STEEL PLENUM
-
Has the plenum been installed
-
has the plenum been fire mastic sealed
-
is the plenum water sealed back to the subframe
-
is the water proof free from holes
-
inspected by
-
inspected by
-
date & time of inspection
TOP HATS
-
Has the correct top hat been installed
-
Has the top hat been installed to the correct centre's
-
Has the top hat been fixed to the SFS studs
-
has the correct fixings been used
-
Has the top hat been installed to the correct Hight & Level
-
Date & time of inspection
-
Inspected by
-
Inspected by
-
Photo of elevation
Helping Hand Brackets
-
Have the correct helping hand and brackets been used
-
Have the helping hands been set out correct as per design
-
Have all brackets been installed correct as per design
-
Have the correct fixings been used as per design
-
Has the correct slots and dead fix positions been used on the brackets
-
Date & Time of inspection
-
Inspected by
-
Inspected by
-
Photo of elevation
Fire stops HOLD POINT
-
Has the fire strategy location DWG been followed
-
Has the correct FSI paraflam 120 & 75 vertical fire barriers been installed
-
Are the vertical FSI fire barriers installed correct 2 non- combustible fixings centers per 1000mm piece
-
Have the retaining brackets been inserted 75%into the vertical fire barrier and has made intimate contact with substrate
-
Have all vertical fire barriers been tightly abutted
-
Is the vertical fire barriers under the correct compression minimum 5-10mm
-
Has the foil tape been applied to all joints and corners, internally & externally
-
Has foil tape been applied to all abutted joints and not covering the Intermescent strip
-
Has the correct FSI specification closed state horizontal fire barriers been installed
-
Have the horizontal retaining brackets been installed 3 brackets per 1000mm piece fixed at 250mm, 500mm and 750mm centers using non-combustible fixings
-
Have the horizontal fire barriers been installed with intimate contact with substrate
-
Have the horizontal fire barriers been installed tightly between all brackets
-
has the plenum penetration into the closed state fire barrier been fire mastic sealed
-
Date and time of inspection
-
Inspected by
-
Inspected by
-
Photos of elevation
Visqueen
-
Has the correct visqueen been used
-
has the visqueen been fire mastic to the substructure
-
is the visqueen fixed back to the substructure
-
is the visqueen free from holes and damaged
-
date & time of inspection
-
inspected by
-
inspected by
Insulation
-
Has the correct spec insulation been installed
-
Has the insulation been abutted to each other with no visible gaps
-
Has the insulation been installed with intimate contact with substrate
-
Has the insulation been cut tightly around bracket penetrations
-
Has the correct fixings been used
-
Is the insulation free from damages
-
Date and time of inspection
-
Inspected by
-
Inspected by
-
Photos of elevation
Horizontal & Vertical rails
-
Have the correct dead fix and elongated holes been used
-
Has the correct vertical rails been installed
-
Are all rail correct as per grid line and datum
-
Are all rails lined and level
-
Has the setting out been followed as per design
-
Date & Time of inspection
-
Inspected by
-
Inspected by
-
Photos of elevation
CP BOARD
-
Has the correct SPEC board been used Y-WALL board
-
has the correct amount of fixings been installed
-
is the board free from damaged and gaps
-
Date & Time of inspection
-
Inspected by
-
Inspected by
-
Photos of elevation