Information
-
Branch Office
-
Project Number
-
Project Name
-
Project Manager
-
Foreman
-
Foreman Signature
-
Conducted on
-
Location
-
Crew Member Signature
-
Crew Member Signature
-
Crew Member Signature
-
Crew Member Signature
-
Weekly Toolbox Talk Complete
-
Toolbox Topic
-
Did the crew stretch before work began?
-
Did all Employees show up injury free?
-
Does everyone have all necessary PPE?
-
Have all equipment inspections been documented?
-
Aerial Lift (Boom Lift / Scissor Lift)
-
Forklifts
-
WSFP Vehicles
-
Yesterdays goals achieved?
-
Goals for today?
Safety Hazards:
-
Struck By
-
Slips / Trips / Falls
-
Strains / Sprains
-
Cuts / Lacerations
-
Flying Paricles
-
Lifts
-
Electrical
-
Fire
-
Water
-
Other Hazards:
Materials, Tools or Equipment Needed:
Hazard Controls:
-
PPE
-
Gloves
-
Earplugs
-
Lockout / Tag-out
-
GFCI
-
Fire Extinguisher
-
Fall Protection (Personal Fall Arrest System / Harness)
-
MSDS / SDS
-
Barricade
-
Sure-off Tester
-
Air Testing
-
Aerial Lift
-
Shoring / Shielding
-
Proper Lifting Technique
-
Isolation
-
Eye Protection above minimum requirements of Safety Glasses (Goggles, Face Shield, etc.)
-
Other Hazard Controls:
Production:
-
Impacts to Schedule (Design, Fabrication, Deliveries, Other Trades Issues)
-
Were there any injuries yesterday?
-
Were there any Near Misses or Saves?