Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Principal Contractor

General Management Arrangements

  • Is the Morrisons visitor booked signed daily by the contractor

  • Is the advice to maintenance notice displayed in the store signing in book

  • Site notice board/Podium on display.

  • F10 Displayed & up to date

  • Insurance displayed & in date

  • H&S law poster displayed with the correct details

  • CPP on site, reviewed & updated by PC

  • Site structural report available

  • Asbestos survey information on site & reflects the current scope of work

  • Operatives/Visitors sign in with the contractor

  • Inductions undertaken and logged

  • Evidence of tool box talks

  • RAMS reviewed & signed off by PC

  • RAMS are site specific and signed by all operatives

  • COSHH risk assessments available

  • Waste carriers licence/Certificate of registration

  • Emergency procedures in place and aligned to existing store/site arrangements

  • First aider details on display

  • Accident book on site

  • First aid kit available

  • Completed fire plan on site & kept up to date

  • Evidence of daily site inspections available

  • Management procedure for direct Morrisons and maintenance contractors in place. eg RAMS approval, induction.

  • Records of relevant training cards & competencies on site and in date

  • Temporary works coordinator/supervisor appointed with designs and registers available

  • Relevant permits to work are correct issued & signed

  • Traffic management plan

  • Lifting plan

  • LOLER Pre use inspection sheets completed

  • Harness inspection sheets completed

  • Ladder/step ladder inspection sheets completed

  • Anenometer readings documented

Site Environmental Management

  • Are specific work and storage areas segregated from staff and public

  • Welfare facilities on site and maintained

  • Adequate lighting in place

  • Means of escape kept clear in all work related areas

  • Correct PPE as per RAMS

Access Loading and Storage

  • Store,site compound and storage areas secure & tidy

  • Are noise levels acceptable & are any issues being addressed

  • Any deviation from the proposed site set up plan

  • Specific warning signage in relation to the site

  • General safety signage in place

  • PPE signage in place

  • Good housekeeping

  • General waste being segregated and removed from site

  • Any hazardous waste on site & is it stored correctly

  • Safe access/egress to site

  • Suitable access equipment being used

  • Access equipment inspected under LOLER in date and inspections logged

  • Training cards and certificates on site for use of access equipment are of the right type and in date

  • Scaffold register up tp date with handover certificate and inspection log

  • Scaff tag present and correct

  • Scaffold inspection regime logged

  • Lifting equipment inspected under LOLER in date and inspections logged

  • Is spill kit available

Roof Works

  • Is roof access restricted to staff/public during works

  • Is suitable edge protection in place

  • Is demarcation required and in place

  • Are step overs required and installed

  • Is lay down material used

  • Is a first aid kit available at the roof access point

  • Is the air horn available if required

  • Are appropriate tools being used for activities undertaken

  • Extension leads managed & in good condition

  • Work equipment PAT tested / Calibtrated or inspected in line with PUWER

  • Is vibration monitoring taking place for vibration generating tools and plant & are any issues being addressed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.