Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel or PCBU
SAFTEY OBSERVATION
-
1. Has a tool box meeting been conducted?
-
2. Has a risk assessment been completed for acivities being performed?
-
3. Are all hazards identified in the risk assessment?
-
4. Are all hazards appropriately controlled?
-
5. Was a site induction carried out on arrival to site?
-
6. Are all persons able to produce relevant licenses/tickets?(eg. OHS Induction, High Risk Work, Drivers license, Traffic Control)
-
7. Have all workers been inducted and signed onto SWMS?
-
8. Do the SWMS Adequately describe the sequence of basic job steps?
-
9. Are the controls as described on the SWMS being followed?
-
10. Has the SWMS been updated in the past 2 years?
-
11. Have verifications of competency been conducted?
-
12. Are MSDS sheets available onsite and up to date?
-
13. Is traffic control plan in place and authorised for use?
-
14. Are traffic control signs set up correctly, appropriate, and in good condition?
-
15. Are barricades in place to protect unauthorised persons access to site?
-
16. Are all persons onsite wearing required PPE?(eg. head, eye, ear, uv)
-
17. Is all PPE in good condition?
-
18. Is there a first aid kit onsite?
-
19. Is the first aid kit up to date and adequate for likely injuries that may be sustained?
-
20. Is an emergency plan in place and mobile or satellite communication available?
-
21. Are fire extinguishers readily available, unobstructed, and test tagged?
-
22. Are all power leads and tools tested and tagged?
-
23. Are all tools and equipment in good condition?
-
24. Is the work area tidy?
-
25. Have appropriate distances to power lines been identified and controlled?
-
26. Are all equipment and materials clear of trench edges?
-
28. Are trenches deeper than 1.5m shored or benched?
-
28. Are adequate ladders along trench where necessary?
-
29. Are high risk work areas controlled adequately?(eg. reversing plant,10m exclusion zone, confined space, hot work, heights)
-
30. Is plant onsite equiped with pre start, beacon, uhf, first aid, fire equipment and in reasonable condition?
Corrective Actions
-
Enter any corrective actions that will be undertaken
Sign Off
-
On site representative
-
Auditor's signature