Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Select the operations to be performed
Project Start Date
-
Select date
-
Describe the scope of project
Demolition Site Description
-
Building Type
- Bungalow
- Bungalow with attached garage
- Two Story
- Two story with attached garage
- Detached Garage
- Other
-
Enter building size(sqft) and foot print dimensions
-
Is there other buildings to demolish (garage)? Take picture
-
Enter building size(sqft) and foot print dimensions
-
Is there a deck? Size and Take picture
-
Is there sidewalks? Square footage?
-
Is there a driveway? Size and material
-
Is there retaining walls? Enter size and material. Take picture
-
Is the site clear and ready for the operation (out buildings, trees, power poles, etc)? If no take picture and describe:
-
Is there alley access? If yes, describe conditions with any obstructions for loading and trucking including over head power lines
-
What are the distances to adjacent buildings?
Documentation
-
Has the demolition permit been obtained? If No, approximate date?
-
Have all utilities been disconnected? Power, water, gas
-
Take picture of each service disconnect ( power, water, gas)
-
Are there secondary utility and services have been located with current documentation?
-
Underground / Overhead services clearly identified if present prior to work starting?
Site pictures
-
Alpha side
-
Bravo side
-
Delta side
-
Charlie side
-
Alley
-
Out side
-
Other
Utility/Safety/Environmental
-
Enter all utilities
Utility
-
Utility type
- gas
- power
- Telus
- water
- sewer
- storm
-
Size/type location
-
Take picture of location
-
Address hazards
Hazards
-
Hazardous substances and dangerous goods clearly identified (labels) and correctly stored?
-
Has a hazard assessment been performed? If No, complete
-
Safety issues raised at daily Pre-starts or toolbox meetings have been noted and addressed?
-
PPE review - all personnel including subcontractors wearing the minimum and appropriate PPE for the job?
-
Are there any special Environmental / Cultural Heritage considerations for this project?
Sign off
-
Signature of person inspecting
-
Signature of supervisor on site