Drill Rig Details
-
Inspection No. - GenInsp[number]
-
Inspection Title
-
-
Conducted on
-
Conducted By
-
Location
Amenities
-
Sufficient lighting available
-
Adequate cooling and heating
-
Office furniture in good condition
-
Free of rodents and pests
-
Bins regularly emptied
Emergency Response
-
Emergency muster established and signed
-
Safe means of access and egress had been established
-
Directional signs in place to ensure crew can be located
-
Emergency Response Guide carried in vehicles
-
Emergency response information up to date
-
Fire extinguishers accessible, charged and currently tagged
-
Spill kit accessible and fully stocked
-
Communication maintained including mobile phone or satellite phone in remote areas
-
Adequate number of first aides available
-
First aid available and maintained
Housekeeping
-
Work area free of trip or slip hazards
-
Tools and equipment stored correctly
-
Walkways and platforms clear of equipment, tools and grease
-
Bins available for waste disposal
-
Site free of wind blown litter
Laydown Areas
-
Laydown areas delineated
-
Materials and equipment stacked neatly
Sump Pits
-
Sump pits fenced
-
Plastic liners in mud pits free of visible damage
-
Muds contained within pits and channels and disposed appropriately
Work Area
-
Vehicles parked out of exclusion zone
Environmental
-
All work within approved disturbance area and conditions met
-
Copy of REF at work area
-
Copy of listed flora and fauna fact sheets at work area. e.g. Mallee Fowl
-
Detected listed species raised on LCC
-
Mud pits back filled within 2 months of use
-
Tracks less than 4 metres in width
-
Tracks being maintained
-
Photographs taken before and after any track maintenance
-
Project Manager advised of any the discovery of heritage artefacts
-
Areas of known heritage artefacts pegged and not disturbed
-
Saline water spills identified, reported and rehabilitated
-
Airborne dust minimised from road use and other activities
-
Work not performed on a catastrophic fire ban day
-
Equipment, materials and waste removed after demobilisation
-
Areas rehabilitated to a satisfactory standard
-
Exhaust emissions acceptable
Hazardous Substances
-
Safety Data Sheets available
-
Fuel storage and generators in bunded areas
-
Appropriate PPE worn when handling hazardous substances
-
Containers are appropriately labelled
Guarding/Safety Devices
-
Guarding installed on rotating parts of engine and pumps
-
Rod cage in place and interlocks operational
-
Emergency stops accessible, checked and working condition
-
Isolation switches in place, accessible and operational
-
Correct isolation procedures followed
High Pressure Systems
-
Hydraulic hoses in good condition and leak free
-
Pressurised mud/air lines and connections in good condition
-
Whip checks fitted to pressurised mud/air lines and in good condition<br>
-
Relief valves serviced with appropriately rated pin or equivalent
-
Mounting steps and ladders non-slip and in good condition
Lifting Equipment
-
Winch cable free from bird nesting, kinks and frays
-
Lifting equipment including cables, lever hoists, shackles and hooks in condition and currently tagged
-
Slings stored correctly
-
Haul plugs, clam shells, collars or equivalent on good condition
-
Handrails and grab rails in place and secured on platforms, ladders and steps
Drill Rig General
-
Daily and weekly prestart checks completed
-
Regular servicing carried out
-
Walkways, platforms, steps and handrails secure and in good condition.
-
Hand tools such as stilsons in good condition
-
Mast locks in place
-
Foot clamps in good condition
-
Outriggers in good condition with base plates available
-
Drill breakout tools free from damage and cracks
-
Gauges visible and operational
-
Control levers in good condition and operational
Personal Protection
-
PPE and appropriate clothing worn and in good condition
-
Additional PPE available
-
UV protection available and used
-
Adequate supplies of water available
Electrical
-
Power cords, plugs and generators are in good condition and tagged
-
Generators in good condition with prestart checks completed
Welding and Cutting
-
Gas cylinders restrained
-
Hoses and connections in good condition
-
Flashback arresters fitted to hand piece and cylinders
-
Hot work permit in place
-
Adequate fire suppression and standby for hot work
Vehicles, Mobile Plant, Traffic Management
-
Vehicle prestart checks completed
-
Vehicle visibly maintained and serviced
-
Vehicles reverse parked and out of exclusion zone
-
Vehicle wheels chocked
-
First aid kit available and maintained
-
Fire extinguisher secured and currently tagged
-
Reverse beeper and lights operational
-
Loads adequately restrained
-
Tow points in good condition
-
Recovery equipment available
-
Vehicles spotted when reversing
-
Pedestrians and mobile plant segregated.
Mobile Plant
-
Prestart checks completed
-
Mobile plant visibly serviced and maintained
-
Tyres, tracks and rims in good condition
-
Hydraulic lines in good condition and free of leaks
-
Steps and handrails in good condition
-
Fire extinguisher in place, serviced and currently tagged
-
Reversing beeper and lights operational
-
Seat belt worn and in good condition
-
Seat set correctly and good condition
-
Engine free of any leaks
Actions
Inspector comments:
-
Comments:
-
Inspector Signature
-
Action Plan
Actions
-
Issue to be resolved
-
Due date
-
Assigned to