Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Item 2.1 must be answered to export audit.

1. Employee Welfare

  • 1.1 Portable water readily available for all employees

  • 1.2 Adequate toilets, washing facilities and maintenance

  • 1.3 First aid, universal precautions and chemical protection supplies available, accessible and stocked

2. Procedures

  • Please enter all safety discussions and correction from the entire work week in 2.1

  • 2.1 List all hazards with corrective actions found throughout the week.

  • 2.2 Are there any Safety violations notification forms written and issued during audit?

  • 2.3 Startup kit information posted

  • 2.4 No smoking signs posted and enforced

  • 2.5 3SP and SDS manuals up to date and available in trailer/office

  • 2.6 Emergency evacuation procedures reviewed and rehearsed

  • 2.7 Site safety orientation conducted for all employees, orientation stickers and name tags issued for hard hats.

  • 2.8 Weekly toolbox trainings conducted for AMH and all subs

  • 2.9 Weekly safety inspections are documented and turned in to AMH

  • 2.10 Daily Huddles completed and documented.

  • 2.11 Do any JHAs need updated?

  • 2.12 Have prework meetings been held for high risk activities, such as crane, roof, excavation, confined space work?

3. Access

  • 3.1 Adequate no trespassing & construction signs, public access is restricted

  • 3.2 Proper illumination is in all areas is maintained and adequate, (5 foot candles for general access)

  • 3.3 Emergency exits identified and labeled

  • 3.4 Public is protected from open excavations, falling objects, equipment and other.

  • 3.5 ABC fire extinguishers available within 100'; 3000 square feet; refuel ops >25',<75' and inspected on a monthly basis

  • 3.6 Walking/Working surfaces are free of trip/slip/fall hazards. (Including Ice, snow, and water)

  • 3.7 Is Housekeeping in safe and sanitary condition?

  • Where are the areas that need housekeeping?

  • Pictures

  • 3.8 All impalement hazards are protected, including but not limited to rebar, steel form pins, and other stub ups.

4. Chemical, Fuel and HazCom

  • Are Fuels/Chemicals (Diesel, Gasoline, Propane, Oxy/Acet, other bulk chemicals stored onsite?

  • 4.2 Flammables/chemicals stored in approved, secured areas with spill containment, spill kit and fire extinguisher in place

  • 4.3 Bonding used during flammable liquid transfer

  • 4.4 Bulk fuel containers grounded properly and stored 20' from building

  • 4.5 Compressed gas cylinders stored upright and secured with valve caps in place

  • 4.6 Oxy/fuel cylinders are separated when not in use or installed with a fire wall

  • 4.7 Fire extinguishers no less than 25' where flammable liquids of 5 gallons or more are stored

  • 4.8 All chemicals have proper GHS labeling and associated Safety Data Sheets.

5. Elevated Work

  • Remember: OSHA does not recognize distance from a leading edge!

  • Is there any work above ground level on the project?

  • 5.4 All Fall protection exposures eliminated or protected.

  • 5.4.1 Are all horizontal lifelines pre-engineered systems or supported with documentation from a PE?

  • 5.4.2 All anchorage points are verified to be 5000 lbs strength, and connective device is attached properly?

  • 5.5 Guard rail system in place (+- 42" with 200# capacity) for top rail and mid rail (150# capacity) and toeboard in place<br>

  • 5.5.1 All warning flagging is of proper material, height, and distance from leading edge. (6' for roofers, 15' for rest)

  • 5.6 Holes and openings protected and/or covered and labeled "hole" or "cover"

  • 5.7 Non-conductive ladders are used

  • 5.8 Step ladders are used in full and open position

  • 5.9 Extension ladders 36" above landing or have grab rail, tied off, 4:1 ratio

  • 5.10 Are ladders in good condition and properly labeled.

  • Is there any scaffolding onsite?

  • 5.11 Scaffolding set up properly with ALL crossbraces, mudsills, horizontal bracing, planks, etc

  • 5.12 Competent person on site for scaffolding erection, dismantling and inspection

  • 5.13 Scaffolding inspected prior to every shift

  • 5.14 Is there proper scaffold access?

  • 5.15 Proper guardrail is in place on all sides of each accessible level, including the scaffold ends.

6. Tools and Electrical

  • 6.1 Guarding intact on all tools and equipment

  • 6.2 Extension cords are 3 wire type, in good condition, no electrical tape repairs and rated for outdoor use.

  • 6.4 GFCI in place for all temporary wire not plugged into GFCI protected outlet

  • 6.5 Live electrical and temp power splices and wire nut connections properly guarded against incidental contact.

  • 6.6 All electrical cabinets and panels are restricted from access by lock panel or locked door.

  • 6.7 Is all power shut down and locked out for demo operations?

7. PPE

  • 7.1 100% hard hats

  • 7.2 100% safety glasses, including prescription eyewear that meets ANSI standards.

  • 7.3 Task-specific PPE is properly utilized (Guards, Face shields, Gloves,etc.)

8. Excavations

  • Remember: Any excavation 4' deep needs monitored for cave ins, and may require protection. At 5' it's required.

  • Are there any Excavations/Trenching onsite?

  • 8.1 Competent person(s) identified:

  • 8.2 Is soil properly classified?

  • 8.3 Excavations are properly sloped, benched or shielding is in place, (type C can not be benched)

  • 8.4 Is there proper access for excavation?

  • 8.5 OUPS contacted prior to excavating.

  • 8.6 Is there proper protection from the general public and or other trades?

  • 8.7 All underground utilities located by device or pot holes.

9. Cranes

  • Is there a crane in use onsite?

  • 9.1 Cranes have documented daily inspections and annual certifications

  • 9.2 Crane swing radius is barricaded

  • 9.3 Qualified signal and rigging person identified

  • 9.4 Certified crane operator

  • 9.5 Documented inspections performed on all rigging

  • 9.6 Tag lines used on all picks

  • 9.7 Are all the outriggers fully extended, cribbed and on sturdy ground?

  • 9.8 Are there any overhead obstructions near the boom radius?

  • 9.9 All workers clear of overhead flight path

  • 9.10 All wire rope, hooks and sheaves in good condition

10. Mechanical Equipment (aerial lifts, fork lifts, earth moving)

  • Any mechanical equipment on site?

  • 10.1 Aerial lifts inspected prior to each use (aerial lifts contain annual and frequent inspections)

  • 10.2 Equipment operated by qualified operators

  • 10.4 Operator(s) are properly tied off with retractable lanyards in aerial lifts

  • 10.5 Have all other mechanical equipments been inspected on a daily basis with documentation?

11. Hot Work

  • Any Hot work onsite?

  • 11.1 Hot work permits completed prior to all hot work

  • 11.2 Welding curtains installed for welding and cutting

  • 11.3 Fire extinguishers in place

  • 11.4 All hot work is contained from endangering others

  • 11.5 Is fire watch in place during and for 30 minutes after hot work has stopped?

12. Confined Space

  • OSHA RELEASED NEW CONFINED SPACE REQUIREMENTS!

  • Has Owner provided all known Confined space locations and information

  • The owner is required to provide this information, have we asked for it?

  • Has the Controlling employer notification form been completed and submitted to all subs?

  • Have all subs submitted confined space locations?

  • 12.1 Are any spaces classified as permit required.

  • 12.2 Confined space work has testing and an attendant with established rescue procedures

  • 12.3 Are The workers properly trained?

  • 12.4 Has confined space permit been completed.

  • Has the Controlling employer notification form been completed and submitted to all subs?

  • Have all subs submitted confined space locations?

  • 12.1 Are any spaces classified as permit required.

  • 12.2 Confined space work has testing and an attendant with established rescue procedures

  • 12.3 Are The workers properly trained?

  • 12.4 Has confined space permit been completed.

13. Other

  • 13. Other Issues

  • Add media

  • Jobsite Photos

Signature

  • Signature

Ratings Section - FOR AMH SAFETY TEAM ONLY

  • Emergency procedures developed, rehearsed and up to date <br>3 - when emergency procedures are rehearsed and documented with appropriate steps every 6 months <br>+1 - for additional rehearsal with in a 6 month period <br>-1 - for every month behind a 6 month interval for rehearsals or missing key components of the rehearsal

  • Daily Safety inspections are documented with one per week turned in to AMH and Weekly toolbox safety training conducted and submitted weekly for AMH and Subs .<br>3 - for all detailed inspections with photos and toolbox talks submitted on a weekly basis.<br>+1 for additional toolbox talks, safety meetings, pre task meetings, near hit reports and/or additional highly detailed inspections with photos<br>-1 for missing weekly dead lines or poor weekly inspections.

  • General Housekeeping<br>3 - for a jobsite free of trip, access, fire and rodent hazards as a result of housekeeping<br>+1 - for a jobsite with an exceptional level of housekeeping detail<br>-1 - for jobsite with hazards created by housekeeping

  • Imminent danger exposures<br>3 - for zero imminent danger exposures <br>+1 for extra protection against imminent danger<br>-1 for unprotected imminent danger exposures.<br>

  • Orientations<br>3 - conducts orientation, collects proof of approved drug screening, photo ID, issues and reviews quizzes, issues and tracks orientation and name tape stickers.<br>-1 for workers who have not received orientation, started work without proper drug screening verification, or poor quiz reviewing.<br>+1 for continuous commitment to orientation process and or extra tracking processes and back checks to tracking procedures.

  • 100% PPE<br>3 - for entire job site using 100% eye and head protection along with all necessary task specific PPE<br>+1 - for exceeding PPE requirements and/or cumulative weeks of audits without any PPE deficiencies<br>-1 - for PPE deficiencies.

  • Corrective actions taken and documented within 72 hours of safety concern notification<br>3 - for all corrective actions from previous audits are complete with in 3 business days.<br>+1 for extra corrections and/or training<br>-1 for late or incomplete corrective action reports

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.