Title Page

  • Site

  • Erf Number

  • Started on

  • Inspected by

  • Subcontractor

  • Foreman

  • Work Certified

  • Completed on

PRE WORK CHECKS:

  • SURVEYOR PEG SET OUT

  • Surveyor pegs as per drawing measurements

  • Surveyor pegs square

  • Any under DPC services

  • SITE CLEAN

SETTING OUT:

  • REFFERANCE PEGS SET OUT

  • TRENCH WITHS ACCORDING TO DRAWING

  • ESTABLISH TOP OF CONCRETE LEVEL

TRENCHING:

  • TRENCHES CORRECT WITH

  • TRENCHES SIDES AND CORNERS CUT STRAIGHT

  • TRENCHES DEPTH CORRECT

  • SERVICES INSTALLED WHERE NESACCERY

DPC:

  • DPC ACCORDING TO SPEC

  • DPC OVERLAPPING ADIQUATE

SHUTTERING:

  • SHUTTERS ACCORING TO SPEC

  • ADIQUATE BRACKETS

  • ADIQUATE FIXINGS

  • SHUTTERS ALIGNMENT CORRECT

  • Shutters measurements as per drawing

  • All shutters square

GENERAL:

  • HOUSEKEEPING – ONGOING, ALWAYS DO PRE WORK CHECK AND REPORT IF WORK AREA IS NOT CLEAN. AFTER WORK HAVE STARTED HOUSEKEEPING FOR WORK AREA IS YOUR RESPONSIBILETY!!!!!

  • REQUIRED PPE

  • SAFETY FILE UP TO DATE

APPROVALS:

  • FOREMAN SIGNATURE

  • SUBCONTRACTOR SIGNATURE

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.