Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Select the operations to be performed

Project Start Date

  • Select date

  • Describe the scope of project

Demolition Site Description

  • Building Type

  • Enter building size(sqft) and foot print dimensions

  • Is there other buildings to demolish (garage)? Take picture

  • Enter building size(sqft) and foot print dimensions

  • Is there a deck? Size and Take picture

  • Is there sidewalks? Square footage?

  • Is there a driveway? Size and material

  • Is there retaining walls? Enter size and material. Take picture

  • Is the site clear and ready for the operation (out buildings, trees, power poles, etc)? If no take picture and describe:

  • Is there alley access? If yes, describe conditions with any obstructions for loading and trucking including over head power lines

  • What are the distances to adjacent buildings?

Documentation

  • Has the demolition permit been obtained? If No, approximate date?

  • Have all utilities been disconnected? Power, water, gas

  • Take picture of each service disconnect ( power, water, gas)

  • Are there secondary utility and services have been located with current documentation?

  • Underground / Overhead services clearly identified if present prior to work starting?

Site pictures

  • Alpha side

  • Bravo side

  • Delta side

  • Charlie side

  • Alley

  • Out side

  • Other

Utility/Safety/Environmental

  • Enter all utilities

  • Utility
  • Utility type

  • Size/type location

  • Take picture of location

  • Address hazards

  • Hazards
  • Hazardous substances and dangerous goods clearly identified (labels) and correctly stored?

  • Has a hazard assessment been performed? If No, complete

  • Safety issues raised at daily Pre-starts or toolbox meetings have been noted and addressed?

  • PPE review - all personnel including subcontractors wearing the minimum and appropriate PPE for the job?

  • Are there any special Environmental / Cultural Heritage considerations for this project?

Sign off

  • Signature of person inspecting

  • Signature of supervisor on site

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.