Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Legend
-
Compliant - Completed, no problems found
-
Non-compliant - Completed, problems noted & repairs required
-
Rectified - Completed, problems corrected
-
Incomplete - Unable to perform inspection or additional work to be done.
General
-
Banlaw Job Number:
-
Order Number:
-
Work started
-
Work completed
Rail Wagon Unloading - Bay 1
-
01-Area clean and tidy
-
Add media
-
Add drawing
-
02-Check environment - rag bins, spill kit, eye wash etc
-
Add media
-
Add drawing
-
03-Check signage - missing, damaged or incomplete
-
Add media
-
Add drawing
-
04-Banlaw Depot - Inspection per inspection sheet
-
Add media
-
Add drawing
-
05-Wipe down FMS enclosure
-
Add media
-
Add drawing
-
06-Inspect all cables and conduits for damage and ingress (incl earth cables)
-
Add media
-
Add drawing
-
07-Inspect and test flow meter, pulser and interfaces
-
Add media
-
Add drawing
-
08-Inspect temperature probe for damage & leaks
-
Add media
-
Add drawing
-
09-Function check pump station (start, stop, E stop, Reset main isolator after test)
-
Add media
-
Add drawing
-
10-Inspect flow meter for physical damage
-
Add media
-
Add drawing
-
11-Inspect manual ball valve operation
-
Add media
-
Add drawing
-
12-Inspect air activated valve operation
-
Add media
-
Add drawing
-
13-Inspect pump
-
Add media
-
Add drawing
-
14-Inspect motor
-
Add media
-
Add drawing
-
15-Check flow rate and record
-
Add media
-
Add drawing
-
16-Inspect API load arm
-
Add media
-
Add drawing
-
17-Inspect nozzle holster for damage
-
Add media
-
Add drawing
-
18-Inspect pressure relief for leaks and damage
-
Add media
-
Add drawing
-
19-Inspect pump strainer
-
Add media
-
Add drawing
-
20-Inspect pipe work and brackets for damage and wear
-
Add media
-
Add drawing
-
21-Inspect air eliminator
-
Add media
-
Add drawing
-
22-Inspect CLAL-Valve
-
Add media
-
Add drawing
-
23-Inspect non-return valve
-
Add media
-
Add drawing
-
24-Inspect flow switch
-
Add media
-
Add drawing
-
26-Grease nipples in loading arm or hose reel (quarterly)
-
Add media
-
Add drawing
-
27-Calibrate meter(s) (1/2 yearly)
-
Add media
-
Add drawing
Rail Wagon Unloading - Bay 2
-
01-Area clean and tidy
-
Add media
-
Add drawing
-
02-Check environment - rag bins, spill kit, eye wash etc
-
Add media
-
Add drawing
-
03-Check signage - missing, damaged or incomplete
-
Add media
-
Add drawing
-
04-Banlaw Depot - Inspection per inspection sheet
-
Add media
-
Add drawing
-
05-Wipe down FMS enclosure
-
Add media
-
Add drawing
-
06-Inspect all cables and conduits for damage and ingress (incl earth cables)
-
Add media
-
Add drawing
-
07-Inspect and test flow meter, pulser and interfaces
-
Add media
-
Add drawing
-
08-Inspect temperature probe for damage & leaks
-
Add media
-
Add drawing
-
09-Function check pump station (start, stop, E stop, Reset main isolator after test)
-
Add media
-
Add drawing
-
10-Inspect flow meter for physical damage
-
Add media
-
Add drawing
-
11-Inspect manual ball valve operation
-
Add media
-
Add drawing
-
12-Inspect air activated valve operation
-
Add media
-
Add drawing
-
13-Inspect pump
-
Add media
-
Add drawing
-
14-Inspect motor
-
Add media
-
Add drawing
-
15-Check flow rate and record
-
Add media
-
Add drawing
-
16-Inspect API load arm
-
Add media
-
Add drawing
-
17-Inspect nozzle holster for damage
-
Add media
-
Add drawing
-
18-Inspect pressure relief for leaks and damage
-
Add media
-
Add drawing
-
19-Inspect pump strainer
-
Add media
-
Add drawing
-
20-Inspect pipe work and brackets for damage and wear
-
Add media
-
Add drawing
-
21-Inspect air eliminator
-
Add media
-
Add drawing
-
22-Inspect CLAL-Valve
-
Add media
-
Add drawing
-
23-Inspect non-return valve
-
Add media
-
Add drawing
-
24-Inspect flow switch
-
Add media
-
Add drawing
-
26-Grease nipples in loading arm or hose reel (quarterly)
-
Add media
-
Add drawing
-
27-Calibrate meter(s) (1/2 yearly)
-
Add media
-
Add drawing
Rail Wagon Unloading - Bay 3
-
01-Area clean and tidy
-
Add media
-
Add drawing
-
02-Check environment - rag bins, spill kit, eye wash etc
-
Add media
-
Add drawing
-
03-Check signage - missing, damaged or incomplete
-
Add media
-
Add drawing
-
04-Banlaw Depot - Inspection per inspection sheet
-
Add media
-
Add drawing
-
05-Wipe down FMS enclosure
-
Add media
-
Add drawing
-
06-Inspect all cables and conduits for damage and ingress (incl earth cables)
-
Add media
-
Add drawing
-
07-Inspect and test flow meter, pulser and interfaces
-
Add media
-
Add drawing
-
08-Inspect temperature probe for damage & leaks
-
Add media
-
Add drawing
-
09-Function check pump station (start, stop, E stop, Reset main isolator after test)
-
Add media
-
Add drawing
-
10-Inspect flow meter for physical damage
-
Add media
-
Add drawing
-
11-Inspect manual ball valve operation
-
Add media
-
Add drawing
-
12-Inspect air activated valve operation
-
Add media
-
Add drawing
-
13-Inspect pump
-
Add media
-
Add drawing
-
14-Inspect motor
-
Add media
-
Add drawing
-
15-Check flow rate and record
-
Add media
-
Add drawing
-
16-Inspect API load arm
-
Add media
-
Add drawing
-
17-Inspect nozzle holster for damage
-
Add media
-
Add drawing
-
18-Inspect pressure relief for leaks and damage
-
Add media
-
Add drawing
-
19-Inspect pump strainer
-
Add media
-
Add drawing
-
20-Inspect pipe work and brackets for damage and wear
-
Add media
-
Add drawing
-
21-Inspect air eliminator
-
Add media
-
Add drawing
-
22-Inspect CLAL-Valve
-
Add media
-
Add drawing
-
23-Inspect non-return valve
-
Add media
-
Add drawing
-
24-Inspect flow switch
-
Add media
-
Add drawing
-
26-Grease nipples in loading arm or hose reel (quarterly)
-
Add media
-
Add drawing
-
27-Calibrate meter(s) (1/2 yearly)
-
Add media
-
Add drawing
Oily Water Separator System
-
All sump pumps working
- Compliant
- Non-compliant
- Rectified
- Incomplete
-
Add media
-
Add drawing
-
Check Air Pump for operation
- Compliant
- Non-compliant
- Rectified
- Incomplete
-
Add media
-
Add drawing
-
Check level floats for operation
-
Add media
-
Add drawing
-
Check strainer
- Compliant
- Non-compliant
- Rectified
- Incomplete
-
Add media
-
Add drawing
-
Check valve operation
- Compliant
- Non-compliant
- Rectified
- Incomplete
-
Add media
-
Add drawing
-
Check level of grey water tank (if full let supervisor know to empty)
- Compliant
- Non-compliant
- Rectified
- Incomplete
-
Add media
-
Add drawing
Issues & remarks
-
Inspection Comments
-
Recommendations
Signoff
-
Inspected by
-
Inspected by
-
Inspected by
-
Approved by
-
NOTE: All non-compliant results will followed up by Banlaw Service. Work required will be quoted then submitted for review, approval and scheduling.