Title Page
-
Inspector:
-
Supervisor:
-
Company:
-
Location:
-
Date:
INSPECTION
-
Has a JobSTART been completed and communicated to workers and Isolation Permit in place for all tasks involving interaction with electricity
-
Are only licensed electrical workers carrying out the electrical work?
-
Can workers demonstrate how they conducted a ‘test for dead’?
-
Are all circuits including portable generators protected by earth leakage device (RCD)
-
Evidence of electrical equipment including RCD's inspected, tested and tagged in accordance with legal requirements by qualified personnel
-
Electrical leads are secured off the ground by insulated hooks and/or lead stands
-
Are all switches on electrical equipment correctly identified
-
Are all defective tools or cords removed from services and tagged "Out of Service"
-
Isolation tags along with both master and individual locks are provided and used for electrical isolations
-
All electrical isolation points / switches clearly identified
-
Temporary distribution boards have appropriate electrical warning signage, fixed to the ground and weatherproof
-
Temporary distribution boards are lockable (for isolation purposes)
-
All main boards include a system circuit map
Inspection Team
-
Signature:
-
Signature:
-
Signature: