Information

  • Branch Office

  • Project Number

  • Project Name

  • Project Manager

  • Foreman

  • Foreman Signature

  • Conducted on

  • Location
  • Crew Member Signature

  • Crew Member Signature

  • Crew Member Signature

  • Crew Member Signature

  • Weekly Toolbox Talk Complete

  • Toolbox Topic

  • Did the crew stretch before work began?

  • Did all Employees show up injury free?

  • Does everyone have all necessary PPE?

  • Have all equipment inspections been documented?

  • Aerial Lift (Boom Lift / Scissor Lift)

  • Forklifts

  • WSFP Vehicles

  • Yesterdays goals achieved?

  • Goals for today?

Safety Hazards:

  • Struck By

  • Slips / Trips / Falls

  • Strains / Sprains

  • Cuts / Lacerations

  • Flying Paricles

  • Lifts

  • Electrical

  • Fire

  • Water

  • Other Hazards:

Materials, Tools or Equipment Needed:

Hazard Controls:

  • PPE

  • Gloves

  • Earplugs

  • Lockout / Tag-out

  • GFCI

  • Fire Extinguisher

  • Fall Protection (Personal Fall Arrest System / Harness)

  • MSDS / SDS

  • Barricade

  • Sure-off Tester

  • Air Testing

  • Aerial Lift

  • Shoring / Shielding

  • Proper Lifting Technique

  • Isolation

  • Eye Protection above minimum requirements of Safety Glasses (Goggles, Face Shield, etc.)

  • Other Hazard Controls:

Production:

  • Impacts to Schedule (Design, Fabrication, Deliveries, Other Trades Issues)

  • Were there any injuries yesterday?

  • Were there any Near Misses or Saves?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.