Inspection Checklist Title
-
Date
-
Contract Number
Contractor/Subcontractor
-
Contractor/Subcontractor
Location/Mile Posts/Stations/Direction/Side
-
Location/Mile Posts/Stations/Direction/Side
-
Inspector & IDR Office No./Ltr.
Field Review
8.0 HAULING EQUIPMENT -- SECTION 409.3(d) Hauling equipment clean and in good working condition.
-
Mixtures kept free of foreign substances.
-
Adequate covers of sufficient size and quality to protect the entire load under all conditions.
-
Mixture delivered free from lumps of chilled material.
-
Properly insulated when the air temperature is below l0oC (50oF) and from October 1 to April 30.
-
Break load of material prior to opening of tailgates
-
Sufficient quantity of vehicles to maintain a continous paving operation
9.0 BITUMINOUS PAVERS -- SECTION 409.3(e) Equipment capable of placing and finishing a uniform mixture to the width and depth indicated.
-
Power-propelled with activated screeds or strike-off assemblies and automatic screed controls.
-
Equipped with receiving hoppers of sufficient capacity.
-
Equipped with adequate distribution systems.
-
Capable of placing and finishing a uniform mixture to the width and depth indicated without tearing, shoving or gouging the mixture.
-
Paver wings emptied only when there is a minimum of 12 inches of material on the hopper conveyor.
-
Material Transfer Vehicle used to supply paver with surface course material for all mainline paving.
10.0 MIX TEMPERATURE -- SECTION 409.3(h) Temperature of mixture within specified limits.
-
Not lower than 8C (15F) below the minimum specified temperature on the bituminous supplier’s bill of lading for normal conditions.
-
Not lower than 14C (25F) below the minimum specified temperature on the bituminous supplier’s bill of lading for unforeseen delays.
-
Not higher than the maximum specified temperature on the bituminous supplier’s bill of lading.
-
Document the the mixture temperature of the first 5 loads of material placed in the Material Transfer Vehicle and periodically thereafter during placement.
11.0 SPREADING AND FINISHING -- SECTION 409.3(h) Mechanical equipment properly used to spread and strike off the mixture to the required cross-section and depth.
-
Paver distributed a uniform mixture for entire width.
-
Paver placed mixture to the required template, width and depth.
-
Paver did not tear, shove or gouge the mixture.
-
Approved materials used to clean equipment, tools, etc.
-
Exposed outer edges worked to avoid a sharp, ragged, open,or unfinished appearance and to prevent edge breakdown.
-
Curb gutters sealed evenly 300mm (12 inches) from curb with hot bituminous material of the class and type designated for the wearing course, E-6, or E-8, or two applications of AET emulsion.
-
Surface voids along curbs are completely filled and provides a watertight joint
12.0 PATTERN SEGREGATION -- SECTION 409.3(h)3 Suspected pattern segregation properly identified and evaluated.
-
Contractor notified of suspected segregation.
-
Severity of the segregated areas evaluated in accordance with PTM 751.
-
Corrective action taken if the average difference in pavement texture depth exceeds 0.61mm (0.024 in).
-
Paving operations suspended whenever pattern segregation has been determined through PTM 751.
-
Affected areas removed and replaced.
-
Test section of 180 tonne (200 tons) placed and evaluated prior to resuming normal paving.
Summary & Remarks
-
Rating
-
Remarks/Follow-up Action
-
Photo
-