Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Cleaning List
-
Fryers- thoroughly clean exterior/interior surfaces. Clean fan guard
-
Select date
-
Add signature
-
Ice Bins- empty and clean
-
Select date
-
Add signature
-
C.A.R.E.S Card Box- clean
-
Select date
-
Add signature
-
Cow- clean cow costume
-
Select date
-
Add signature
-
Bun Trays- scrub and pressure spray all red bun trays
-
Select date
-
Add signature
-
Lemon Oil- wipe down all black surfaces & scholarship plaque with oil
-
Select date
-
Add signature
Maintenance
Maintenance
-
Taylor- replace gaskets on ice dream freezer "tune-up kit" (and white blades) & check belts on freezer for proper tension (tech bull. EQ-TA-10)
-
Select date
-
Add signature
-
Utensils- make sure all utensils are in good repair
-
Select date
-
Add signature
-
Sinks- check all sinks for drips- replace washers when necessary
-
Select date
-
Add signature
-
Slicers- check all slicer blades for taughtness (tomato, lettuce, chicken) and carrot shedder or sharpness
-
Select date
-
Add signature
-
Mixer- check lubricate slide assembly and clean food mixer
-
Select date
-
Add signature
-
Hand Truck- lubricate handle arms on truck
-
Select date
-
Add signature
-
C02- verify pressure regulator setting in C02
-
Select date
-
Add signature
-
Temps- check and calibrate cooking equipment thermostats (hennys warming, drawers, tea, and coffee makers)
-
Select date
-
Add signature
-
Registers- clean registers thoroughly by taking the system apart and dusting off the fan blades
-
Select date
-
Add signature
-
(Outside Vendor)- Exhaust- vent-a-hood exhaust fans should be cleaned (only 2-3 times per year if sales only at 1 mil.)
-
Select date
-
Add signature
-
(Outside Vendor)- Exhaust- check vent-a-hood exhaust fan belts for proper tension
-
Select date
-
Add signature
-
(Outside Vendor)- grease trap pumping- march, June, September, December, Mekton Tech. Should pump the grease trap
-
Select date
-
Add signature