  • YEARLY LOCKOUT / TAG OUT [LO/TO] PROCEDURE AUDIT CERTIFICATE

  • FACILITY

  • Conducted on

  • Prepared by

  • Location
  • Instructions
    USE FOR YEARLY AUDIT OF LOCK OUT / TAG OUT PROCEDURES
    1. Answer "Yes", "No", "N/A" for the questions below
    2. Add any photos and notes by clicking on the paperclip icon
    3. To create a corrective action click on the paperclip icon then "Action", provide a description, assign to a member, set priority and due date
    4. Complete audit by providing digital signature
    5. Share your report by exporting as PDF, Word, Excel or Web Link

PROCESS

  • FULLY REVIEW THE LOTO PROCEDURE AND INSPECT ALL LOTO EQUIPMENT AND MATERIALS TO INSURE THAT THEY ARE UP TO DATE AND ARE BEING FOLLOWED TO THE LETTER!

  • The Lock Out - Tag Out process is systematically applied when working on energized equipment

  • There is evidence / examples of recent LOTO

  • LOTO Procedure is well understood by Managers and Supervisors

  • LOTO Procedure is well understood by the crewmembers

  • A list of activities subjected to LOTO is visibly posted, the personnel are aware and understand the list

  • All LOTO certificates are formally authorized by the Person In Charge [ TRAINER ]

  • ALL Contractors are informed of and follow the proper LOTO procedure

  • A up to date list of all LOTO trained workers is always available

LOTO DEVICES

  • LOTO equipment (board) is readily available at all times? General conditions (how many, where, etc)

  • Check LOTO records to insure the program is being followed at all times

  • Tags are waterproof to prevent tag from deteriorating or becoming illegible due to wet conditions

  • Tags / Locks include legend such as Do Not Start, Do Not Open, Do Not Close, Do Not Energize, Do Not Operate

  • Plug bags or other locking devices are readily available along with proper locks etc.

  • A sufficient amount of the necessary LOTO devices are readily available

  • Check to insure every piece of electrical and pneumatic equipment at this facility can be properly isolated from all power sources!

TRAINING

  • Insure all personnel know the purpose and the use of the LOTO procedure

  • ALL PERSONNEL ARE TRAINED IN PROPER LOCK OUT PROCEDURE AND KNOW NEVER TO WORK ON A MACHINE THAT HAS NOT BEEN PROPERLY LOCKED OUT!

  • Energy isolation incidents / lessons learned are commonly distributed to employees

  • All personnel are familiar with the LOTO checklists and proper records are kept

  • Personnel recognize all type of energy sources requiring isolation through LOTO

Other Observations

  • List any changes needed to procedures, record keeping, equipment etc. needed?

  • Additional comments

  • Add relevant photos

Sign-off

  • A yearly audit of the LOTO procedures for this facility has been conducted on the following date

  • Select date

  • Auditor

  • Site Manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.