Fire Extinguishers

FIRE EXTINGUISHERS
Basement

01 Oil Tank Room Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

02 Oil Thank Room Powder 6 Kg

Is the seal and pin in place?

Is the annual inspection in date?

03 Transformer Room Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

04 Transformer Room Co2 5 Kg

Is the seal and pin in place?

Is the annual inspection in date?

05 AHU Room Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

06 AHU Room Co2 5Kg

Is the seal and pin in place?

Is the annual inspection in date?

07 Heating Plant Room Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

08 Heating Plant Room Co2 5Kg

Is the seal and pin in place?

Is the annual inspection in date?

09 Gas Meter Room Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

10 Gas Meter Room Powder 6Kg

Is the seal and pin in place?

Is the annual inspection in date?

11 LV Switch Room Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

12 LV Switch Room Co2 5Kg

Is the seal and pin in place?

Is the annual inspection in date?

13 Sub Station Room Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

14 Sub Station Room Co2 5Kg

Is the seal and pin in place?

Is the annual inspection in date?

15 Switchgear Room Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

16 Switchgear Room Co2 5Kg

Is the seal and pin in place?

Is the annual inspection in date?

17 Car Park Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

18 Car Park Co2 5Kg

Is the seal and pin in place?

Is the annual inspection in date?

19 Car Park Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

20 Car Park Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

21 Loading Bay Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

22 Loading Bay Co2 5Kg

Is the seal and pin in place?

Is the annual inspection in date?

23 Loading Bay Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

24 Loading Bay Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

25 L/Bay Dock Office Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

26 L/Bay Dock Office Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

27 Core 1 Stairs Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

28 Core 1 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

29 Core 2 Stairs Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

30 Core 2 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

31 Core 3 Stairs Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

32 Core 3 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

Ground

33 Reception Front Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

34 Reception Front Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

35 Atrium Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

36 Atrium Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

37 Fire Command Centre Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

38 Fire Command Centre Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

39 Core 1 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

40 Core 1 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

41 Core 2 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

42 Core 2 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

43 Core 3 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

44 Core 3 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

44A Main Core Corridor Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

44B Main Core Corridor CO2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

45 East Fire Exit Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

47 West Fire Exit Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

48 West Fire Exit Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

49 Plant Room Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

50 Plant Room Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

1st Foor

51 Core 1 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

52 Core 1 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

53 Core 2 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

54 Core 2 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

55 Core 3 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

56 Core 3 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

2nd Floor

57 Core 1 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

58 Core 1 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

59 Core 2 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

60 Core 2 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

61 Core 3 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

62 Core 3 Stair Foam CO2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

3rd Floor

63 Core 1 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

64 Core 1 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

65 Core 2 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

66 Core 2 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

67 Core 3 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

68 Core 3 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

4th Floor

69 Core 1 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

70 Core 1 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

71 Core 2 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

72 Core 2 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

73 Core 3 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

74 Core 3 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

5th Floor

75 Core 1 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

76 Core 1 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

77 Core 2 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

78 Core 2 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

79 Core 3 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

80 Core 3 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

6th Floor

81 Core 1 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

82 Core 1 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

83 Core 2 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

84 Core 2 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

85 Core 3 Stair Foam 9 Litre

Is the seal and pin in place?

Is the annual inspection in date?

86 Core 3 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

7th Floor

87 Core 1 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

88 Core 1 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

89 Core 2 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

90 Core 2 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

91 Core 3 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

92 Core 3 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

8th Floor

93 Core 1 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

94 Core 1 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

95 Core 2 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

96 Core 2 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

97 Core 3 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

98 Core 3 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

9th Floor

99 Core 1 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

100 Core 1 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

101 Core 2 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

102 Core 2 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

103 Core 3 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

104 Core 3 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

10th Floor

105 Core 1 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

106 Core 1 Stairs Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

107 Core 3 Stair Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

108 Core 3 Stairs Co2 5Kg

Is the seal and pin in place?

Is the annual inspection in date?

109 Atrium Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

110 Atrium Co2 5Kg

Is the seal and pin in place?

Is the annual inspection in date?

111 Artium Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

112 Atrium Co2 5Kg

Is the seal and pin in place?

Is the annual inspection in date?

113 Plant Room Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

114 Plant Room Co2 5Kg

Is the seal and pin in place?

Is the annual inspection in date?

115 Lift Lobby Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

116 Lift Lobby Co2 5Kg

Is the seal and pin in place?

Is the annual inspection in date?

117 Plant Room 2 Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

118 Plant Room 2 Co2 5Kg

Is the seal and pin in place?

Is the annual inspection in date?

119 Plant Room 3 Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

120 Plant Room 3 Co2 5Kg

Is the seal and pin in place?

Is the annual inspection in date?

Roof

121 Plant Cabinet 1 Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

122 Roof Cabinet 1 Co2 5Kg

Is the seal and pin in place?

Is the annual inspection in date?

123 Roof Cabinet 2 Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

124 Roof Cabinet 2 Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

125 Roof Cabinet 3 Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

126 Roof Cabinet 3 Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

127 Roof Cabinet 4 Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

128 Roof Cabinet 4 Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

129 Roof Cabinet 5 Foam 6 Litre

Is the seal and pin in place?

Is the annual inspection in date?

130 Roof Cabinet 5 CO2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

131 LV Switch Room 1 Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

132 LV Switch Room 2 Co2 2Kg

Is the seal and pin in place?

Is the annual inspection in date?

Add signature

Fire Telephones & Emergency Call Point Check

Core 1
10th Floor Core 1

9th Floor Core 1

8th Floor Core 1

7th Floor Core 1

6th Floor Core 1

5th Floor Core 1

4th Floor Core 1

3rd Floor Core 1

2nd Floor Core 1

1st Floor Core 1

Ground Floor Core 1

Basement Floor Core 1

Core 2
10th Floor Core 2

9th Floor Core 2

8th Floor Core 2

7th Floor Core 2

6th Floor Core 2

5th Floor Core 2

4th Floor Core 2

5th Floor Core 2

4th Floor Core 2

3rd Floor Core 2

2nd Floor Core 2

1st Floor Core 2

Ground Floor Core 2

Basement Floor Core 2

Core 3
10th Floor Core 3

9th Floor Core 3

8th Floor Core 3

7th Floor Core 3

6th Floor Core 3

5th Floor Core 3

4th Floor Core 3

3d Floor Core 3

2nd Floor Core 3

1st Floor Core 3

Ground Floor Core 3

Basement Floor Core 3

Add signature

Eye Wash Sets

Basement AHU/ Pump Room

Eyewash 2 x 500ml, 10 x 1ml

Eye Pod Dressing x 1

Napkins x 1

Basement Water Tank Room

Eyewash 2 x 500ml, 10 x 1ml

Eye Pod Dressing x 1

Napkins x 1

Basement Heating Plant Room

Eyewash 2 x 500ml, 1

Basement Oil Tank Room

Eyewash 2 x 500ml, 10 x 1ml

Eye Pod Dressing x 1

Napkins x 1

Basement Sprinkler Tank Room

Eyewash 2 x 500ml, 10 x 1ml

Eye Pod Dressing x 1

Napkins x 1

Basement Car Park Rain Attenuator (Irrigation) Room

Eyewash 2 x 500ml, 10 x 1ml

Eye Pod Dressing x 1

Napkins x 1

Roof Core 3 Lobby outside Plant Room

Eyewash 2 x 500ml, 10 x 1ml

Eye Pod Dressing x 1

Napkins x 1

Roof 10th floor Main core plant room North Plant access near generator

Eyewash 2 x 500ml, 10 x 1ml

Eye Pod Dressing x 1

Napkins x 1

Add signature

Fire lifts

This is to check the lift will switch over to Fireman's priority mode. Turn the key (22) the lift will ground and the doors will stay open.

no label
Fireman's lift LB10 main core.

Drive the lift any floor; press and hold the door open button.

Fireman's lift BL11 secondary core

Drive the lift any floor; press and hold the door open button.

Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.