iAuditor Mobile App Preview

Audit

Sign in procedures for visitors/ contractors

All workers have Induction Card

Contact details for Principal Contractor available

Traffic Management Plan is being followed

Emergency plan contact details correct

Log books for plant / equipment completed

Plant operators have certification as required

SWMS available for high risk tasks

Perimeter protection suitable

Fall protection equipment as per SWMS

Electrical equipment in test date

Electrical leads not on ground

RCD Provided

MSDS available for chemicals

Is MSDS within 5 year issue date

PPE being worn by all persons on site as required

PPE Signage on site displayed and in good condition

Waste disposal in timely and safe manner

Dust suppression activities undertaken

Lighting adequate for tasks (including night works)

Lock out/tag out procedures in place

Toilet/ wash room / lunch room cleaned

Weekly report completed on
Person responsible to initial/sign

Safe Work Method Statements

Have SWMS been signed off by all personnel involved in the task?

Manufacturing Workplace Inspection Checklist

Created by: SafetyCulture Authorized | Industry: Manufacturing | Downloads: 3,632

This Manufacturing Workplace Inspection Checklist template can be used and modified to match a manufacturing shop floor safety inspection requirements.

Signup for a free iAuditor account to download and edit this checklist. It will be added to your free account and you will be able to conduct inspections from your mobile device.

Download and edit this free checklist

Browse for other checklists


iauditor logo

The World's #1 Cloud-Based Inspection Software and App

chevron logo
coles logo
emirates logo
overground logo
tesla logo
toyota logo

Audit

Sign in procedures for visitors/ contractors

All workers have Induction Card

Contact details for Principal Contractor available

Traffic Management Plan is being followed

Emergency plan contact details correct

Log books for plant / equipment completed

Plant operators have certification as required

SWMS available for high risk tasks

Perimeter protection suitable

Fall protection equipment as per SWMS

Electrical equipment in test date

Electrical leads not on ground

RCD Provided

MSDS available for chemicals

Is MSDS within 5 year issue date

PPE being worn by all persons on site as required

PPE Signage on site displayed and in good condition

Waste disposal in timely and safe manner

Dust suppression activities undertaken

Lighting adequate for tasks (including night works)

Lock out/tag out procedures in place

Toilet/ wash room / lunch room cleaned

Weekly report completed on
Person responsible to initial/sign

Safe Work Method Statements

Have SWMS been signed off by all personnel involved in the task?