Information
-
Document No.
-
Audit date
-
Audit Title (Site)
-
Location
-
Network
- AusNet Services
- AusNet - Downer
- UE - Downer
- UE - ZNX
- JEN
- Powercor/CitiPower
- Other
-
Work Type
-
Brief description of the scope of works completed
-
Auditor
- Adam Mitchard
- Andrew Parker
- Aymie Vick
- Brendan Murphy
- Cameron Turnbull
- Chris Gibbons
- Damien Westcott
- Darren Vick
- Dave Hudson
- Doug Nicholls
- Edgar Catane
- Epilinio Bonao
- Gary Wayne Jenkins
- Graham Perkins
- Harrison Whelan
- Jake Kelly
- James Bannon
- Jesse Hentschel
- Joe Bannon
- Jordan Ashwood
- Justin Mitchelmore
- Kyle Curran
- Lawrence Norton
- Luke Baxter
- Mark Wadsley
- Matt Slade
- Misha Szczerkowski
- Paul Nightingale
- Phil Salter
- Preston Watson
- Raul Bautista
- Rob Bird
- Rodney Renzella
- Ross Hunter
- Shane Duffy-Beel
- Shane Hopcraft
- Sheree Zwar
- William Hickey
- Zachery Hill
-
Works Completed By
- Adam Mitchard
- Andrew Parker
- Aymie Vick
- Brendan Murphy
- Cameron Turnbull
- Chris Gibbons
- Damien Westcott
- Darren Vick
- Dave Hudson
- Doug Nicholls
- Edgar Catane
- Epilinio Bonao
- Gary Wayne Jenkins
- Graham Perkins
- Harrison Whelan
- Jake Kelly
- James Bannon
- Jesse Hentschel
- Joe Bannon
- Jordan Ashwood
- Justin Mitchelmore
- Kyle Curran
- Lawrence Norton
- Luke Baxter
- Mark Wadsley
- Matt Slade
- Misha Szczerkowski
- Paul Nightingale
- Phil Salter
- Preston Watson
- Raul Bautista
- Rob Bird
- Rodney Renzella
- Ross Hunter
- Shane Duffy-Beel
- Shane Hopcraft
- Sheree Zwar
- William Hickey
- Zachery Hill
Indicate that the item has been checked/verified for compliance by inserting your detailed observation comment or by noting “N/A” as appropriate (indicate by number in the “comments” column if comments are recorded at the end of the report). Conformance = 0 point Minor Nonconformance = 5 points Major Nonconformance = 20 points (Safety) Major Nonconformance = 10 points (Other)
OH CONSTRUCTION COMPONENT
-
Work completed to Work Specification (Unit Description) with consideration for description inclusions
Poles
-
Pole/CAMM Numbers Installed
-
HV UG cable ID installed
-
Pole sizes in accordance with construction drawings
-
Pole - Correctly installed to Standards, e.g. Depth & Straight
-
Pole - Correctly Dressed to relevant drawing number & Neat
-
Pole – excess soil removed around hole
-
Concrete Poles Earthed to relevant standards
-
Surface Logs 300mm Depth
-
Stays Installed as per Work Instructions. Stay installed to ensure correct rod depth. Tail removed
-
Stay lock nut tight against thimble and Rod thread burred correctly
-
Length of rod remaining above ground must be less than 300mm
-
Stay bracket installation, to relevant Drawing No. Bracket tongue installed, if applicable
-
Stay warning tube secured (tied off)
POLE TOP
-
Washers Installed - Conical/Spring
-
Phase Plates & Neutral Plates and Tags fitted where required
-
Correct crossarm construction
-
Crossarm correct size
-
No tails on HV ties
-
Vibration damper clear (by hand width) of helical termination/armour rods, if applicable
-
Armour rods fitted if applicable
-
All hardware bonded together. Wood Pole construction only.
CONDUCTORS
-
Correct conductor size/type installed
-
Correct conductor terminations and fittings installed.
-
Conductor tails to the correct length
SUBSTATION/SWITCHES
-
Correct Fusing as per relevant Standards Table or Work Instructions
-
LV earth Installed to Standard. Earth cable covered to first pin and installed to correct depth.
-
Transformer Earthing Correct connections used M type connectors.
-
Transformer square on pole
-
Minimum bending radius of HV droppers maintained.<br>1 bracket installed on short leads 2 brackets installed on long leads<br>
-
Correct Size LV Leads to Standard minimum requirements - Neat & Tidy
-
Circuit labels installed
-
Appropriate Warning Signs Fitted where applicable and at the correct height 1.8m high
-
LV earth break 2.7m high, if applicable
-
Cables fastened at maximum 1m intervals
-
Possum Guard fitted (cleats) & correct height SWER 2.0m other 1.8m to bottom / Earth Cover Strips Fitted to 2.7m
OVERALL CONSTRUCTION
-
Construction Completed to Standard Design
RETIREMENT
-
Pole/stay retirements – removed old pole and stay rod - hole backfilled and compacted.
MISCELLANEOUS
-
General Site Condition Cleaned up and rubbish removed from site
-
Reinstatement Completed
-
Work Instruction requirements completed.
-
Discrepancies in Work Instruction noted.
POLE ENDS
-
Neutral Plates and Tags fitted
-
Correct/ Undamaged Termination fitting used for cable type.
-
Service cable separation >25mm from conductive equipment
-
Cable support brackets used
-
Correct connectors used on overhead conductors
-
Service Insulation in good condition
-
Pole box cover fitted correctly
POINT OF ATTACHMENT
-
Neutral Tags fitted
-
Correct/Undamaged Termination fitting used for cable type.
-
Service cable separation >25mm from conductive equipment
-
Service Insulation in good condition
-
Box cover fitted correctly
-
Drip loop <250mm
-
Access to POA clear
-
POA bracket fitted correctly
-
Drip loop not behind bracket, eg will not catch on metal if service drops free from attachment
CLEARANCES
-
POA - minimum 3.0m and > 6.0m
-
Centre or Carriageway of road or any part of freeway, primary road or highway - minimum 5.5m
-
Any part of secondary road or collector road - minimum 4.9m
-
Any part of any other road - minimum 4.6m
-
Over any part of a driveway - minimum 4.6m
-
Over other ground traversable by vehicles - minimum 4.6m
-
Elsewhere not traversable by a vehicle - minimum 3.0m
-
Over a structure on which a person cannot stand, eg sign, blank wall, fence - minimum 100mm
-
Over a structure not normally accessible but on which a person can stand, eg carport, verandah - minimum 100mm
-
Over a structure normally accessible to persons, eg balcony - minimum 2.7m
UNDERGROUND LIVE JOINTING
-
Size of joint hole
-
Weather protection
-
Obstacles in work area
PUBLIC LIGHTING POLE (OVERHEAD)
-
Pole / CAMM numbers installed
-
CAMM#
-
Neutral plates and tags fitted
-
Correct / undamaged termination fittings used for cable type.
-
Service cable separation >25mm from conductive equipment.
-
Cable support brackets used.
-
Correct connectors used on overhead conductors
-
Service installation in good condition
-
Pole box cover fitted correctly.
-
Pole size / depth correct (not slip base or frangible)
PUBLIC LIGHT POLE (UNDERGROUND)
-
Pole / CAMM numbers installed
-
CAMM#
-
Cable protected at pole entry point
-
Correct connection at base of pole
-
Pole earthed correctly.
-
Pole access door correctly fitted.
-
Neutral tags fitted.
-
Correct cable size / connection.
-
Pole installed at correct depth.
-
Correct pole termination.
-
Pole size / depth correct.
PUBLIC LIGHT HEAD AND BRACKET (INCLUDING JOINT USE POLE)
-
Correct head installed
-
Head installed at correct height:<br>Head height, 80W min 7.5m/ Head height, 125W min 7.5m/ Head height, 150W min 9.0m/ Head height, 250W min 10.0m
-
Correct bracket and installed correctly
-
Clearance between bracket and conductors:<br>66kV - 150mm from metal parts/ 22kV - 1200mm from metal parts
-
Clearance between insulated stay and conductors:<br>66kV – 750mm from fibreglass stay/ 22kV – 450mm from fibreglass stay
-
Correct PE size / Correct globe size.
-
LV ABC light installed above conductors
General Comments
Photos
-
Add media
Signature
-
Add signature