Information
-
Unplanned Initiation and/or Impact
-
Conducted on:
-
Auditor:
-
Person being Audited:
Blast Clearance and Exclusion Zone
-
Are you familiar with who the Blast Controller is to manage the Blasting clearing process?
-
Have you got a copy of the blast clearance map?
-
Have you physically checked the blast area for personnel and vehicles?
-
Has the blast area been secured with blast guards and physical barriers?
-
Has all blasting equipment been checked for safety and serviceability prior to use?
Hot Reactive Ground
-
Have you identified, assessed and communicated any potential for or location of hot/reactive ground?
-
Have temperature loggers been used to measure hazardous holes and results recorded?
-
Have you ensured that maximum sleep times for potential hot or reactive ground areas are not exceeded?
Misfire Management
-
Have all misfires been recorded in the misfire record book and reported to the Quarry Manager?
-
Are you familiar with your requirements when identifying a misfire?
Training and Competency
-
Do you have the required licences, qualifications and appointments to perform this task?
-
Additional comments/observation
Observation
-
Add observations/comments here.
Signatures
-
I hereby certify that all information is accurate and that an actual inspection was conducted.
-
Auditor's Printed Name & Signature