Title Page
-
Site /project Location
-
Principal Contractor
-
Conducted on
-
Prepared by
-
Principle Contractor representative on site.
-
Other personnel
Site set up and compliance
Site set up, Statutory Notices, Security and Facilities.
-
Site entrance H&S notices
-
Add media
-
Comments
-
Site security, was access controlled?
-
Add media
-
Comments
-
Are all facilities well sign posted and safely accessible?
-
Add media
-
Comments
-
Are the WC facilities suitable for the amount of contractors on site?
-
Add media
-
Comments
-
Is there a suitable first aid station on site?
-
Add media
Statutory documentation.
-
Is there a current F10 Displayed on site?
-
Copy of notice
-
Comments
-
Employers liability insurance
-
Add media
-
Comments (expiry date min.)
-
Is the Construction phase health and safety plan on site?
-
Add media
-
Comments (revision)
-
Health and safety policy statement
-
Add media
-
Comments
-
Health and safety at work act. 1974
-
Add media
-
Comments
Site specific information.
-
Site rules
-
Add media
-
Comments
-
Site programme.
-
Add media
-
Comments (expected completion date and revision)
-
Emergency plan
-
Add media
-
Comments
-
Traffic management plan
-
Add media
-
Comments
-
Waste management plan
-
Add media
-
Comments
-
Accident record book
-
Add media
-
Design Risk Register
-
Add media
Register of inspections, inductions and monitoring
Statutory registers.
-
A sample inspection of each of the following should be assessed
-
Register of inductions (all site personnel)
-
Add media
-
Comments
-
Site personnel competency register (cscs etc.)
-
Add media
-
Comments
-
LOLER. (Lifting Operations & Lifting Equipment Regulations)
-
Add media
-
Comments
-
PUWER. (Provision & Use of Work Equipment Regulations)
-
Add media
-
Comments
-
Register of inspections (excavations)
-
Add media
-
Comments
-
Register of inspections (scaffolding)
-
Add media
-
Comments
-
Accident and near miss Register
-
Add media
-
Comments
-
Toolbox talk Register
-
Add media
-
Comments
-
COSHH Register (Control of Substances Hazardous to Health)
-
Add media
-
Comments
-
Risk assessment register or register of contractors and associated RAMS
- Yes
- No
- At Risk
-
Add media
-
Register of approvels (RAMS) . Are the design risks covered?
-
Add media
-
Permit to Work register.
-
Add media
-
Comments
-
Site safety inspections (site managers)
-
Add media
-
Comments
-
Any external site safety inspections (HSE or other)?
-
Add media
-
Comments
General comments / management issues
General comments / management issues
-
Was the site adequately secured to prevent unauthorised access?
-
We're you properly inducted on arrival / were you escorted around the site
-
Generally was the site perceived to be in good order? (Please note any breaches of regulations observed during the visit)
-
Was the construction phase plan updated (removal of all referances to the cdm 2007)
-
Does the employer engage with their employees?
-
As far as Is practical is everything being done to eliminate/reduce risk on site? Please note any recommendations
-
Add media
Audit completion
-
Time of completion.
-
Site manager comments
-
Site manager's signature
-
CDM advisor to the client, signature
-
Note: this form summarises the principle designers (or h&s advisor's) assessment (on behalf of the client) of whether the construction phase plan for the project and related health and safety procedures are being implimented. It does not represent a site inspection or an audit of the principle contractor.