Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • NAME

  • ADDRESS
  • Contact No

  • Inspector

  • Signature

Installation Measure

  • INSTALLATION MEASURE

WORK IN PROGRESS INSPECTIONS - ALL MEASURES

  • QAA Date:

  • QAA Inspectors Name:

  • Detail the measure Being

  • Installed

  • Installer on site (1)

  • Installer on site (2)

  • Installer onsite [3]

  • installer on site [4]

  • Inspection Completed Details

  • Welfare facilities on site for EWI / IWI Installers

  • Time of inspection

  • Photographic Evidence

Risk Management Controls Inspector/ Operator/ Customer Safety

  • Have appropriate signs/notices been erected around the property - Fire assembly, Fist Aid Points etc

  • Ensure that cables and trailing leads are not trip hazards

  • Is the customer home - and in a safe zone

  • Is there a site entry/exit log in place?

  • Observation of Installers - PPE as required for measure being installed , No Smoking, Traffic Management

Risks Management

  • Do the operatives have a generic risk assessment and dynamic risk assessment - with a site specific materials and substances being used on the site

  • Is there an accident procedure on site / Accident Book / Are any of the installers first aid trained ?

  • Is there a fire risk assessment in place? Hot works permit?

  • Ladders - being used safely and tagged

Asbestos Management

  • Does the team have an asbestos procedure on site? NOTE: The asbestos survey is carried out prior to the required to follow the reporting procedure

Electrical Equipment

  • Check that low voltage tools and equipment are being used wherever possible, The WHS contract is specific around the use of 2400v tools being used during an installation, - NOTE Check that only 110v

  • CTE hand tool etc are in use

  • Check that tools and equipment are visually checked and regularly inspected/tested by a competent person

  • (PAT)

  • EWI ONLY

  • Ensure materials are stored in an appropriate manner so as not to cause damage to or a weakening of the material

  • Where the works affect telecom have the appropriate services been contacted?

  • Are insulation boards tightly butted together?

  • Are boards installed in an interlocking, half bond pattern?

  • Are all boards undamaged?

  • Have all gaps been sealed to prevent air path between the boards and wall?

  • Are all boards appropriately anchored and/or bonded?

  • Is the system/measure being installed inline with the manufacturers specification?

Welfare Facilities

  • Ensure a facility is provided to change, dry and store clothing

  • Ensure a supply of wholesome drinking water and cups are provided

Scaffolding / Working Platforms

  • Is there any scaffolding or working platforms on the site?

  • Check that any scaffold erection, alteration or dismantling is carried out by a competent person

  • Check that all standards are provided with base plates and timber sole boards which span at least two base plates

  • Check that working platforms are fully boarded and that the boards are arranged to avoid tipping or tripping - i.e.: no overlapping boards

  • Do all ladder accesses have self closing gates fitted?

  • Are scaffold tags being utilised?

  • Company ID

  • Competency Card - Skill/Number/ Expiry Date

  • Name

  • Lead Engineer on site

  • Operator

  • Operator

  • Operator

  • Operator

SIGNATURES

  • COMPANY

  • INSTALLER NAME

  • INSTALLER SIGNATURE

  • INSPECTOR NAME

  • INSPECTOR SIGNATURE

Supporting Photos

  • Add media

Inspector Comments

  • undefined

PASS/PASSADVISORY/FAIL

  • undefined

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.