Information

  • Project Name

  • Date Completed

  • Completed by

  • Location
  • Project Team Foreman, Superintendent, PM, Designer

Design

Design

  • Was field engaged for the design?<br>Superintendent, Foreman etc.

  • Was there a design turnover meeting?

  • Have we coordinated with other trades?

  • Is there an approved set of all trades coordination drawing?

  • Was there a design review?

  • Is the design complete and on time?

  • Are there critical details shown on plans?

  • Are pipes labeled / dimensions / elevations / typical pieces / etc.?

Fabrication

  • Does vendor have contract / PO with terms and conditions?

  • Is fabricator aware of our specifications and quality expectations?

  • Does the fabrication meet our quality expectations?

  • Is the fabrication on time?

  • Do we have a fabrication schedule?

  • Is pipe bundled by line color?

  • Is pre-fabrication being utilized?<br>Hangers, stands, etc.

Scheduling / Mobilization / Delivery

  • Do we have a schedule?

  • Does the current schedule match the bid documents schedule?

  • Can we meet the schedule?

  • Are we on schedule?

  • Do we have the required man-power available?

  • Was there a turnover meeting with field?

  • Did the foreman get a field packet?

  • Does foreman have all contact names and phone numbers?

  • Does the foreman understand the scope of work?

  • Have deliveries been schedule with GC?

  • Is there a plan for accepting deliveries?

  • Do we have a lay-down area?

  • Can we remain in this lay-down area for the duration of the projects?

  • Do we have carts / forklifts / cartage to accept material?

Installation

  • Is there a complete set of prints for the entire job?

  • Did a Daily Huddle occur before work began today?

  • Was the Daily Huddle documented?

  • Are carts, bins or racks being utilized?

  • Are the correct lifts being utilized?

  • Are the foreman and crew qualified?

  • Has the crew been trained in proper use of their tools?

  • Has the crew received the required safety training as it relates to the project? <br>Lift, OSHA, Confined Space, etc.

  • Are we following QC protocols and company policies?

  • Is the project being installed per the plans?

  • Are we running the project or is it running us?

  • Is the crew utilizing technology?

Project Management

  • Is Project Manager involved?

  • Has Project Manager completed regular KISS site safety audits?

  • Do we have the appropriate labor mix?

  • Does field have a phase sheet?

  • Does foreman know what the budgeted hours per head is?

  • Have the hours per head been compared to historical data?

  • Is crew setting daily and weekly production goals?

  • Do they meet or exceed the budget?

  • Are we performing monthly "Cost to Complete"?

  • Is foreman and PM tracking changes?

  • Are we current with all change order pricing?

  • Are we attending job meetings? Who attends?

Accountability

  • Is the crew and project safe?

  • Is WSFP and other trades housekeeping acceptable?

  • Is there a quality control plan?

  • Have we set expectations?

  • Are we inspecting what we expect?

  • Are we holding vendors and other trades accountable?

  • Are we pursuing back charges?

  • Does everyone on the project understand the WSFP Loss Prevention Policies and our Health & Safety Program?

Sister Branch Program

  • Is the sister branch program being utilized?

  • Has the program been illustrated to the branch superintendent?

  • Is the superintendent utilizing the minimum standards?<br>QAMM

  • How many qualify for the Incentive Program?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.