Information
-
WORKPLACE INSPECTION CHECKLIST
-
Site. Downer:
-
Frequency Bi Monthly
-
Frequency Monthly
-
Frequency Weekly
-
Conducted on
-
Prepared by
-
Department / Area
-
Inspection Team
-
Inspection Team
1.0 - Administration / General
-
1.1 - Are the Environmental & Rehabilitation policy on Display
-
1.2 Is signage alerting workers to site safety requirements visible (PPE etc)
-
1.3 Are Inductions taken place
-
1.4 Are safety boards erected on site
-
1.5 Is drinking water and toilets available
-
1.6 is the Zero Harm Rep. & Zero Harm Committee in place
-
1.7 Are "Permits to work" being issued when required. (View Sample)
2.0 - Personal safety
-
2.1 - Are Safety Glasses / goggles used as requested.
-
2.2 - Is additional protection being worn for tasks such as grinding / welding
-
2.3 - Is hand protection, gloves used / worn as required.
-
2.4 - Is foot protection worn as required.
-
2.5 - Is hearing protection worn where required.
-
2.6 - Is appropriate / required PPE clothing being worn.
-
2.7 - Is the appropriate PPE available when required.
-
2.8 - Do workers know to report personal safety concerns, including hazards injuries, incidents, & near misses.
-
2.9 - Are relevant procedures / work instructions & SWMs accessible to workers
-
2.10 - Is work undertaken in compliance with SWMS. List SWMs checked.
-
2.11 - Are smoking restrictions adhered to.
3.0 - Floors walkways & work areas
-
3.1 - Are paths of travel free of trip / slip hazards.
-
3.2 - Are lighting levels adequate.
-
3.3 - Are work areas free of non essential items & debris.
-
3.4 - Emergency exit lighting operable?
8.0 - Public Protection / Security
-
8.1 Have appropriate warning / restriction signs been placed on the perimeter of the site.
-
8.2 Are there appropriate security controls in place to monitor the site access.
-
8.3 Is the traffic management plan being implemented.
-
8.4 Are there onsite storage facilities & are they secure.
-
8.5 Can the site be made secure when there is no work.
9.0 Electrical
-
9.3 Is there clear access to electrical panals & switchs.
-
9.4 Do temporary boards have RCDs / cutouts fitted.
-
9.5 Are electrical switch boards kept locked & unauthorized access prevented.
-
9.6 Double adapters are not being used.
-
9.8 Are electrical equipment and cord tagged & in date ( Review sample)
12. - Plant & Equipment
-
12.1 Have plant risk assessments been completed for plant used on site
-
12.2 Are inspections completed and recorded
-
12.3 Are machine guards correctly fitted and used.
-
12.4 Are emergency stops in place & clearly identified.
-
12.5 Is plant & Equipment tagged out and isolated during maintenance / repair.
13. Dangerous good / hazardous substances
-
13.1 Is the dangerous / hazardous goods register up to date.
-
13.2 Are all dangerous / hazardous goods clearly identified and stored correctly.
-
13.3 Are material safety data sheets (MSDS) available for all dangerous / hazardous substances.
15 Emergencies
-
15.1 Are emergency evacuation procedures posted in main work areas.
-
15.2 Is the emergency phone numbers clearly displayed.
-
15.3 Are fire extinguishers easily accessible & sign posted.
-
15.4 Have the fire extinguishers been inspected within the last six months. ( check tags)
-
15.5 Are sprinkler heads not obstructed ( 50cm clearance)
-
15.6 Are Exits clearly visible, clear of obstructions & easily opened from the inside.
-
15.7 Are Exit signs appropriately displayed & illuminated where necessary.
-
15.8 Is build up of combustible materials (boxes) kept to a minimum.
16. Incidents and First Aid
-
16.1 Are Incident report forms completed for each incident.
-
16.2 Are the details & contact numbers of First aid officers up to date & on noticeboards & are they available during work hours.
-
16.3 Are First Aid kits stocked & in date. (Review sample)
-
16.4 Do the employee's know where to access First Aid.
Sign Off
-
Total number of corrective actions identified.
-
Total number of outstanding actions ( not able to immediately rectify)
-
Corresponding INX Report number.
-
Signatures of inspection team.
-
Signatures of inspection team.
-
Select date
-
Signature of responsible manager
-
Select date