Title Page
-
Site conducted on ?
-
Location ?
-
Prepared by ?
-
Is the site supervisor present ?
-
Name of supervisor ?
Client infomashion
-
Client Name ?
-
Client Address ?
-
Client Telephone ?
-
Client site contact name ?
-
Client site contact number ?
Site Information
-
Description of works to be undertaken ?
-
No. of staff needed to carry out the works ?
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- Other
-
Proposed Start date if known ?
-
Estimated duration of works ?
-
Daily working hours ?
-
Involves weekend work ?
-
What weekend working is needed ?
-
Daily working hours ?
-
Daily working hours ?
-
Daily working hours Saturday ?
-
Daily working hours Sunday ?
Principal Contractor Information
-
Who will be the principal contractor ?
-
Company Name ?
-
Contact Name ?
-
Telephone ?
-
Mobile ?
Site Planning
-
Equipment list specialist equipment need ?
Safety requirements / Access equipment needed ?
-
Podium Steps ?
-
What is the working platform hight ?
-
Scissor Lift ?
-
What size is needed ?
-
Cherry Picker ?
-
What size is needed ?
-
Mobile Scaffold ?
-
What size is needed ?
-
Fixed Scaffold ?
-
What size is needed ?
-
Ladders/Step ladders ?
-
What size is needed ?
-
Other (Please state) ?
Emergency Arrangement Details:
-
Firefighting equipment needed ?
-
Means of raising alarm needed ?
-
Other known fire risks ?
-
What are they ?
-
Fire muster point where will it be ?
-
First aid provision ?
DCU setup: SOP007 & SOP010
-
Is a DCU to be used ?
Welfare facilities: Toilet, Washing and Rest Facilities:
-
Provided by:
-
Location(s) ?
-
Toilets ?
-
Means of drying hands ?
-
Hot & Cold running water ?
-
Seating (rest) area ?
-
Soap or washing agent ?
-
Means of heating food or drinks ?
-
Sanitising gel ?
-
Other (please state) ?
-
Location(s) ?
-
Toilets ?
-
Means of drying hands ?
-
Hot & Cold running water ?
-
Seating (rest) area ?
-
Soap or washing agent ?
-
Means of heating food or drinks ?
-
Sanitising gel ?
-
Other (please state) ?
-
Location(s) ?
-
Toilets ?
-
Means of drying hands ?
-
Hot & Cold running water ?
-
Seating (rest) area ?
-
Soap or washing agent ?
-
Means of heating food or drinks ?
-
Sanitising gel ?
-
Other (please state) ?
-
Who will be providing Welfare ?
-
Location(s) ?
-
Toilets ?
-
Means of drying hands ?
-
Hot & Cold running water ?
-
Seating (rest) area ?
-
Soap or washing agent ?
-
Means of heating food or drinks ?
-
Sanitising gel ?
-
Other (please state) ?
Waste disposal: SOP054
-
Amount of waste:
-
Waste Container
- Enclosed Skip
- Box within the van
- Open Skip for AC waste only
Isolation of services:
-
To be undertaken by:
-
Power ?
-
Gas ?
-
Water ?
-
Other:
Enclosure Information
-
A summary of work being undertaken on ACM’s in this area:
-
Building Number/Name & Area Number ?
-
Internal/External:
-
Floor:
- Basment
- Ground
- 1st Floor
- 2nd Floor
- 3rd Floor
- 4th Floor
- Other
-
What floor ?
-
Room:
-
Asbestos Work: LW / NLW / NNLW
-
What ?
-
Works to be caried out within ?
-
Removal:
-
Repair:
-
Encapsulate:
-
Paint:
-
Drill:
-
Reinstatement:
-
Provide details of reinstatement needed ?
-
Other (please specify):
Enclosure details
-
Enclosure Dimensions (Allow for any floor or ceiling voids as needed)
- Enclosure Dimensions have been marked on the Survey floor Plan
- Enclosure Dimensions are
-
Airlock ?
-
Baglock ?
-
Provide explanation why a baglock can’t be used ?
-
Air in let pods ?
-
Will a roving head's be needed ?
-
How many Lm ?
-
How many bends ?
-
Will exhaust ducting be needed
-
How many Lm ?
-
How many bends ?
Enclosure Construction
-
Timber batons:
-
Type of polythene:
-
Double skinned:
-
Fixed Scaffold:
-
Provied more details ?
-
CCTV to be placed in enclosure:
-
Are vision panels to be used:
ACM details:
-
Material
-
Extent (m2 or lm)
-
Surface (e.g. wall, pipework, boxed riser, etc.)
- Wall
- Ceiling
- Floor
- Duct
- Pipework
- Boxed riser
- Other
-
What ?
-
Condition
-
Method of attachment
- Nailed
- Screwed
- Bolted
- Metal banded
- Other
- Shuttering
-
What ?
-
Type of asbestos fibre
-
What ?
-
Survey Reference ?
Transit / Waste Route Description/distances (focusing on areas difficult to draw):
-
Transit route description & how long is it ?
-
Waste route description & how long is it ?
DCU setup: SOP007 & SOP010
-
Is a DCU to be used ?
-
Type of DCU to be used ?
-
Direct Connect ?
-
DCU to be positioned ?
-
Water for DCU to be obtained from ?
-
Power for DCU to be obtained from ?
-
Self-contained water tank to be used ?
-
Site water supply locashion ?
-
Waste discharge disposed of via ?
-
Distance to foul drain in Lm?
Photos
-
ACM photos ?
-
Air & Bag locks ?
-
Transit & waste route ?
-
NPU ?
-
NPU exhaust ?
-
Power ?
-
Skip ?
-
DCU ?
-
Wastewater ?
-
Water ?
-
Other ?
Sign Off
-
Asbestos Manager
-
Asbestos Supervisor if Present