Title Page
-
Application Number
-
On-maintenance Inspection
-
Site - Development Name
-
Conducted on
-
Consultant Engineer
-
Location
Inspection Items
Stormwater Drainage
-
Kerb and Channel
-
Reason for not signing off
-
Take photos of reasons
Landscaping
-
Landscaping planted as per approved plan
-
Plants are established and healthy
-
Take photo of reasons
Road pavement
-
Surface finish is in good condition
-
Take photo of failure/s
Verge
-
The verge drains to the kerb and channel
-
The verge is grassed as per condition/s
-
Add photos of any areas of concern
-
Verge has an even finish and free from depressions
-
Add photos of any areas of concern
Water Supply
-
Trenches have no settlement issues
-
Water testing has been completed
-
Pressure tests have passed
-
Water connection for each parcel clearly visible
-
Fire Hydrants marked and clearly visible
-
Add photos of any areas of concern
Sewerage System
-
Manhole clearly visible
-
Manhole grouting and finishing completed to spec
-
Take photos of reasons
-
Trenching shows no sign of subsidence
-
Add photo of any areas of concern
Street furniture
-
Signage installed as per plan
-
Street signage as per Council approval
Pathways
-
smooth transition between finished surface and verge
-
smooth transition between kerb and channel
-
Pathway finish free from failures
-
Add photo of any areas of concern
Sign off
-
All parties agree on the following actions
-
Further rectification is required to repair failures
-
Agreed to undertake repairs
-
All infrastructure meets the conditions of the approval and the development goes on-maintenance