Title Page

  • Inspector:

  • Supervisor:

  • Company:

  • Location:
  • Date:

INSPECTION

  • Has a JobSTART been completed and communicated to workers and Isolation Permit in place for all tasks involving interaction with electricity

  • Are only licensed electrical workers carrying out the electrical work?

  • Can workers demonstrate how they conducted a ‘test for dead’?

  • Are all circuits including portable generators protected by earth leakage device (RCD)

  • Evidence of electrical equipment including RCD's inspected, tested and tagged in accordance with legal requirements by qualified personnel

  • Electrical leads are secured off the ground by insulated hooks and/or lead stands

  • Are all switches on electrical equipment correctly identified

  • Are all defective tools or cords removed from services and tagged "Out of Service"

  • Isolation tags along with both master and individual locks are provided and used for electrical isolations

  • All electrical isolation points / switches clearly identified

  • Temporary distribution boards have appropriate electrical warning signage, fixed to the ground and weatherproof

  • Temporary distribution boards are lockable (for isolation purposes)

  • All main boards include a system circuit map

Inspection Team

  • Signature:

  • Signature:

  • Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.