Title Page
-
Project Title
-
Site Location
-
Inspection Date & Time
-
Audit by
SIPP & PTW
-
Is SIPP available?
-
Is PTW available?
-
Are control measure listed in SIPP / MRA complied?
Housekeeping
-
Inspection area tidy, clean and well organised?
-
Access ways obstructed?
-
Tripping hazards (including floor finishes)?
-
All electrical cleaning equipment tested?
-
All equipment stored under correct conditions?
-
Rubbish disposal area clean and clear?
-
Sharps removal procedure in place?
Electrical
-
Is there any electrical equipment/appliance usage?
-
Is all portable equipment tested and labeled?
-
Leads undamaged?
-
Trailing leads?
-
Sockets overloaded?
Chemical Exposure
-
Is there any chemical usage?
-
Exposure adequately controlled?
-
Data sheet information available?
-
Spillage procedure in place?
-
Correctly stored?
-
Correctly disposed of?
-
Disposal of hazardous waste in place?
-
Flammable liquids correctly stored/signed?
Machinery
-
Is there any machinery usage?
-
All guards in place?
-
Kept clean of rubbish?
-
Emergency stop buttons fitted?
-
Safety warning notices in place?
-
PMA / PMT in place? Yes
PPE (Personal Protective Equipment)
-
Correct type for hazard identified?
-
Good condition?
-
Correctly stored?
Hazard
-
Is there any hazard identified during inspection?
-
Details of hazard identified.
Declaration
-
Recommendation
-
Details of recommendations.
-
Upload picture of contractor working on site
-
Contractor name and signature
-
Auditor name and signature