Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel or PCBU

SAFTEY OBSERVATION

  • 1. Has a tool box meeting been conducted?

  • 2. Has a risk assessment been completed for acivities being performed?

  • 3. Are all hazards identified in the risk assessment?

  • 4. Are all hazards appropriately controlled?

  • 5. Was a site induction carried out on arrival to site?

  • 6. Are all persons able to produce relevant licenses/tickets?(eg. OHS Induction, High Risk Work, Drivers license, Traffic Control)

  • 7. Have all workers been inducted and signed onto SWMS?

  • 8. Do the SWMS Adequately describe the sequence of basic job steps?

  • 9. Are the controls as described on the SWMS being followed?

  • 10. Has the SWMS been updated in the past 2 years?

  • 11. Have verifications of competency been conducted?

  • 12. Are MSDS sheets available onsite and up to date?

  • 13. Is traffic control plan in place and authorised for use?

  • 14. Are traffic control signs set up correctly, appropriate, and in good condition?

  • 15. Are barricades in place to protect unauthorised persons access to site?

  • 16. Are all persons onsite wearing required PPE?(eg. head, eye, ear, uv)

  • 17. Is all PPE in good condition?

  • 18. Is there a first aid kit onsite?

  • 19. Is the first aid kit up to date and adequate for likely injuries that may be sustained?

  • 20. Is an emergency plan in place and mobile or satellite communication available?

  • 21. Are fire extinguishers readily available, unobstructed, and test tagged?

  • 22. Are all power leads and tools tested and tagged?

  • 23. Are all tools and equipment in good condition?

  • 24. Is the work area tidy?

  • 25. Have appropriate distances to power lines been identified and controlled?

  • 26. Are all equipment and materials clear of trench edges?

  • 28. Are trenches deeper than 1.5m shored or benched?

  • 28. Are adequate ladders along trench where necessary?

  • 29. Are high risk work areas controlled adequately?(eg. reversing plant,10m exclusion zone, confined space, hot work, heights)

  • 30. Is plant onsite equiped with pre start, beacon, uhf, first aid, fire equipment and in reasonable condition?

Corrective Actions

  • Enter any corrective actions that will be undertaken

Sign Off

  • On site representative

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.