Permit to work number linked to this check list.
-
Working at heights Permit/List number - (auto generated)
-
Conducted on
-
Prepared by
-
Company
-
Location
-
undefined
-
Sub Location
- NATIONAL OFFICE ZONE 1
- WALTHAM LODGE ZONE 2
- HACHIKO ZONE 3
- ENDAL ZONE 4
- LYNX ZONE 5
- JAGUAR ZONE 6
- LEOPARD ZONE 7
- BETSY ZONE 8
- NURSERY ZONE 9
- LAB BLOCK ZONE 10
- APOLLO ZONE 11
- WPSI MAIN OFFICE ZONE 12
JOB DETAILS
-
What works will be undertaken? Please give full details of the tasks involved.
-
Special Tools / Equipment to be Used (MEWP, Ladders, scaffold etc)
-
Is any other work currently being undertaken that may interact or affect this permit? (Quote Permit numbers where applicable)
Hazards - Fill in the relevant sections below.
-
Are you Qualified / Trained to undertake this work?
-
Have all personnel effected by the work been notified?
-
Has the working area been fenced or barricaded and warning signs in place?
-
Is there a risk of coming into contact with Overhead services such as Power Cables / Live Busbars etc?
-
Will the fire suppression system (sprinklers) need isolating?
-
Will the fire alarm/sensors need masking during the work?
Roof Access (Only required if roof access required)
-
Is a safe means of access to the roof provided?
-
Are Crawl boards with hand rails & roofing ladders to be used?
-
Is there a safe tested anchor point provided to secure workers using a Harness and Lanyard?
-
Have the Harness and Fall Arrest Lanyards to be used been inspected in the last 6 months?
-
Is the Fall Arrest Lanyard the correct length? (i.e. 3m shorter than the height of the structure)
-
Is Edge Protection required and fitted?
-
Is edge protection correct height? (Top Rail 1100mm Intermediate Rail 600mm 150mm Toe Board)
-
Have Fragile Surfaces been Protected? (i.e. Polycarbonate Skylights - Covered or Fenced off)
-
Has the weather forecast been checked?
-
Are the wind speeds being monitored using an anemometer? Max Speed 12.5m/s or 28mph gust.
-
Is the roof free of ice / frost?
-
Is lightning forecast?
-
Are there any ducts / vents / chimneys on the roof?
-
Is there a risk from fumes, dust or corrosion?
-
Is there a risk of encountering or disturbing asbestos?
-
Asbestos permit completed and other precautions in place to include additional PPE
-
Is there a rescue plan for getting an injured or ill worker down from the roof?
MEWP (Scissor Lift / Boom Lift)
-
Do you hold a current IPAF 3a / 3b Powered Access Licence? Please use media tag to add photographic evidence of licence.
-
Have you checked the work area including access ways for fragile surfaces i.e. drain lids/ manhole covers etc?
-
Have you checked wind speed using a handheld anemometer if working outside? Max Speed 12.5m/s or 28mph gust.
-
Have you got a Harness and Fixed Lanyard for operating a Boom Lift?
-
Have you checked for overhead hazards to avoid crushing injuries?
-
Is there a Standby Person on the ground trained to use the lowering controls in the event of a breakdown?
-
Have you got the Remote Control Tether to use the "Walking the Dog Method" when moving the platform in congested areas or through doorways?
-
Has the MEWP got a Valid LOLER Inspection Certificate?
Scaffolding (Fixed)
-
Has the scaffold been designed / erected and inspected by a competent person - and load rated for the works to be undertaken?
-
Is the scaffold tied to the structure using approved methods i.e. Hilti Fixings / Through Ties etc.
-
Has the scaffold got a Licence where required? i.e. Public Road / Pavement
-
Has the scaffold been fitted with a Scafftag Inspection System?
-
Has the Scafftag been completed in the last 7 days?
-
Is the Scaffolding protected from Vehicle Impacts at the base?
-
Is Debris Netting / Brick Guards required to stop items falling?
-
Are Rubbish Chutes required?
-
Are Ladders secured correctly / protected by self closing gates and have the required 3 rungs / 1m Take off area above the scaffold platform?
-
Is the scaffold protected at night, to prevent trespassers / unauthorised access?
Tower Scaffold
-
Do you hold a valid PASMA 3T competence card?
-
Has the tower been built correctly? Correct Height:Base Ratio / Use of Outriggers etc?
-
Is the work platform set up correctly - Top Guard Rail 1100mm high / Intermediate Guard Rail 600mm & Toe Boards 150mm high?
-
Have the Wheels been levelled and Locked?
FLT - Man-Riding Cage
-
Has the Cage been secured to the FLT using Clamps?
-
Has the Cage been secured using a back up method i.e. Chained the the Back Rest on the mast?
-
Has the FLT had a LOLER Check in the last 6 months (Used for lifting persons)?
-
Has the Man Riding Cage been LOLER Inspected in the Last 6 Months?
-
Has the Tilt Control in the FLT been locked out in accordance with the HSE Guidance issued in PM28 - Issue 4?
-
Having moving parts on the FLT been guarded so that the person working in the cage, doesn't make contact with moving parts?
-
Is there a method of communication between the Driver of the FLT and the worker in the Cage? i.e. 2 way radio.
-
Has the FLT Driver been trained in the use of FLT with the Cage mounted, and understands the safety rules. i.e. using handbrake / lock out of controls / remaining with the FLT at all times.
-
Has the Operative in the Cage got a Safety Harness and Fixed Lanyard (1.5 -2.0m) securely anchored to the designated floor anchor point in the platform.
-
Has the Harness and Lanyard been Thoroughly Inspected in the last 6 months?
Ladders / Stepladders
-
Is the ladder / stepladder being used for works of Short Duration (Max 30 mins in the same location) and Light Works (Max 25kg Tools / Equipment)
-
Is the ladder / stepladder the correct height for the works been undertaken? (Work not permitted from top 2 steps of a stepladder)
-
Is the Ladder / Stepladder Industrial Rated( i.e. SWL >150Kg)?
-
Is the Ladder / Stepladder in good condition? Is an Inspection Tag in place?
-
For Extension Ladders can the safe working Angle 75 Degrees (4:1 Ratio) be achieved?
-
Can the ladder be tied or secured at Top / Bottom?
-
Is the ladder suitable for the Environment - i.e. Fibreglass Non-conductive ladder for electrical works?
Other Precautions Required
-
Do you need to undertake any other precautions to undertake works safely?
-
Do you require any further safety / rescue equipment to undertake works safely?
I confirm that all necessary measures are in place to carry out the tasks safely and in accordance with the hazards identified on the permit.
-
Validity - Start time
-
Validity - Estimated completion time.
-
Permit acceptor
Hand Back and Cancellation of permit
-
I confirm that the work has been completed/partially completed, checked by myself and the area left in a safe and tidy condition.
-
Full Name and Signature of the acceptor and competent person/persons in Charge
-
Full name and signature of the permit issuer
-
Full Name and Signature of Duty manager. (If required)
-