Title Page
-
Site
-
Erf Number
-
Started on
-
Inspected by
-
Subcontractor
-
Foreman
-
Work Certified
-
Completed on
PRE WORK CHECKS:
-
SURVEYOR PEG SET OUT
-
Surveyor pegs as per drawing measurements
-
Surveyor pegs square
-
Any under DPC services
-
SITE CLEAN
SETTING OUT:
-
REFFERANCE PEGS SET OUT
-
TRENCH WITHS ACCORDING TO DRAWING
-
ESTABLISH TOP OF CONCRETE LEVEL
TRENCHING:
-
TRENCHES CORRECT WITH
-
TRENCHES SIDES AND CORNERS CUT STRAIGHT
-
TRENCHES DEPTH CORRECT
-
SERVICES INSTALLED WHERE NESACCERY
DPC:
-
DPC ACCORDING TO SPEC
-
DPC OVERLAPPING ADIQUATE
SHUTTERING:
-
SHUTTERS ACCORING TO SPEC
-
ADIQUATE BRACKETS
-
ADIQUATE FIXINGS
-
SHUTTERS ALIGNMENT CORRECT
-
Shutters measurements as per drawing
-
All shutters square
GENERAL:
-
HOUSEKEEPING – ONGOING, ALWAYS DO PRE WORK CHECK AND REPORT IF WORK AREA IS NOT CLEAN. AFTER WORK HAVE STARTED HOUSEKEEPING FOR WORK AREA IS YOUR RESPONSIBILETY!!!!!
-
REQUIRED PPE
-
SAFETY FILE UP TO DATE
APPROVALS:
-
FOREMAN SIGNATURE
-
SUBCONTRACTOR SIGNATURE
-