers wearing high visibility vests?
-
All workers wearing CSA approved safety glasses?
-
All workers wearing gloves (as needed)?
-
All workers wearing appropriate work clothing?
-
Respiratory protection is worn when required?
-
Fall protection equipment is worn when required and installed to manufacture specifications?
General Site Access
-
Site fencing installed along site perimeter and secured?
-
Site rules prominently posted at entrance to site?
-
Overhead work - control zones installed with signage?
-
Overhead power lines visibly marked/flagged, with signage?
-
Overhead power 30M33 available on site as required?
-
Yard is organized, clear of debris and material hazards. Clear walking and driving paths maintained?
-
Site parking is free of debris, vehicles parked orderly, cleared/salted in winter?
Fire Prevention
-
Smoking area defined with signage and located 6 meters away from entrances and intakes?
-
Min 20lbs. Fire extinguisher located in site office?
-
Min 20lbs. Fire extinguisher located in the vicinity of a heater?
-
Min 20lbs. Fire extinguisher in close proximity to hot work?
-
Fire drill completed annually and posted on site safety board?
Chemical Storage and Handling
-
Do all decanted chemicals have a workplace label?
-
Chemicals stored in well ventilated location per SDS?
-
PPE for Chemical use available and used per SDS?
-
Chemical storage signage posted at location?
-
All cylinders stored upright and secured?
-
Spill kits readily available, in good condition and located as per site safety map?
Access and Egress
-
Are all corridors and walkways clear? No materials, cords or debris?
-
Are all stairways clear? No materials, cords or debris?
-
Guardrails top rail min 40 inches high?
-
Toeboards present on the bottom of the guard rail?
-
Ramps minimum 20” wide cleared and have handrail installed if over 4ft. high?
-
Immovable trip hazards clearly marked?
-
Temporary lighting installed to ensure good visibility of all hazards and work tasks?
-
Walkways min 20 inches wide, over 4ft. have handrails?
-
Stairways over 44” wide have handrails on both sides? Stairways under 44” wide have handrails on one side?
-
Vertical/horizontal impalement hazards are capped?
-
All holes/temporary openings over 2” have a secured covering?
Electrical
-
Electrical panels protected/suitable for exposures and climate?
-
Electrical panels have signage indicating “Live Panel” or are secured/locked at all times?
-
Cable feed to electrical panels identified, marked and protected from damage?
-
GFCI’s used outdoors or in wet/damp locations?
-
Extension cords free from fraying, splitting, prongs in place and in good condition?
-
Isolation/lockout/Tagout used when required?
Tools and Equipment
-
Tools used are inspected before use and operated per manufacturer specifications?
-
Power tools have guards in place and appear operable?
-
Grinders have guards?
-
Tools properly stored and clean?
-
Are red tags readily available to all on site?
Tools and Equipment
-
Tools are in good repair and workers inspect before use?
-
Do hand and table saws have guards and are they operable?
-
Do grinder have guards and are they operable?
-
Are tools properly stored and in clean condition?
-
Are red tags readily available to all workers on site?
Hoisting & Rigging
-
Is rigger competently trained?
-
Proper rigging available for lift and was it inspected before use?
-
Do all loads have tag lines?
-
Are edge softeners installed as necessary?
-
Has a control zone been established around the full length of the lift?
-
Is the crane/hoist manual available in the crane or hoisting equipment?
-
Is the crane operator certified and is a copy of the certification available on site?
-
Has the operator of the crane or hoisting equipment completed a daily inspection?
-
Has an annual inspection been completed on the crane is proof of certification available on site?
-
If a critical lift is being performed has the critical lift plan been completed?
Excavations
-
Have utility locates been completed?
-
Is the one call documentation/locate documentation available at the work location?
-
Are materials and soil piles > 2 ft. From the edge of the trench or excavation?
-
Is there a ladder or safe entry-exit no further than 25 ft. from workers in the trench or excavation?
-
If water is accumulating in the excavation, is it actively being removed/pumped?
Engineering
-
Is shoring/re-shoring appropriate to drawings?
-
Excavations over 4 feet in depth require shoring/benching or trench box.
Ladders
-
Is the ladder clean and free of damage?
-
Are all extension ladders secured at the top and bottom?
-
Is ladder set up on a firm level base?
-
Do extension ladders extend 1 meter past the landing?
-
Are all extension ladders set up at a 4:1 ratio?
-
Step ladders- are workers standing on top two steps?
-
Step ladders - are spreader bars fully extended?
-
Is a hoist rope available for hoisting material/tools/equipment to the next level?
Housekeeping
-
Is the lunchroom clean, swept and are the garbage bins emptied regularly?
-
Are garbage cans available throughout the project?
-
Are all protruding nails removed from wood before disposal or storage?
-
Are throw zones delineated with a warning line and signage?
-
Are all materials neatly organized throughout the project?