Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Principal Contractor
General Management Arrangements
-
Is the Morrisons visitor booked signed daily by the contractor
-
Is the advice to maintenance notice displayed in the store signing in book
-
Site notice board/Podium on display.
-
F10 Displayed & up to date
-
Insurance displayed & in date
-
H&S law poster displayed with the correct details
-
CPP on site, reviewed & updated by PC
-
Site structural report available
-
Asbestos survey information on site & reflects the current scope of work
-
Operatives/Visitors sign in with the contractor
-
Inductions undertaken and logged
-
Evidence of tool box talks
-
RAMS reviewed & signed off by PC
-
RAMS are site specific and signed by all operatives
-
COSHH risk assessments available
-
Waste carriers licence/Certificate of registration
-
Emergency procedures in place and aligned to existing store/site arrangements
-
First aider details on display
-
Accident book on site
-
First aid kit available
-
Completed fire plan on site & kept up to date
-
Evidence of daily site inspections available
-
Management procedure for direct Morrisons and maintenance contractors in place. eg RAMS approval, induction.
-
Records of relevant training cards & competencies on site and in date
-
Temporary works coordinator/supervisor appointed with designs and registers available
-
Relevant permits to work are correct issued & signed
-
Traffic management plan
-
Lifting plan
-
LOLER Pre use inspection sheets completed
-
Harness inspection sheets completed
-
Ladder/step ladder inspection sheets completed
-
Anenometer readings documented
Site Environmental Management
-
Are specific work and storage areas segregated from staff and public
-
Welfare facilities on site and maintained
-
Adequate lighting in place
-
Means of escape kept clear in all work related areas
-
Correct PPE as per RAMS
Access Loading and Storage
-
Store,site compound and storage areas secure & tidy
-
Are noise levels acceptable & are any issues being addressed
-
Any deviation from the proposed site set up plan
-
Specific warning signage in relation to the site
-
General safety signage in place
-
PPE signage in place
-
Good housekeeping
-
General waste being segregated and removed from site
-
Any hazardous waste on site & is it stored correctly
-
Safe access/egress to site
-
Suitable access equipment being used
-
Access equipment inspected under LOLER in date and inspections logged
-
Training cards and certificates on site for use of access equipment are of the right type and in date
-
Scaffold register up tp date with handover certificate and inspection log
-
Scaff tag present and correct
-
Scaffold inspection regime logged
-
Lifting equipment inspected under LOLER in date and inspections logged
-
Is spill kit available
Roof Works
-
Is roof access restricted to staff/public during works
-
Is suitable edge protection in place
-
Is demarcation required and in place
-
Are step overs required and installed
-
Is lay down material used
-
Is a first aid kit available at the roof access point
-
Is the air horn available if required
-
Are appropriate tools being used for activities undertaken
-
Extension leads managed & in good condition
-
Work equipment PAT tested / Calibtrated or inspected in line with PUWER
-
Is vibration monitoring taking place for vibration generating tools and plant & are any issues being addressed