Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
PROCEDURE CHECKLIST
-
In use
VERIFICATION CHECKLIST
-
In use
TEST RESULTS
-
Attached to checklist
NON-CONFORMANCE
-
Identified by Contractor
NON-CONFORMANCE REPORT
-
Submitted
FOUNDATION Clause R 32.16.1
-
Suitable
-
Additional excavation approved
REPLACEMENT BACKFILLING
-
Material conforms to specification
-
Layer thickness <200mm
-
Compaction 95% standard
FORMWORK
-
Condition
-
Fillets fixed at exposed edges
-
Pour area cleaned out
-
Dimensions
REINFORCEMENT
-
Bar diameter
-
Number of bars
-
Bar chairs suitable
-
Mesh type
-
Reinforcement condition
-
Cover
CONCRETE
-
Placement method
-
Compaction
-
Finish
-
Curing method
-
Stripping time
-
Exposed faces bag washed
-
Pipe rendered
-
Slump results
-
Concrete strength result at 28 days
-
Pipe surround grouted within headwall
NON-CONFORMANCE
-
Identified by audit
-
Report requested.
-
Signature