Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
PROCEDURAL CHECKLIST
-
In use
Verification Checklist
-
In use
TEST RESULTS
-
Attached to checklist
NON-CONFORMANCE
-
Identified by Contractor.
NON-CONFORMANCE REPORT
-
Submitted
PRELIMINARIES
-
Services complete
-
Underlying lot conforms
-
-
Design calcs & target applications submitted.
-
Evidence dry back moisture < 70%
-
Traffic management - staging of works.
-
Evidence of sampling and testing.
-
Seal design received 10 days prior.
-
Nomination of aggregates form submitted
-
Substrate measurements.
-
Hold point prior to sealing released.
-
Evidence of compliance bituminous materials.
ANALYSIS OF AUDIT SAMPLES
-
Sealing aggregate gradings
-
Sealing aggregate pre-coated.
-
Sealing aggregate shape requirements
-
Aggregate durability and resistance to stripping.
-
Sealing aggregate free of adhered dust.
-
Bitumen class 170 residual.
-
Bitumen density > 1kg/l @ 15deg. C
-
Bitumen viscosity
-
Adhesion agent > 0.5% volume
APPLICATION PROCESS
-
Rotary broom, rollers, sprayer, spreaders.
-
Traffic control and warning signs.
-
Temporary pavement markers.
-
Swept surface.
-
Minor surface defects repaired prior to seal.
-
Concrete & adjacent infrastructure protected.
-
Shade temperature.
-
Primer and bitumen temperature
-
Application temperature
-
Spraying technique
-
Aggregate pre-coated free of water/ dust.
-
Rolling methods
-
Embedment of aggregate
-
Seal width
-
Weather conditions
-
Wind drift concerns addressed.
-
Daily spraying sheets received.
-
Application rates achieved
-
Loose aggregate removed after sealing.
NON-CONFORMANCE
-
Identified by audit
-
Report requested