Title Page
-
Site conducted
-
Conducted on
-
Prepared by
- JAMES MC ALLISTER
-
Location
-
NAME
-
ADDRESS
-
Contact No
-
Inspector
- JAMES MC ALLISTER
-
Signature
Installation Measure
-
INSTALLATION MEASURE
- NG GAS
- LPG
- OIL
- ASHP
- SOLID FULE
- WINDOWS & DOORS
- CAVITY WALL
- EWI
- LOFT
- ELECTRIC STORAGE
- ELECTRIC STORAGE
WORK IN PROGRESS INSPECTIONS - ALL MEASURES
-
QAA Date:
-
QAA Inspectors Name:
-
Detail the measure Being
- GAS CENTRAL HEATING
- BOILER CHANGE
- EWI
- CAVITY WALL
- UNDER FLOOR
- LOFT INSULATION
- ELECTRIC STORAGE
- BOILER + 2 RADIATORS
-
Installed
- YES
- NO
- WIP
-
Installer on site (1)
-
Installer on site (2)
-
Installer onsite [3]
-
installer on site [4]
-
Inspection Completed Details
-
Welfare facilities on site for EWI / IWI Installers
-
Time of inspection
-
Photographic Evidence
Risk Management Controls Inspector/ Operator/ Customer Safety
-
Have appropriate signs/notices been erected around the property - Fire assembly, Fist Aid Points etc
-
Ensure that cables and trailing leads are not trip hazards
-
Is the customer home - and in a safe zone
-
Is there a site entry/exit log in place?
-
Observation of Installers - PPE as required for measure being installed , No Smoking, Traffic Management
Risks Management
-
Do the operatives have a generic risk assessment and dynamic risk assessment - with a site specific materials and substances being used on the site
-
Is there an accident procedure on site / Accident Book / Are any of the installers first aid trained ?
-
Is there a fire risk assessment in place? Hot works permit?
-
Ladders - being used safely and tagged
Asbestos Management
-
Does the team have an asbestos procedure on site? NOTE: The asbestos survey is carried out prior to the required to follow the reporting procedure
Electrical Equipment
-
Check that low voltage tools and equipment are being used wherever possible, The WHS contract is specific around the use of 2400v tools being used during an installation, - NOTE Check that only 110v
-
CTE hand tool etc are in use
-
Check that tools and equipment are visually checked and regularly inspected/tested by a competent person
-
(PAT)
-
EWI ONLY
-
Ensure materials are stored in an appropriate manner so as not to cause damage to or a weakening of the material
-
Where the works affect telecom have the appropriate services been contacted?
-
Are insulation boards tightly butted together?
-
Are boards installed in an interlocking, half bond pattern?
-
Are all boards undamaged?
-
Have all gaps been sealed to prevent air path between the boards and wall?
-
Are all boards appropriately anchored and/or bonded?
-
Is the system/measure being installed inline with the manufacturers specification?
Welfare Facilities
-
Ensure a facility is provided to change, dry and store clothing
-
Ensure a supply of wholesome drinking water and cups are provided
Scaffolding / Working Platforms
-
Is there any scaffolding or working platforms on the site?
-
Check that any scaffold erection, alteration or dismantling is carried out by a competent person
-
Check that all standards are provided with base plates and timber sole boards which span at least two base plates
-
Check that working platforms are fully boarded and that the boards are arranged to avoid tipping or tripping - i.e.: no overlapping boards
-
Do all ladder accesses have self closing gates fitted?
-
Are scaffold tags being utilised?
-
Company ID
-
Competency Card - Skill/Number/ Expiry Date
-
Name
-
Lead Engineer on site
-
Operator
-
Operator
-
Operator
-
Operator
SIGNATURES
-
COMPANY
- EVERWARM
- BRB
- TK MURRAY
- CMBS
- ALBA GAS
- MC INNESS GROUP
- SOUYHEAST HEATING SERVICES LTD
- IRS
-
INSTALLER NAME
-
INSTALLER SIGNATURE
-
INSPECTOR NAME
-
INSPECTOR SIGNATURE
Supporting Photos
-
Add media
Inspector Comments
-
undefined
PASS/PASSADVISORY/FAIL
-
undefined
- PASS
- FAIL