Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Pre Audit Start Up
-
Audit Start Time
-
Last period Auditor:
-
Issues raised from last audit period
Packaging
-
Paint on the units is dry, well applied and free of streaks, smears and drips
-
Units being packaged match the work orders and packing slips
-
Covers and name plates are properly attached, screws completely tightened, and free of bends, scratches, chips and paint residue.
-
Proper paperwork is packaged with the product
-
Product is fastened to the crate properly
-
Notes (Gaps):
Painting
-
Paint coverage is uniform and consistent across all surfaces.
-
Name plates, motor mounts, and covers are free from paint and over-spray.
-
Notes (Gaps):
Testing
-
Upon arrival was a unit being tested (if yes record unit serial number)
-
Reasons for Failures
-
Evidence can be shown that sampling adheres to GBT 2828
-
Failed pumps can be traced back to production lot from which it was produced
-
Status of untested pumps in current batch
-
Notes (Gaps):
Rework Queue
-
Causes for each rework unit have been identified
-
There is a specific action item owner for each rework unit
Assembly
-
Work instructions are visibly posted and followed
-
Full time QA is present in the cell and can show evidence of continuing inspections.
-
Root Causes for over / under achievement documented and understood
-
Yellow cards are completed properly in sync with the current operation
-
Notes (Gaps):
Material Kitting
-
Kits are complete to include impellers and motors
-
There is only one kit to a square ( no multiples / batching)
-
QA can provide evidence that current day's kits have been inspected
-
Notes:
Audit Period Results
-
Notes (Gaps / Defects):
Total Delinquency number
-
Time Relieved by next Auditor
-
Signature: